R-2A Activity · President's Budget PB2027

Integration and Technology Futures

FY2027 Request
$14.1M
▲ 5.5% vs FY2026
HitchAI read

This activity requests $14.1M in FY2027, 30% of project 642611, up 5.5% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$14.1M
▲ 5.5% vs FY2026
FY2026 Enacted
$13.4M
▼ 2.0% vs FY2025
FY2025 Actual
$13.6M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 642611 of PE 1206438SF. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

-Conduct technical development and integration activities against relevant threat systems and technologies in preparation for operational requirements. This includes modeling, simulation, and analysis for DSO, OSO, SDA, and Battle Management Command, Control and Communications (BMC3) capabilities. The program supports updating these models with the current threat information for SDA and BMC3 capabilities in performing individual mission threads and campaign analysis. -Support requirements development of space enterprise kill chains integration, including the identification and assessment of risks and gaps in the current and future space control architecture. Provide engineering requirements and configuration management, including development of governance documents, change management, risk management, and engineering reviews. -Provide functional analysis support critical to determining requirements for the future space control architecture. -Rapidly respond to implement system resiliency and situational awareness necessary to operate in the contested space domain. Activities may include, but are not limited to, program office support, studies, technical analysis, experimentation, risk reduction, prototyping, and activities that may leverage commercial, U.S. Government partnership, and international opportunities to respond to existing and emerging adversarial threats with speed and agility.

FY2026 to FY2027 change

FY 2027 funding increased due to inflation.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Conduct technical development and integration activities against relevant threat systems and technologies in preparation for operational requirements. This includes performing modeling, simulation, and analysis for DSO, OSO, SDA, and C2 capabilities using the Battle Management Kill Chain (BMKC) model and other models available (e.g., FFRDC Aerospace models). The program supports updating these models with the current threat information for SDA and C2 capabilities in performing individual mission threads and campaign analysis. Conduct systems engineering and mission architecture engineering activities to allow Space Force to link its individual space defense programs to define the enterprise-level system requirements supporting the Joint warfighter. Perform intelligence analysis and coordination to support the development of DSO, OSO, SDA, and C2 enterprise-level system requirements.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

013.6FY25ACTUAL13.4FY26ENACTED14.1FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual13.6
FY2026Enacted13.4
FY2027Request14.1

This activity is 30% of project 642611's FY2027 request and 23% of PE 1206438SF's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

3 activities in project 642611

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Rapid Reaction Branch$21.7M ▲ 4%
Integration and Technology Futures — this activity$14.1M ▲ 5%
Space Force TENCAP$10.6M NEW
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 1206438SF, project 642611 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/1206438SF/642611/a1.md · MCP mcp.hitchintel.combudget_get_activity