RDT&E Program Element · President's Budget PB2027

Joint Light Tactical Veh (JLTV) Sys Dev & Dem

PE 0605813M·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$2.4M
Navy · RDT&E
HitchAI read

U.S. Navy funding falls 65% to a $2.4M request in FY2027. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. AM General leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$2.4M
▼ 65% vs FY2026
FY2026 Enacted
$7.0M
▼ 30% vs FY2025
FY2025 Actual
$9.9M
Prior year

For fiscal year 2027, the U.S. Navy is requesting $2.4M for Joint Light Tactical Veh (JLTV) Sys Dev & Dem under RDT&E program element 0605813M, down 65% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

09.9FY25ACTUAL7.0FY26ENACTED2.4FY27REQUEST2.5FY282.1FY292.1FY302.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual9.9
FY2026Enacted7.0
FY2027Request2.4
FY2028Outyear2.5
FY2029Outyear2.1
FY2030Outyear2.1
FY2031Outyear2.1
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0605813M

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -65% overall, which can hide much larger swings below.

Project 3209

Joint Light Tactical Vehicle

$2.4MFY2027 request ▼ 65%
FY2025 actual$9.9M
FY2026 enacted$7.0M
FY2027 request$2.4M
Product DevelopmentSupportTest and Evaluation

The JLTV and companion trailer is the Marine Corps' premier platform for modernizing the light fleet, replacing the HMMWV, and supporting Force Design capabilities. Funding supports the JLTV Family of Vehicles (FoV) to include the development and testing of Command, Control, Communications, Computers, & Intelligence (C4I) for integration with the JLTV. JLTV is a joint program between the U.S. Army and the U.S. Marine Corps, of which the U.S. Army is the procurement lead and primary inventory control authority (PICA) while the Marine Corps is the requirement lead. The JLTV FoV is capable of performing multiple mission roles designed to provide protected, sustained, and networked mobility for personnel and payloads across the full Range of Military Operations. RDT&E funding supports modernization of the JLTV Family of Vehicles by investigating technology insertions including, but not limited to, ambulance shelter kit design for the JLTV, vehicle electronics systems, and other emerging technologies and safety initiatives; engineering change orders (ECOs), and retrofits to maintain the configuration of the trucks being used to integrate various weapons platforms. Current Command, Control, Communications, Computers and Intelligence Surveillance and Reconnaissance (C4ISR) integration activities include integration of systems such as: Marine Air Defense Integrated System (MADIS) and Remote Weapons System (RWS) Cannon, Network on the Move (NOTM), Communications Emitter Sensing and Attack Systems (CESAS II), Joint Battle Command-Platform (JBC-P), Tactical Imagery Production System Next Generation (TIPS NG), Mobile Command Vehicle (MCV), and Navy Marine Expeditionary Ship Interdiction System (NMESIS) Key Leader Vehicle. FY 2027 budget activities for the JLTV Family of Vehicles (FoV) include system engineering/integration, engineering design analysis, Diminishing Manufacturing Sources and Material Shortages (DMSMS), and test efforts. Efforts will focus on development/enhancement efforts required for the integration of C4ISR requirements on the JLTV FoV; cyber scans to evaluate emerging threats and technologies; cyber security vulnerability assessments; and development/integration of associated fielded and force design capabilities where JLTV is the prime mover and other system technical support.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Joint Light Tactical Vehicle (JLTV)▼ 65%
FY2025 actual$9.9M
FY2026 enacted$7.0M
FY2027 request$2.4M

FY2027 planned work -Continue developmental and engineering change efforts including: energy efficiency upgrades such as anti-idle and initial analysis of a next generation powertrain that will consider a hybrid option; Cyber Scans to evaluate emerging threats and technologies; integration of the A2 engine; and cyber security vulnerability assessments, and development/integration of associated legacy and Force Design solutions for the JLTV system and integrated capabilities and software. -Continue to improve military equipment operational availability and readiness of MAGTF resources with JLTV as the prime mover. Work consists of improving at-platform data diagnostics and collection, data transmission and…

FY2026 to FY2027 change The net decrease from FY 2026 to 2027 reflects the ECP design and validation completion of the JLTV ambulance shelter kit (JASK).

FY2026 plans — current year -Complete the JASK design for future integration onto the Utility JLTV variant to replace the legacy HMMWV M997A2 4 litter shelter ambulance assigned to Logistics Combat Element (LCE) Medical Battalions and Marine Expeditionary Unit (MEU) Combat Logistics Battalions (CLBs). This is required to complete light fleet modernization. -Perform product validation testing on JASK.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$2.4M
House NDAA (HASC)HASC
$2.4M full · +$0
Senate NDAA (SASC)SASC
$2.4M full · +$0
House Approps (HAC-D)HAC_D
$2.4M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

AM General
$0.6M · 23%
System Technical Support · CPFF
Where FY2027 funding flowsShare$M
Industry primes23%0.6
Government labs & warfare centers77%1.8
FY2027 request100%2.4
See AM General's full federal contract ledger members
Program detail

Mission & acquisition strategy

The JLTV and companion trailer is the Marine Corps' premier platform for modernizing the light fleet, replacing the HMMWV, and supporting Force Design capabilities. Funding supports the JLTV Family of Vehicles (FoV) to include the development and testing of Command, Control, Communications, Computers, & Intelligence (C4I) for integration with the JLTV. JLTV is a joint program between the U.S. Army and the U.S. Marine Corps, of which the U.S. Army is the procurement lead and primary inventory control authority (PICA) while the Marine Corps is the requirement lead.

Joint Light Tactical Vehicle (JLTV) is a Joint Program Office (JPO) with the U.S. Army and U.S. Marine Corps as the two main components. The U.S. Army is the JLTV procurement lead and primary inventory control authority (PICA) while the Marine Corps is the requirement lead. The JLTV Program entered the Production and Deployment Phase with the Acquisition Decision Memorandum authorization on 25 August 2015. With Milestone C approval, the Low-Rate Initial Production (LRIP) fixed price contract was awarded to Oshkosh Defense LLC on 25 August 2015. This contract consisted of a three-year LRIP period with options for five additional years of Full Rate Production (FRP) deliveries.

Project 3209 — Joint Light Tactical Vehicle
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what AM General has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605813M (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Joint Light Tactical Veh (JLTV) Sys Dev & Dem (PE 0605813M)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605813M
Machine access
Markdown twin /programs/0605813M.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks