RDT&E Program Element · President's Budget PB2027

Joint Tactical Network (JTN)

PE 0605031A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$50.4M
Army · RDT&E
HitchAI read

U.S. Army funding ramps 21% to a $50.4M request in FY2027. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. C5ISR Center leads the industry work.

FY2027 Request
$50.4M
▲ 21% vs FY2026
FY2026 Enacted
$41.7M
▲ 39% vs FY2025
FY2025 Actual
$30.1M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $50.4M for Joint Tactical Network (JTN) under RDT&E program element 0605031A, up 21% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550030.1FY25ACTUAL41.7FY26ENACTED50.4FY27REQUEST51.2FY2845.0FY2938.8FY3039.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual30.1
FY2026Enacted41.7
FY2027Request50.4
FY2028Outyear51.2
FY2029Outyear45.0
FY2030Outyear38.8
FY2031Outyear39.2
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0605031A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 21% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$50.4M
House NDAA (HASC)HASC
$50.4M full · +$0
Senate NDAA (SASC)SASC
$50.4M full · +$0
House Approps (HAC-D)HAC_D
$50.4M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

C5ISR Center
$9.2M · 18%
Program Management Support - Matrix
NMRIL
$6.5M · 13%
JENM NMRIL Development
Where FY2027 funding flowsShare$M
Industry primes49%24.5
Other / unspecified51%25.9
FY2027 request100%50.4
See C5ISR Center's full federal contract ledger members
Program detail

Mission & acquisition strategy

EF5 project: The Joint Enterprise Network Manager (JENM) / Joint Network Management Software for Radio Terminals (JNMSRT) provides a single, converged network management tool allowing the Warfighter to plan, configure, load, and manage the Joint Services' Tactical Radios and their networks in the field - a capability not available in legacy planning systems.

Joint Tactical Network (JTN) is a Joint Services program supporting the development, testing, and integration of the Joint Enterprise Network Management (JENM) capabilities. The Army is the designated Lead Service for this effort in accordance with the JENM Acquisition Program Baseline (APB) which expires in Fiscal Year 2026 (FY26). To ensure continuous capability, the Army manages a Government Owned, Government Operated (GOGO) Software Development and Integration facility which employs competitive contracting strategies for continuous improvement of network management components.

Project EX6, EF5 — Waveforms
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0605031A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what C5ISR Center has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605031A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Joint Tactical Network (JTN) (PE 0605031A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605031A
Machine access
Markdown twin /programs/0605031A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$29.3M
▲ 19% vs FY2026
FY2026 Enacted
$24.6M
▲ 18% vs FY2025
FY2025 Actual
$20.8M
Prior year

Waveforms — one RDT&E project inside PE 0605031A. Congressional marks are recorded on the program element, not on a project.

Project EX6 — Waveforms — requests $29.3M in FY2027, 58% of the $50.4M requested for program element 0605031A. Year over year it grows 19% against FY2026.

Funding trajectory

Project EX6 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25020.8FY25ACTUAL24.6FY26ENACTED29.3FY27REQUEST28.3FY2830.1FY2930.3FY3030.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual20.8
FY2026Enacted24.6
FY2027Request29.3
FY2028Outyear28.3
FY2029Outyear30.1
FY2030Outyear30.3
FY2031Outyear30.6
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Program Management Office Supportflat
FY2025 actual$2.7M
FY2026 enacted$4.2M
FY2027 request$4.2M

Program Management support for PdM Waveforms. Funding will provide for matrix and contractor support for Waveforms development and program oversight.

FY2025 actual$14.9M
FY2026 enacted$14.7M
FY2027 request$17.1M

Funding will support the modernization of the Single Channel Ground and Airborne Radio System (SINCGARS) waveform to develop a more robust Electronic Warfare (EW) resiliency to include initial Frequency Hopping 4 (FH4) development and hardening of Patriot data mode to increase EW performance and range; Warrior Robust Enhanced Network…

Read the FY2027 plan →
Waveforms Test and Evaluation▲ 55%
FY2025 actual$0.9M
FY2026 enacted$3.9M
FY2027 request$6.0M

Funding will validate continued design and system engineering activities of SINCGARS TRANSEC enhancements and evaluations of FH4 development. Warrior Robust Enhanced Network (WREN) developmental Release B Lab and Field based risk reductions in support of 1QFY27 full Release B. Validate and test the enhancements and problem fixes of the…

Waveforms Software Support and System Engineering▲ 7%
FY2025 actual$2.2M
FY2026 enacted$1.8M
FY2027 request$1.9M

Funding will support radio services software, product enhancement, and systems engineering & integration (SE&I) as described above in support of PdM Waveforms. Support will include Lead Service activities for the integration of existing and emerging waveforms in the DoW; analysis of emerging needs and integration of new capabilities for…

Project EX6 — every activity in full →
Who's building it

Named performers on project EX6

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

C5ISR Center
$9.2M · 32%
Advanced
$4.5M · 15%
Sigmatech
$2.2M · 7.6%
Project detail

What project EX6 buys

This funding supports the Army's Next Generation Command and Control (NGC2) initiative to modernize Command and Control (C2) systems, Transport Layer. This project provides the transport technologies necessary to support the overall connectivity of the Unified Network. Waveforms technology assessments, integration, and configuration management enable seamless updates and fluid communication between echelons of the Unified Network. Waveforms delivers, maintains, and upgrades portable, interoperable, Mobile Ad-hoc Networking (MANET) waveforms, Advanced Networking Waveforms (ANWf), network management and monitoring protocols and standards, and network enterprise services in support of the ARMY network modernization strategy. These waveforms and services are deployed by technical insertion into production of, and field upgrades to, existing tactical radios. Waveforms will remain agile to accommodate emerging warfighter needs by addressing the following: 1) Waveform (WF) analysis and system engineering activities for DoW as Lead Service Activity for Ground/Line of Sight (LoS) Waveforms (currently TSM), Warrior Robust Enhanced Network (WREN), and Single Channel Ground and Airborne Radio System (SINCGARS)) in accordance with (IAW) Deputy Secretary of War memo for Enhancing DoW's Joint Tactical Networks and Datalink Modernization, 29 March 2019 2) Development and/or integration efforts of Broadcast Waveforms (i.e. SINCGARS, WREN, ANWf) and Radio Services (i.e. enterprise Over The Air Management (eOTAM)) in support of Army Network modernization, and agile mission support initiatives 3) Viability assessments of ANWf in support of the Integrated Tactical Network (ITN) and future capability sets to ensure waveform performance in advance of formal ITN experimentation and fielding activities FY 2027 funding will continue development, integration, and testing of new capabilities and waveform enhancements for SINCGARS, WREN, TSM, and ANWf. Additionally, funding supports the next generation Government developed waveforms and Radio Service applications, system and architectural engineering for ANWf radio communications technologies, post deployment software support for fielded versions of the waveforms and radio services, program management support, and examine modular and open system architectures (MOSA) to make future integration and waveform porting more efficient.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$21.1M
▲ 23% vs FY2026
FY2026 Enacted
$17.1M
▲ 84% vs FY2025
FY2025 Actual
$9.3M
Prior year

Joint Tactical Network (JTN) — one RDT&E project inside PE 0605031A. Congressional marks are recorded on the program element, not on a project.

Project EF5 — Joint Tactical Network (JTN) — requests $21.1M in FY2027, 42% of the $50.4M requested for program element 0605031A. Year over year it grows 23% against FY2026.

Funding trajectory

Project EF5 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

09.3FY25ACTUAL17.1FY26ENACTED21.1FY27REQUEST22.9FY2814.9FY298.4FY308.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual9.3
FY2026Enacted17.1
FY2027Request21.1
FY2028Outyear22.9
FY2029Outyear14.9
FY2030Outyear8.4
FY2031Outyear8.5
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

JENM Program Office Support▲ 2%
FY2025 actual$2.8M
FY2026 enacted$2.9M
FY2027 request$3.0M

The program office will continue to support the expansion of JNMS design, engineering, integration and test of planning and management capabilities for the Tactical Radio Network in support of Joint Service requirements through the use of Matrix and Contractor support. The program office enables Soldiers to manage their entire…

FY2025 actual$6.5M
FY2026 enacted$14.2M
FY2027 request$18.1M

Development funding will continue design, engineering, integration and test of planning and management application for the Tactical Radio network in support of the ANWf. Support to align with Army Network Modernization to enable Soldiers the ability to manage the entire consolidated tactical network in conjunction with Sailors, Marines…

Read the FY2027 plan →
Project EF5 — every activity in full →
Who's building it

Named performers on project EF5

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NMRIL
$6.5M · 31%
NM RIL
$2.0M · 9.6%
Project detail

What project EF5 buys

This funding supports Joint and Next Generation Command and Control (NGC2) initiatives to modernize Command and Control (C2) systems. The Joint Enterprise Network Manager (JENM) / Joint Network Management Software for Radio Terminals (JNMSRT) provides a single, converged network management tool allowing the Warfighter to plan, configure, load, and manage the Joint Services' Tactical Radios and their networks in the field - a capability not available in legacy planning systems. Funding supports the full suite of Software defined radios across the services, enabling them to utilize Mobile Ad Hoc Networking (MANET) and other waveforms to include: Mobile User Objective System (MUOS), TrellisWare Scalable Manet (TSM), Warrior Robust Enhanced Network (WREN), Warrior Robust Enhanced Network-Narrowband (WREN-NB), Demand Assigned Multiple Access (DAMA) Satellite Communications (SATCOM), Integrated Waveform (IW), VHF-UHF Line Of Sight (VULOS), Second Generation Antijam Tactical UHF Radio for NATO (SATURN) and Single Channel Ground and Airborne Radio System (SINCGARS) waveform. The Network Management Software provides the Commander the ability to quickly reconfigure critical networks and enhances the S6's ability to conduct Course of Action (COA) Analysis and the Military Decision-Making Process (MDMP), providing commanders critical information regarding their ability to communicate. FY 2027 RDT&E funds will be allocated to the continued development, integration, and testing of advanced capabilities supporting waveform enhancements for tactical communications systems such as SINCGARS, WREN, TSM, and ANWf. Key initiatives will focus on next-generation waveforms, creating innovative radio service applications, and performing detailed system and architectural engineering. These efforts will leverage a Modular Open Systems Approach (MOSA) to ensure future porting efficiencies and adaptability. In alignment with the JNMSRT Memorandum of Agreement, FY2027 RDT&E funding will also continue to support the ongoing design, engineering, and testing of network management capabilities for the Tactical Radio network. This will ensure full interoperability across Joint Service Networks and emerging systems. The primary deliverable will be mission-critical planning applications designed for modular, cross-platform deployment.

R-3 lines of work
  • Management Services
  • Product Development