R-2A Activity · President's Budget PB2027

Systems Engineering

Activity a4·Project 655238 — GROUND BASED STRATEGIC DETERRENT (GBSD)·PE 0605238F·U.S. Air Force
FY2027 Request
$783.0M
▲ 98% vs FY2026
HitchAI read

This activity requests $783.0M in FY2027, 17% of project 655238, up 98% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$783.0M
▲ 98% vs FY2026
FY2026 Enacted
$395.9M
▲ 31% vs FY2025
FY2025 Actual
$303.3M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 655238 of PE 0605238F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continue to mature Sentinel specifications, architecture, and design through rigorous systems engineering to include modular architectures, external interface management, modeling and simulation, and testing to ensure the appropriate level of maturity required for each technical review. Continue to collaborate with mission partners to enhance capabilities, maintain technical expertise, and ensure seamless integration of critical assets. Continue to improve certification processes, develop a common cryptographic device, and advance model-based systems engineering for efficient sustainment. Continue to align system requirements and architectural documentation. Execute systems security engineering activities: Systems Theoretic Process Analysis (STPA), supply-chain risk management, program protection planning and execution, and multi-disciplinary adversarial emulation and Red Team activities. These efforts will address the risks of a dynamic threat environment, to reduce technical, engineering, integration, test, and lifecycle cost risk. Finalize a comprehensive Survivability Certification Plan to continue, addressing nuclear survivability and hardening requirements. Continue to maintain emphasis on leveraging specialty engineering expertise across all disciplines to deliver a secure, reliable, and sustainable weapon system. This will be achieved through proactive processes, program-wide collaboration, and a focus on quality, timeliness, and cost-effectiveness.

FY2026 to FY2027 change

Funding increased due to the risk reduction / parallel path efforts identified through the program restructure activities, TMRR efforts to achieve MS-B, and the EMD prime contract schedule incentive fee identified in the "Omni-Mod” contract framework.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Mature Sentinel specifications, architecture, and design through rigorous systems engineering to include modular architectures, external interface management, modeling and simulation, and testing to ensure the appropriate level of maturity required for each technical review. Collaborate with mission partners to enhance capabilities, maintain technical expertise, and ensure seamless integration of critical assets. Improve certification processes, develop a common cryptographic device, and advance model-based systems engineering for efficient sustainment. Align system requirements and architectural documentation. Develop a comprehensive Survivability Certification Plan to address nuclear survivability and hardening requirements. Leverage specialty engineering expertise across all disciplines to deliver a secure, reliable, and sustainable weapon system. This will be achieved through proactive processes, program-wide collaboration, and a focus on quality, timeliness, and cost-effectiveness.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2505007500303.3FY25ACTUAL395.9FY26ENACTED783.0FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual303.3
FY2026Enacted395.9
FY2027Request783.0

This activity is 17% of project 655238's FY2027 request and 17% of PE 0605238F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

7 activities in project 655238

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 0605238F, project 655238 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.