Roll-up of 6 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $33.5M for Management HQ - R&D under RDT&E program element 0605898N, down 22% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 41.4 |
| FY2026 | Enacted | 42.8 |
| FY2027 | Request | 33.5 |
| FY2028 | Outyear | 33.9 |
| FY2029 | Outyear | 34.5 |
| FY2030 | Outyear | 34.7 |
| FY2031 | Outyear | 35.3 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 6 — RDT&E Management Support.
6 projects roll up into PE 0605898N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -22% overall, which can hide much larger swings below.
ONR Management Headquarters
Air and Missile Defense Radar
Surf Combatant Combat System Imp
Naval Integrated Fire Control-Counter Air SE&I
Sub Combat System Improvement (ADV)
AIAMD is funded on 8 lines across 5 appropriations
This page shows $0.5M of AIAMD, 0.0% of the program's $2.89B FY2027 request. The rest is appropriated elsewhere.
| Also funded here | Type | Component | FY2027 $M |
|---|---|---|---|
| Lower Tier Air and Missile Defense (AMD) Sensor | Procurement | Army | 2,036.4 |
| AIAMD Software Development & Integration | RDT&E | Army | 653.7 |
| Air and Missile Defense Radar | RDT&E | Navy | 96.6 |
| Army Integrated Air and Missile Defense | RDT&E | Army | 87.6 |
| AIAMD FAMILY OF SYSTEMS (FOS) COMPONENTS | Procurement | Army | 16.4 |
| Joint Regional Integrated Air and Missile Defense Capabilities Mix (JRICM) | RDT&E | Defense-Wide | 1.6 |
| Air and Missile Defense (AMD) Electronic Warfare | RDT&E | Army | — |
| AIAMD total | Army, Defense-Wide, Navy | 2,892.8 |
Lines whose title names the program. 11 further lines only mention AIAMD in their justification text — those fund something else and are deliberately excluded from the total.
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Mission & acquisition strategy
The Management HQ - R&D program funds management headquarter civilian personnel salaries at the Office of Naval Research (ONR). These personnel support the management of the Naval Science and Technology (S&T) programs. This program also funds management headquarter contractor support for the Integrated Warfare Systems (IWS) Program Executive Office.
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0605898N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksScience & Technology Managment — one RDT&E project inside PE 0605898N. Congressional marks are recorded on the program element, not on a project.
Project 0824 — Science & Technology Managment — requests $19.4M in FY2027, 58% of the $33.5M requested for program element 0605898N. Year over year it falls 23% against FY2026.
Project 0824 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 21.1 |
| FY2026 | Enacted | 25.0 |
| FY2027 | Request | 19.4 |
| FY2028 | Outyear | 19.6 |
| FY2029 | Outyear | 20.0 |
| FY2030 | Outyear | 20.1 |
| FY2031 | Outyear | 20.5 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Continue to provide corporate MHA Non-Labor support in facilitating the purchase of the S&T programs for the Navy to ensure consistent external reporting. - Continue start of new structure within building.
What project 0824 buys
This project funds all basic costs of Office of Naval Research Management Headquarters Activity (MHA) non-labor in support of the entire Navy Science & Technology (S&T) program. Through this support, the S&T enterprise pursues the technological advances that enable the Fleet's ability to operate from a position of technological superiority. Specifically, funding facilitates the execution of the Navy's basic research, applied research, and advanced technology development programs at the nation's universities/colleges, Navy laboratories, Warfare Centers, and private industry.
ONR Management Headquarters — one RDT&E project inside PE 0605898N. Congressional marks are recorded on the program element, not on a project.
Project 3345 — ONR Management Headquarters — requests $13.2M in FY2027, 39% of the $33.5M requested for program element 0605898N. Year over year it falls 20% against FY2026.
Project 3345 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 19.0 |
| FY2026 | Enacted | 16.6 |
| FY2027 | Request | 13.2 |
| FY2028 | Outyear | 13.4 |
| FY2029 | Outyear | 13.6 |
| FY2030 | Outyear | 13.6 |
| FY2031 | Outyear | 13.9 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Continue to provide corporate MHA personnel salaries to facilitate the purchase of the S&T programs for the Navy to ensure consistent external reporting.
What project 3345 buys
This project funds all basic costs of Office of Naval Research Management Headquarters Activity (MHA) salaries in support of the entire Navy Science & Technology (S&T) program. Through this support, the S&T enterprise pursues the technological advances that enable the Fleet's ability to operate from a position of technological superiority. Specifically, funding facilitates the execution of the Navy's basic research, applied research, and advanced technology development programs at the nation's universities/colleges, Navy laboratories, Warfare Centers, and private industry.
Air and Missile Defense Radar — one RDT&E project inside PE 0605898N. Congressional marks are recorded on the program element, not on a project.
Project 3186 — Air and Missile Defense Radar — requests $0.5M in FY2027, 1.4% of the $33.5M requested for program element 0605898N. Year over year it falls 17% against FY2026.
Project 3186 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.7 |
| FY2026 | Enacted | 0.6 |
| FY2027 | Request | 0.5 |
| FY2028 | Outyear | 0.5 |
| FY2029 | Outyear | 0.5 |
| FY2030 | Outyear | 0.5 |
| FY2031 | Outyear | 0.5 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Continue risk reduction testing at ARDEL, including refinement of radar operation functions (calibration, fault detection/fault isolation, environmental adaptation), improving electronic protection capabilities, and continue data collection on ballistic missile defense targets of opportunity.
FY2026 to FY2027 change Funding decrease from FY 2026 to FY 2027 aligns with program requirements.
FY2026 plans — current year Continue risk reduction testing at ARDEL, including refinement of radar operation functions (calibration, fault detection/fault isolation, environmental adaptation), improving electronic protection capabilities, and continue data collection on ballistic missile defense targets of opportunity.
What project 3186 buys
This project provides management headquarters contractor support to the Integrated Warfare System (IWS) Program Executive Office (PEO). Through this support, technological advances are being developed, enabling PEO IWS to deliver "Enterprise" solutions for Naval Warfare Systems that operate seamlessly and effectively within the Fleet and Joint Forces.
Surf Combatant Combat System Imp — one RDT&E project inside PE 0605898N. Congressional marks are recorded on the program element, not on a project.
Project 1447 — Surf Combatant Combat System Imp — requests $0.2M in FY2027, 0.5% of the $33.5M requested for program element 0605898N. Year over year it falls 20% against FY2026.
Project 1447 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.2 |
| FY2026 | Enacted | 0.2 |
| FY2027 | Request | 0.2 |
| FY2028 | Outyear | 0.2 |
| FY2029 | Outyear | 0.2 |
| FY2030 | Outyear | 0.2 |
| FY2031 | Outyear | 0.2 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work - Continue to support Cruiser and Destroyer AEGIS Combat System (ACS) upgrades and integrate new equipment and systems to pace the threat and capture advances in technology.
FY2026 to FY2027 change FY 2026 to FY 2027 decrease aligns with program requirements.
FY2026 plans — current year - Continue to support Cruiser and Destroyer AEGIS Combat System (ACS) upgrades and integrate new equipment and systems to pace the threat and capture advances in technology.
What project 1447 buys
This project provides management headquarters contractor support to the Integrated Warfare System (IWS) Program Executive Office (PEO). This work supports Cruiser and Destroyer AEGIS Combat System (ACS) upgrades and integrates new equipment and systems to pace the threat and capture advances in technology.
Naval Integrated Fire Control-Counter Air SE&I — one RDT&E project inside PE 0605898N. Congressional marks are recorded on the program element, not on a project.
Project 3159 — Naval Integrated Fire Control-Counter Air SE&I — requests $0.2M in FY2027, 0.5% of the $33.5M requested for program element 0605898N. Year over year it falls 20% against FY2026.
Project 3159 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.2 |
| FY2026 | Enacted | 0.2 |
| FY2027 | Request | 0.2 |
| FY2028 | Outyear | 0.2 |
| FY2029 | Outyear | 0.2 |
| FY2030 | Outyear | 0.2 |
| FY2031 | Outyear | 0.2 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work - Continue to support the Navy's research and development efforts for NIFC-CA's System Engineering, Integration and Test (SEI&T) project. Assist with Test Events At SEA and Land Based Test events.
FY2026 to FY2027 change FY 2026 to FY 2027 decrease aligns with program requirements.
FY2026 plans — current year - Continue to support the Navy's research and development efforts for NIFC-CA's System Engineering, Integration and Test (SEI&T) project. Assist with Test Events At SEA and Land Based Test events.
What project 3159 buys
This project provides management headquarters contractor support to the Integrated Warfare System (IWS) Program Executive Office (PEO). This work supports Naval Integrated Fire Control - Counter Air (NIFC-CA) project. Through this support technological advances are being developed enabling PEO IWS to extend the Naval Theater Air and Missile Defense battlespace out to the maximum kinematic range of our weapons.
Sub Combat System Improvement (ADV) — one RDT&E project inside PE 0605898N. Congressional marks are recorded on the program element, not on a project.
Project 0223 — Sub Combat System Improvement (ADV) — requests $0.1M in FY2027, 0.3% of the $33.5M requested for program element 0605898N. Year over year it falls 4.4% against FY2026.
Project 0223 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.1 |
| FY2026 | Enacted | 0.1 |
| FY2027 | Request | 0.1 |
| FY2028 | Outyear | 0.1 |
| FY2029 | Outyear | 0.1 |
| FY2030 | Outyear | 0.1 |
| FY2031 | Outyear | 0.1 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work - Continue Advanced Processing Build (APB) development, integration, land-based testing, at-sea testing, and establishment of tactical scenarios.
FY2026 to FY2027 change No significant change from FY 2026 to FY 2027.
FY2026 plans — current year - Continue Advanced Processing Build (APB) development, integration, land-based testing, at-sea testing, and establishment of tactical scenarios.
What project 0223 buys
This project provides management headquarters contractor support to the Integrated Warfare Systems (IWS) Program Executive Office (PEO). This work supports Navy Acoustic Superiority and Technology Insertion Initiatives through the application of advanced development and testing of sensors and sensor processing systems supporting tactical control systems improvements. This addresses technology challenges to improve tactical control in littoral and open ocean environments for a variety of operational missions.