Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Space Force is requesting $65.7M for Major T&E Investment - Space under RDT&E program element 1206759SF, down 66% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 216.3 |
| FY2026 | Enacted | 196.0 |
| FY2027 | Request | 65.7 |
| FY2028 | Outyear | 63.6 |
| FY2029 | Outyear | 65.3 |
| FY2030 | Outyear | 66.8 |
| FY2031 | Outyear | 71.6 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 6 — RDT&E Management Support.
3 projects roll up into PE 1206759SF
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -66% overall, which can hide much larger swings below.
664597 - Professional Test Workforce
664598 - National Space Test and Training Complex (NSTTC)
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Mission & acquisition strategy
STARCOM is developing and operating the U.S. Space Force's Major Test and Evaluation (T&E) resources (Projects 660191, 664597, and 664598) to improve test for Guardians across the following mission areas: Science & Technology and Test & Evaluation; Space Domain Awareness; Position, Navigation, and Timing; Satellite Communications; Weather; Combat Power; and Launch. As a result, the Service will benefit from improved testing and validation of new capabilities across all Service Operational Functions, as well as streamlined capabilities development through improved institutional processes. This program funds the United States Space Force (USSF) Test Enterprise.
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/1206759SF.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marks660191 - Space Systems Operational Test & Eval — one RDT&E project inside PE 1206759SF. Congressional marks are recorded on the program element, not on a project.
Project 660191 — 660191 - Space Systems Operational Test & Eval — requests $60.6M in FY2027, 92% of the $65.7M requested for program element 1206759SF. Year over year it grows 45% against FY2026.
Project 660191 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 51.6 |
| FY2026 | Enacted | 41.7 |
| FY2027 | Request | 60.6 |
| FY2028 | Outyear | 58.5 |
| FY2029 | Outyear | 60.1 |
| FY2030 | Outyear | 61.5 |
| FY2031 | Outyear | 66.2 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Evolved Strategic Satellite Communications (ESS): Conduct Developmental & Operational (Integrated) Testing COBRA DANE: Conduct Cyber Test Future Operationally Resilient Ground Evolution (FORGE): Conduct Software Acquisition Pathway & cyber test Next Generation Overhead Persistent Infrared - Geosynchronous: Conduct IT&E and cyber test…
Read the FY2027 plan →What project 660191 buys
Space Operational Test and Evaluation refers to Congressionally mandated Space Initial Operational Test and Evaluation (IOT&E) to support major weapon system acquisition decisions beyond Low-Rate Initial Production (LRIP), Milestone C, full-rate production (FRP), fielding, and declaration of Initial Operational Capability (IOC). For Major Defense Acquisition Programs (MDAP), Title 10 USC 2399 requires IOT&E to be completed under realistic operating conditions before proceeding beyond LRIP. IOT&E will be planned to answer all Critical Operational Issues (COI) as thoroughly as possible. IOT&E is conducted to determine operational effectiveness and suitability and resolve overall mission capability of systems undergoing Research and Development (R&D) efforts. It is an evaluation of a system's performance when the complete system is tested and evaluated against operational criteria by personnel with the same qualifications as those who will operate, maintain and support the system when deployed. In general, IOT&E is performed on new systems in development, major modifications, and other systems as directed. This project provides funding for the USSF Operational Test Agency's participation in Integrated Test and Evaluation (IT&E). Additionally, it funds the Multi-service Operational Test and Evaluation (MOT&E) and Follow-on Operational Test and Evaluation (FOT&E) when it is the continuation of IOT&E activities past the FRP decision. FOT&E answers specific questions about unresolved COIs and test issues or completes areas not finished during the IOT&E. This effort also funds related Operational Test and Evaluation (OT&E) activities such as Early Influence (EI), Operational Utility Evaluations (OUE), Early Operational Assessments (EOA), and Operational Assessments (OA) which are independent OT&Es supporting major milestones and decision points, FRP, fielding, or declaration of IOC for USSF programs. USSF schedules and executes tests according to the forecasted test readiness of the MDAP program offices.
664597 - Professional Test Workforce — one RDT&E project inside PE 1206759SF. Congressional marks are recorded on the program element, not on a project.
Project 664597 — 664597 - Professional Test Workforce — requests $5.1M in FY2027, 7.8% of the $65.7M requested for program element 1206759SF. Year over year it grows 6.5% against FY2026.
Project 664597 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 5.9 |
| FY2026 | Enacted | 4.8 |
| FY2027 | Request | 5.1 |
| FY2028 | Outyear | 5.1 |
| FY2029 | Outyear | 5.2 |
| FY2030 | Outyear | 5.3 |
| FY2031 | Outyear | 5.4 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Continue producing Guardians with the necessary expertise in robust survivability testing, procedure validation, full-envelope characterization, and system performance validation. Continue acquiring accreditation to being a degree granting institution.
FY2026 to FY2027 change FY 2027 increase of 310K due to minor budget fluctuations.
FY2026 plans — current year Continue producing Guardians with the necessary expertise in robust survivability testing, procedure validation, full-envelope characterization, and system performance validation. Continue acquiring accreditation to being a degree granting institution.
What project 664597 buys
This project provides funding for the organizations, training, and activities required to develop a professional space T&E workforce, in conjunction with the USSF Chief Human Capital Officer. Funding primarily supports the development of the Space Test Course (STC) as the United States Air Force (USAF) Test Pilot School (TPS). The STC at USAF TPS will provide graduate-level education for the core space T&E workforce.
664598 - National Space Test and Training Complex (NSTTC) — one RDT&E project inside PE 1206759SF. Congressional marks are recorded on the program element, not on a project.
Project 664598 — 664598 - National Space Test and Training Complex (NSTTC) — requests $0.0M in FY2027, 0.0% of the $65.7M requested for program element 1206759SF. Year over year it falls 100% against FY2026.
Project 664598 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 158.8 |
| FY2026 | Enacted | 149.5 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
In FY 2027, funds transferred to new Program Element 1206617SF, Project 644441 Operational Test & Training Infrastructure.
What project 664598 buys
Provide space warfighters with interconnected, scalable, high-fidelity and distributed physical and digital ranges for full-spectrum test and training to develop, validate, and sharpen joint warfighting capabilities necessary to prevail and enable space superiority that is essential to achieve peace through strength.