R-2A Activity · President's Budget PB2027

Facility restoration and modernization at the 96TW

Activity a0·Project 6606MC — Facility Restoration and Modernization - T&E·PE 0605976F·U.S. Air Force
FY2027 Request
$10.5M
▼ 33% vs FY2026
HitchAI read

This activity requests $10.5M in FY2027, 2.9% of project 6606MC, down 33% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$10.5M
▼ 33% vs FY2026
FY2026 Enacted
$15.8M
▲ 11% vs FY2025
FY2025 Actual
$14.3M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 6606MC of PE 0605976F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

96 TW FY 2027 Budget Year plans include HVAC, plumbing, and electrical facility system repairs for multiple test facilities; planning charettes for the range communications facility; fluid replacement and storm damage repair at McKinley Climatic Laboratory; multiple roof replacements; and planning charrette/design/construction for several failing facilities.

FY2026 to FY2027 change

Funding decreased $5.279 million due to completion of major HVAC repairs and return to normal funding levels.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

For FY 2026 Current Year, the 96TW is performing Restoration and Modernization (R&M) efforts across the range complex, including repair/replacement of Heating, Ventilation and Air Conditioning (HVAC), install/upgrade perimeter power, and expand asphalt for the Tactical Datalinks Test Lab; design for secondary fluid system and repair lowslope roofs at McKinley Climatic Laboratory; and roof repairs for the Central Control Facility (CCF).

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

014.3FY25ACTUAL15.8FY26ENACTED10.5FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual14.3
FY2026Enacted15.8
FY2027Request10.5

This activity is 2.9% of project 6606MC's FY2027 request and 2.9% of PE 0605976F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

3 activities in project 6606MC

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Facility restoration and modernization at AEDC$345.5M ▲ 96%Facility restoration and modernization at 412 TW$11.4M ▲ 65%
Facility restoration and modernization at the 96TW — this activity$10.5M ▼ 33%
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 0605976F, project 6606MC (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0605976F/6606MC/a0.md · MCP mcp.hitchintel.combudget_get_activity