R-2A Activity · President's Budget PB2027

MADIS: Product Development

FY2027 Request
$23.4M
▲ 1441% vs FY2026
HitchAI read

This activity requests $23.4M in FY2027, 21% of project 2278, up 1441% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$23.4M
▲ 1441% vs FY2026
FY2026 Enacted
$1.5M
▼ 83% vs FY2025
FY2025 Actual
$8.8M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 2278 of PE 0605520M. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

-Initiates the integration of a new Electronic Warfare (EW) solution. This solution is required to satisfy non-kinetic defeat requirements and enable ease of new technology insertion and optimization of specific capabilities by fleet users dependent on threat set. -Initiates the development of hardware/software upgrades and added capabilities that increase overall system survivability through resilient scalable architecture (RSA). RSA is required to give commanders more flexibility with how they employ the MADIS, by allowing multiple MK1s to receive data link tracks from a single MK2. -Initiates development of multi-mode programmable ammunition (MMPA) for the 30MM cannon to maintain schedule alignment with the Army. The MMPA is required to provide better proximity ammunition against sUAS and will allow for one ammunition type, easing the need for a dual feed weapon system, and easing the logistical footprint. -Initiates integration of the multi-mode programmable ammunition contact fuze setter into the Remote Weapon Station (RWS) -Initiates the development of Loitering High Power Microwave (HPM) capability that can disrupt and/or destroy circuitry in adversarial UAS. This capability is required as part of a layered defense aimed at minimizing the number of threats that make it into the final protective fires ring.

FY2026 to FY2027 change

Increase from FY 2026 to FY 2027 due to the initiation of multiple efforts such as development of hardware/software that increase overall system survivability, development of multi-mode programmable ammunition for the 30MM cannon, integration of the multi-mode programmable fuze setter into the RWS as well as integration of a new EW solution. These initiatives collectively enhance lethality, survivability, and operational flexibility through the development and integration of advanced, multi-domain capabilities designed to counter emerging threats and reduce logistical demands.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

-Completes MADIS Virtual Training System development; includes software development costs -Continue MADIS Gunnery Training System development; includes software development costs -Initiate integration of the System Integration Labs (SIL) required to independently verify software, cyber requirements, and development of engineering change proposals

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

08.8FY25ACTUAL1.5FY26ENACTED23.4FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual8.8
FY2026Enacted1.5
FY2027Request23.4

This activity is 21% of project 2278's FY2027 request and 18% of PE 0605520M's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

18 activities in project 2278

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

MADIS: Product Development — this activity$23.4M ▲ 1441%
MADIS: Hardware/Software ECPs$18.9M ▲ 1233%MADIS CES-INCREASED LETHALITY: Test and Evaluation$16.2M ▲ 2010%MADIS: Test and Evaluation$15.8M ▲ 1389%O-CsUAS: Test and Evaluation$13.5M NEW
O-CsUAS: Product Development$8.1M NEW
O-CsUAS: Hardware$5.0M NEW
MADIS: Support Costs$2.8M ▲ 58%
I-CsUAS: Test & Evaluation$2.1M ▼ 18%
NGSRI: Test & Evaluation$2.0M ▼ 64%
MADIS CES- INCREASED LETHALITY: Support$1.5M ▲ 3%
L-MADIS: Product Development$0.9M ▼ 56%
L-MADIS: Test and Evaluation$0.8M ▼ 43%
MADIS: Management Services$0.2M ▲ 2%
MADIS CES - INCREASED LETHALITY: Product Development$0.0M ▼ 100%
L-MADIS: Support Costs$0.0M ▼ 100%
L-MADIS: Management Services$0.0M ▼ 100%
I-CsUAS: Support$0.0M
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0605520M, project 2278 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0605520M/2278/a0.md · MCP mcp.hitchintel.combudget_get_activity