RDT&E Program Element · President's Budget PB2027

End Item Industrial Preparedness Activities

PE 0708045A·U.S. Army·Approp. 2040 — RDT&E·BA7 — Operational System Development
FY2027 Request
$68.1M
⚑ Contested — House adds 25%
HitchAI read

U.S. Army funding falls 25% to a $68.1M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House added 25% (to $85.1M); the Senate added 37% (to $93.1M); House appropriators added 58% (to $107.6M).

FY2027 Request
$68.1M
▼ 25% vs FY2026
House mark
$85.1M
▼ $17.0M vs request
FY2026 Enacted
$90.8M
In law

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $68.1M for End Item Industrial Preparedness Activities under RDT&E program element 0708045A, down 25% from FY2026. In the FY2027 defense authorization, House moved to raise it to $85.1M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255075084.8FY25ACTUAL90.8FY26ENACTED68.1FY27REQUEST68.8FY2869.3FY2970.0FY3070.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual84.8
FY2026Enacted90.8
FY2027Request68.1
FY2028Outyear68.8
FY2029Outyear69.3
FY2030Outyear70.0
FY2031Outyear70.7
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0708045A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -25% overall, which can hide much larger swings below.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$68.1M
House NDAA (HASC)HASC
$85.1M +$17.0M · +25%
Senate NDAA (SASC)SASC
$93.1M +$25.0M · +37%
House Approps (HAC-D)HAC_D
$107.6M +$39.5M · +58%
▲ $22.5M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Other / unspecified100%68.1
FY2027 request100%68.1
Program detail

Mission & acquisition strategy

This Program Element (PE) funds the Army Manufacturing Technology (ManTech) program, which develops, demonstrates, and transitions manufacturing technologies and processes that enable improvements in producibility and affordability of components and subsystems of Army weapon platforms and systems. Army ManTech matures technologies from Manufacturing Readiness Level (MRL) 4, which is the capability of producing the technology in a laboratory environment, up to MRL 7, which is the capability of producing systems, subsystems, or components in a production-relevant environment.

Not applicable for this item.

Project E25, EA2 — Mfg Science & Tech
  • Product Development
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House do to this request, and what is still unresolved?Which project inside PE 0708045A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0708045A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "End Item Industrial Preparedness Activities (PE 0708045A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0708045A
Machine access
Markdown twin /programs/0708045A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$68.1M
▲ 3.4% vs FY2026
FY2026 Enacted
$65.8M
▲ 1.4% vs FY2025
FY2025 Actual
$64.9M
Prior year

Mfg Science & Tech — one RDT&E project inside PE 0708045A. Congressional marks are recorded on the program element, not on a project.

Project E25 — Mfg Science & Tech — requests $68.1M in FY2027, 100% of the $68.1M requested for program element 0708045A. Year over year it grows 3.4% against FY2026.

Funding trajectory

Project E25 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550064.9FY25ACTUAL65.8FY26ENACTED68.1FY27REQUEST68.8FY2869.3FY2970.0FY3070.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual64.9
FY2026Enacted65.8
FY2027Request68.1
FY2028Outyear68.8
FY2029Outyear69.3
FY2030Outyear70.0
FY2031Outyear70.7
Inside the project

5 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Networks and Command, Control, Communications and Intelligence▼ 45%
FY2025 actual$15.5M
FY2026 enacted$15.2M
FY2027 request$8.3M

Continue cost reduction of anti-jammer antennas, eliminating the interlayer epoxy in the manufacture of compound semiconductors to dramatically improve transmission and simplify the FPA fabrication process, and simplifying the manufacturing process and improving yield, cost, and performance of IR sensor layers utilizing direct bond…

FY2025 actual$20.3M
FY2026 enacted$16.0M
FY2027 request$23.5M

Continue supporting AMD capabilities focused on the affordability and producibility of DE systems, cannon tube production optimization, improving cold-plate brazing for high-power radar systems, and additive manufacturing processes for high-power radar systems, munitions, and scramjet components. Initiate efforts to reduce cost and…

Read the FY2027 plan →
FY2025 actual$15.1M
FY2026 enacted$17.6M
FY2027 request$25.8M

Continue addressing advanced manufacturing processes for high-performance / lower-weight armor materials for Army platforms and ramp up efforts focused on manufacturing advanced systems for ground platforms. Continue effort to reduce RDX production requirements for the MICLIC to improve manufacturability and effectiveness while reducing…

Read the FY2027 plan →
Aviation Systems▼ 5%
FY2025 actual$7.3M
FY2026 enacted$5.6M
FY2027 request$5.3M

Program plans will continue to mature manufacturing processes and capabilities supporting rotary aircraft components and UAS, leveraging advanced manufacturing techniques (e.g., additive manufacturing, cold spray).

Soldier Systems▼ 54%
FY2025 actual$6.7M
FY2026 enacted$11.5M
FY2027 request$5.2M

Continue production process improvements for next-generation 6.8mm ammunition and production process improvements for the manufacturing of low-cost flame-resistant textiles.

Project E25 — every activity in full →
Project detail

What project E25 buys

This Project develops and demonstrates manufacturing technologies and processes that enable improvements in producibility and affordability of emerging and enabling components and subsystems of Army ground and air platforms, Soldier systems, weapons systems, air and missile defense systems, and sensors and electronics. Work is performed to advance the state-of-the-art, leveraging automation in manufacturing processing and fabrication techniques for coatings, multifunctional materials, and structural elements for Army-specific applications.

R-3 lines of work
  • Product Development
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$25.0M
▲ 26% vs FY2025
FY2025 Actual
$19.8M
Prior year

MANTECH INITIATIVES (CA) — one RDT&E project inside PE 0708045A. Congressional marks are recorded on the program element, not on a project.

Project EA2 — MANTECH INITIATIVES (CA) — requests in FY2027, 0.0% of the $68.1M requested for program element 0708045A. Year over year it falls 100% against FY2026.

Funding trajectory

Project EA2 funding, FY2025–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25019.8FY25ACTUAL25.0FY26ENACTED
Actual Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual19.8
FY2026Enacted25.0
Project detail

What project EA2 buys

Congressional Interest Item funding provided for ManTech Initiatives. These efforts will test and evaluate transparent armor laminated material processing methodologies and develop manufacturing methodologies for laminated transparent armor material, and establish material/process qualification plans for advanced manufacturing of traditionally large, difficult-to-additively manufacture forged components for CH-47, UH-60, and AH-64.

R-3 lines of work
  • Product Development