RDT&E Program Element · President's Budget PB2027

Multi-Mission Maritime Aircraft (MMA) (P-8A)

PE 0605500N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$87.2M
◆ Scaling +112%
HitchAI read

U.S. Navy funding ramps 112% to a $87.2M request in FY2027. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. BAE Systems leads the industry work.

FY2027 Request
$87.2M
▲ 112% vs FY2026
FY2026 Enacted
$41.1M
▲ 25% vs FY2025
FY2025 Actual
$33.0M
Prior year

For fiscal year 2027, the U.S. Navy is requesting $87.2M for Multi-Mission Maritime Aircraft (MMA) (P-8A) under RDT&E program element 0605500N, up 112% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255075100033.0FY25ACTUAL41.1FY26ENACTED87.2FY27REQUEST107.2FY2884.6FY2955.0FY3056.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual33.0
FY2026Enacted41.1
FY2027Request87.2
FY2028Outyear107.2
FY2029Outyear84.6
FY2030Outyear55.0
FY2031Outyear56.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0605500N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 112% overall, which can hide much larger swings below.

Project 3368

P-8 Improvements

$87.2MFY2027 request ▲ 112%
FY2025 actual$33.0M
FY2026 enacted$41.1M
FY2027 request$87.2M
Product DevelopmentTest and EvaluationManagement Services

The P-8A MMA program's Assured Maritime Dominance Anti-Submarine Warfare (ASW), Anti-Surface Warfare (ASuW), and Intelligence, Surveillance, and Reconnaissance (ISR) activities include a sequence of Rapid Capability Insertions (RCI) and rapid development efforts to respond to evolving threats and adversary capabilities, which will retain cost effectiveness for winning major combat operations. In order to pace the threat, these efforts will incorporate incremental software and/or hardware improvements that increase/exceed the current performance envelope, to include reliability/maintainability improvements, obsolescence, periodic technology insertion, urgent operational needs, correction of deficiencies and flight safety issues to existing sensor capabilities, communications systems, mission systems, airframe and engine component systems, weapons capabilities, training systems and Tactical Operations Center (TOC) /Tacmobile support to build on the P-8A capability baseline. These planned and emergent requirements will be prioritized through either the Navy Integration and interoperability (I&I) aligned Capability Prioritization Process (CPP), P-8A Capability Roadmap and/or through Fleet identification of an Urgent Operational Need. The CPP process is supported by detailed analysis and the maturations of developing technologies. Assured Maritime Dominance activities include principal mission lethality, survivability against kinetic and non-kinetic threats, and capability persistence in high-level threat environments. Rapid Development efforts increase lethality through optimization of kill-chain software systems, employment of LRASM, and other weapon systems and Airborne Weapon Simulator capabilities. RCI4 capabilities include kill-chain/gap analysis, ASW Enhancements, common weapons synchronization, and Airborne Weapon Simulator continuation. RCI5 capabilities increase P-8A survivability through Radio Frequency Counter Measure (RFCM) Self Protection Pod/Advanced Survivability Pod (ASP) Certification, P-8A Survivability Assurance and distributed sensor network improvements.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$32.3M
FY2026 enacted$40.0M
FY2027 request$81.9M

Accelerate development and fielding of critical warfighting Rapid Capability Insertion (RCI) packages that deter attack and prevail in conflict. Key efforts include: Finalizing RCI-4 Common Weapons Synchronization /Airborne Weapons Simulator (AWS) to incorporate LRASM, Mk54 Mod 2 Torpedo capabilities, and ASW enhancements into the I3B2…

Read the FY2027 plan →
Conduct technical, cost, risk, test, and logistics analysis of proposed technologies▲ 360%
FY2025 actual$0.7M
FY2026 enacted$1.1M
FY2027 request$5.2M

FY2027 planned work Accelerate technical, cost, risk and logistics analysis of RCI-4 and RCI-5. Finalize RCI-4 Common Weapons Synchronization /AWS to incorporate LRASM, Mk54 Mod 2 Increment Torpedo capabilities and ASW enhancements into the I3B2 P-8A software configuration. Accelerate analysis of RCI-5 ASP and DBD requirements to enable rapid and affordable capability and insertion.

FY2026 to FY2027 change Increase of $4.108 in FY27 is for Program Mgmt Support for the SW integration, flight test and airworthiness certification.

FY2026 plans — current year Conduct technical, cost, risk and logistics analysis of proposed technologies. Evaluate system requirements through cost/performance trade-off analysis continuing the execution of RCI-5. Continuing RCI-4 efforts include the LRASM capability merge as well as the initial Mk54 Mod 2 capability into the baseline P-8A software configuration.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$87.2M
House NDAA (HASC)HASC
$87.2M full · +$0
Senate NDAA (SASC)SASC
$87.2M full · +$0
House Approps (HAC-D)HAC_D
$87.2M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

BAE Systems
$39.0M · 45%
Primary HW/SW Dev - ASP · CPFF
Boeing
$20.7M · 24%
Primary SW Int - ASP · CPFF
Where FY2027 funding flowsShare$M
Industry primes75%65.0
Other / unspecified25%22.2
FY2027 request100%87.2
See BAE Systems's full federal contract ledger members
Program detail

Mission & acquisition strategy

The P-8A Multi-mission Maritime Aircraft (MMA) program was initiated in response to the Joint Requirements Oversight Council (JROC) validated Mission Needs Statement, "Broad Area Maritime and Littoral Armed Intelligence, Surveillance and Reconnaissance" and the requirements for the program are defined in the P-8A Capability Production Document #791-88-09, validated and approved on 22 June 2009. A successful Critical Design Review was completed in June 2007. In August 2007 the Design Readiness Review was conducted and resulted in approval to obligate funding for the fabrication of the Stage II flight test aircraft. The first flight of P-8A occurred on 25 Apr 2009.

The P-8A acquisition strategy is designed to deliver the required capabilities while introducing additional competition throughout the program. Government Lead Capability Integrator (LCI) control over the designs and information promote cost-effectiveness, rapid capability fielding, and reduced acquisition and life-cycle costs. Additionally, technologies for P-8 modernization improvements are compartmentalized and delivered independently of one another as a series of ECPs, without risk to the overall program schedule or procurement cost.

Project 3368 — P-8 Improvements
  • Product Development
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what BAE Systems has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605500N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Multi-Mission Maritime Aircraft (MMA) (P-8A) (PE 0605500N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605500N