R-2A Activity · President's Budget PB2027

Weapon Systems

FY2027 Request
$23.5M
▲ 46% vs FY2026
HitchAI read

This activity requests $23.5M in FY2027, 34% of project E25, up 46% on FY2026. The R-2A exhibit describes it across FY2025–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$23.5M
▲ 46% vs FY2026
FY2026 Enacted
$16.0M
▼ 21% vs FY2025
FY2025 Actual
$20.3M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project E25 of PE 0708045A. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continue supporting AMD capabilities focused on the affordability and producibility of DE systems, cannon tube production optimization, improving cold-plate brazing for high-power radar systems, and additive manufacturing processes for high-power radar systems, munitions, and scramjet components. Initiate efforts to reduce cost and improve producibility, yield, and performance of gallium nitride (GaN) transceiver circuit cards, as well as fully automate proximity module production to increase throughput.

FY2026 to FY2027 change

The increase in funding reflects the acceleration of DE system integration, cannon tube production optimization, full automation of proximity module production, improving cold-plate brazing for high-power radar systems, additive manufacturing production efforts for munitions and scramjet components, and improving the producibility of GaN transceiver circuit cards.

Before the request year

FY2025–FY2026: what came before

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continue developing and advancing manufacturing processes for weapon systems to include long-range precision fires, resulting in the affordability and producibility of advanced energetics, warheads, propulsion, guidance and navigation technology. Continue supporting air and missile defense (AMD) capabilities focused on the affordability and producibility of Directed Energy (DE) systems, advanced missiles and seekers, guidance and control, advanced aero structures / propulsion, air defense radar technologies, short-range air defense, long-range munitions, and indirect fire protection capability. Integrated plans are in place for multi-platform cannon tube production optimization meeting PEO GCS's cost, capacity, and fielding goals. Automate high-power interconnects and continue improving cold-plate brazing for high-power radar systems and additive manufacturing processes for high-power radar systems, munitions, and scramjet components.

FY2025 accomplishments

Program plans will continue to develop and advance manufacturing processes for weapon systems to include long range precision fires resulting in the affordability and producibility of advanced energetics, warheads, propulsion, guidance and navigation technology. Additionally, effort will support air and missile defense capabilities focused on the affordability and producibility of directed energy systems, advanced missiles and seekers, guidance and control, advanced aero structures / propulsion, air defense radar technologies, high energy laser weapons systems, short range air defense, long range munitions, and indirect fire protection capability. Integrated plans are in place for multi-platform cannon tube production optimization meeting program executive office ground combat system's cost, capacity, and fielding goals. Initiate efforts focusing on producibility of high power radar components to support Army acquisition performance and cost goals.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

020.3FY25ACTUAL16.0FY26ENACTED23.5FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual20.3
FY2026Enacted16.0
FY2027Request23.5

This activity is 34% of project E25's FY2027 request and 34% of PE 0708045A's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

5 activities in project E25

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Ground Systems$25.8M ▲ 47%
Weapon Systems — this activity$23.5M ▲ 46%
Networks and Command, Control, Communications and Intelligence$8.3M ▼ 45%
Aviation Systems$5.3M ▼ 5%
Soldier Systems$5.2M ▼ 54%
Source
FY2027 Department of the Army RDT&E Budget Justification · Exhibit R-2A · PE 0708045A, project E25 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access