RDT&E Program Element · President's Budget PB2027

AF Funded ORSSats

PE 1206857SF·U.S. Space Force·Approp. 3620F — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$10.0M
Space Force · RDT&E
HitchAI read

U.S. Space Force funding falls 36% to a $10.0M request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators added 101% (to $20.0M).

FY2027 Request
$10.0M
▼ 36% vs FY2026
FY2026 Enacted
$15.6M
▼ 85% vs FY2025
FY2025 Actual
$104.7M
Prior year

For fiscal year 2027, the U.S. Space Force is requesting $10.0M for AF Funded ORSSats under RDT&E program element 1206857SF, down 36% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550751000104.7FY25ACTUAL15.6FY26ENACTED10.0FY27REQUEST10.3FY2810.5FY2910.7FY3010.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual104.7
FY2026Enacted15.6
FY2027Request10.0
FY2028Outyear10.3
FY2029Outyear10.5
FY2030Outyear10.7
FY2031Outyear10.9
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 1206857SF

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -36% overall, which can hide much larger swings below.

Project 64A020

AF Funded ORSSats

$10.0MFY2027 request ▼ 36%
FY2025 actual$104.7M
FY2026 enacted$15.6M
FY2027 request$10.0M
Product DevelopmentManagement Services

The Space Rapid Capabilities Office (Space RCO) mission is to expedite the development and fielding of operationally focused capabilities for immediate and near term needs as directed by the Space RCO Board of Directors (BoD) for Guardians across Space Control, Operations, and Warfighting. Key operating principles include a short and narrow chain of command, overarching programmatic insight, early and prominent war fighter involvement, and small integrated teams within a single office to rapidly augment existing space capabilities when needed, to expand operational capability, reconstitute/replenish/protect critical space capabilities to reserve "continuity of operations" capability, and exploit space technological or operational innovations to increase U.S. advantage. As a result, the Service will deter, neutralize, defeat and/or destroy counterspace threats and defend the homeland. The Service will also augment, supplement, and/or integrate Allies, partners, and commercial space to USSF units. Furthermore, the Service will continue to advance all near term effects and provide resilient infrastructure, equipment, and personnel. The Space RCO is ready to develop, test, train, and equip war fighter needs as they are identified at any time. First, the requirements must be validated by the commander U.S. Space Command; second, the project must be approved by the Space RCO BoD; third, the project will be executed by the Space RCO. If the effort is initiated during execution year, it will be described in the next year's budget exhibit. Space RCO is supporting the Rapid Resilient Command and Control (R2C2) Combined Program Office (CPO) in FY 2025. The R2C2 CPO utilizes the Space RCO acquisition authorities under the Space RCO Program Executive Officer to execute funding in the Enterprise Ground Services (EGS) and Ground Command, Control, and Communications (GC3) program elements to develop an extensible, scalable, modular ground segment solution capable of supporting protect and defend missions of the United States Space Force. Combined EGS and GC3 funding will be used wholly and directly to support CPO activities. R2C2 will continue development and integration of the satellite operations (SatOps) ground segment solution to support the protect and defend mission set, including, but not limited to, capabilities and services needed to perform mission control.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Space RCO Board of Directors (BoD) Projects, Studies, and Analysis▲ 4%
FY2025 actual$9.2M
FY2026 enacted$9.6M
FY2027 request$10.0M

FY2027 planned work Will continue to initiate rapid acquisition projects, studies, and analyses that address emergent capabilities requirements and other Space RCO BoD approved efforts. Will continue ongoing systems engineering support of future mission development. Additionally, FY 2027 funding will allow the program to rapidly respond to implement system resiliency and situational awareness necessary to operate in the contested space domain. Activities include, but are not limited to, program office support, civilian pay, systems engineering, studies, technical analyses, experimentation, prototyping, etc.

FY2026 to FY2027 change FY 2027 increased due to inflation adjustment.

FY2026 plans — current year Continue to initiate rapid acquisition projects, studies, and analyses that address emergent capabilities requirements and other Space RCO BoD approved efforts. Continue ongoing systems engineering support of future mission development. Additionally, FY 2026 funding will allow the program to rapidly respond to implement system resiliency and situational awareness necessary to operate in the contested space domain. Activities include, but are not limited to, program office support, civilian pay, systems engineering, studies, technical analyses, experimentation, prototyping, etc.

Space RCO Solar Power
FY2025 actual$1.7M
FY2026 enacted$0.0M
FY2027 request$0.0M
Rapid Resilient Command and Control (R2C2) Satellite Command and Control Services
FY2025 actual$49.0M
FY2026 enacted$0.0M
FY2027 request$0.0M
Rapid Resilient Command and Control (R2C2) Cloud Infrastructure and Platform/Antenna Services
FY2025 actual$37.4M
FY2026 enacted$0.0M
FY2027 request$0.0M
Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$10.0M
House NDAA (HASC)HASC
$10.0M full · +$0
Senate NDAA (SASC)SASC
$10.0M full · +$0
House Approps (HAC-D)HAC_D
$20.0M +$10.0M · +101%
▲ $10.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Other / unspecified100%10.0
FY2027 request100%10.0
Program detail

Mission & acquisition strategy

The Space Rapid Capabilities Office (Space RCO) mission is to expedite the development and fielding of operationally focused capabilities for immediate and near term needs as directed by the Space RCO Board of Directors (BoD) for Guardians across Space Control, Operations, and Warfighting. Key operating principles include a short and narrow chain of command, overarching programmatic insight, early and prominent war fighter involvement, and small integrated teams within a single office to rapidly augment existing space capabilities when needed, to expand operational capability, reconstitute/replenish/protect critical space capabilities to reserve "continuity of operations" capability, and…

Expeditiously award contracts through Space RCO or partner organizations. The R2C2 Combined Program Office (CPO) has an approved acquisition strategy, leveraging Department of War (DoW)- and Department of the Air Force (DAF)-level contracts for commercial cloud capabilities, Other Transaction Agreements, and contracts awarded under a small business, multiple award Indefinite Delivery / Indefinite Quantity in FY 2024 operationalizing the satellite operations ground segment solution and providing support for protect and defend mission partners.

Project 64A020 — AF Funded ORSSats
  • Product Development
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 1206857SF (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "AF Funded ORSSats (PE 1206857SF)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/1206857SF
Machine access
Markdown twin /programs/1206857SF.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks