RDT&E Program Element · President's Budget PB2027

Joint Automated Deep Operation Coordination System (JADOCS)

PE 0203728A·U.S. Army·Approp. 2040 — RDT&E·BA7 — Operational System Development
FY2027 Request
$11.3M
◆ Scaling +34%
HitchAI read

U.S. Army funding ramps 34% to a $11.3M request in FY2027. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Testing leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$11.3M
▲ 34% vs FY2026
FY2026 Enacted
$8.4M
▲ 20% vs FY2025
FY2025 Actual
$7.0M
Prior year

For fiscal year 2027, the U.S. Army is requesting $11.3M for Joint Automated Deep Operation Coordination System (JADOCS) under RDT&E program element 0203728A, up 34% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

07.0FY25ACTUAL8.4FY26ENACTED11.3FY27REQUEST11.5FY2811.7FY299.0FY309.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual7.0
FY2026Enacted8.4
FY2027Request11.3
FY2028Outyear11.5
FY2029Outyear11.7
FY2030Outyear9.0
FY2031Outyear9.1
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0203728A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 34% overall, which can hide much larger swings below.

Project EF7

Precision Fires Warrior Dismounted & Mounted

$11.3MFY2027 request ▲ 34%
FY2025 actual$7.0M
FY2026 enacted$8.4M
FY2027 request$11.3M
Management ServicesProduct DevelopmentTest and Evaluation

This funding enables the Army's Next Generation Command and Control (NGC2) initiative to modernize Command and Control (C2) systems. PF-D/M is a software only program that is using a Continuous Integration/Continuous Delivery (CI/CD) approach to software development and capability deployment. This includes utilizing modern software development methodologies, tools/techniques (e.g., DEVSECOPS) and human-centered design processes (e.g., User Engagements) to iteratively develop and deliver software to meet Warfighter priority needs. The CI/CD approach will feature continuous development and integration with testing and user engagements as integral parts of the process to ensure delivered capability satisfies requirements and adds value for the Warfighter. PF-D/M is a software application that provides the dismounted and mounted Forward Observer (FO) and Fire Support Teams (FISTs) the ability to execute fire missions. Operating on the Nett Warrior End User Device (EUD), PF-D provides the dismounted FO and FISTs the ability and functionality to locate ground targets accurately and rapidly process a Call for Fires, which is the act of requesting a fire mission against the identified ground target. PF-D answers the Mobile/Handheld Computing Environment requirement that all handheld applications reside on the Nett Warrior EUD. PF-M replaces the Lightweight Forward Entry Device's (LFED) Forward Observer Software (FOS) at the maneuver company FIST, allowing them to identify ground targets and request fire missions. PF-M answers the Mounted Computing Environment (MCE) requirement to reside on the Mounted Family of Computing Systems (MFOCS). FY 2027 funding of $11.255 million will be utilized for continued development of capabilities into the targeted computing environments. Funding also supports alignment with Nett Warrior architecture changes for Precision Fires software to integrate within the MCE on fire support vehicles to include vehicle integration of BFIST and Stryker. In alignment with the Army's adoption of Next Generation Command and Control (NGC2), the program will further pursue the development of software-only solutions, while a hardware transition takes place.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Program Management Support Costs for PF-D/M▲ 63%
FY2025 actual
FY2026 enacted$0.5M
FY2027 request$0.8M

FY2027 planned work Project management support to include government matrix and contract personnel for management of systems integration, engineering development/integration, operations, and safety/information assurance.

FY2026 to FY2027 change Increase supports personnel to manage the cyber security and ensure safety issues are properly addressed at this phase of the project.

FY2026 plans — current year Project management support to include government matrix and contract personnel for management of systems integration, engineering development/integration, operations, and safety/information assurance. Management of PF-M systems integration into two vehicle platforms.

PF-D/M Software Development▲ 30%
FY2025 actual$7.0M
FY2026 enacted$7.6M
FY2027 request$9.9M

FY2027 planned work Continued modifications to PF-D software to align with Nett Warrior architecture changes for hosting on the EUD. Continue PF-M software integration with Mounted Computing Environment for hosting on the MFoCS on fire support platforms. Funding also supports alignment with Nett Warrior architecture changes for Precision Fires software to integrate and operate within the MCE on fire support vehicles to include vehicle integration of BFIST and Stryker. In alignment with the Army's adoption of Next Generation Command and Control (NGC2), the program will further pursue the development of software-only solutions, while a hardware transition takes place.

FY2026 to FY2027 change Increase supports development of software to align with the hosting provider (NW/SPECTRE) and TAK ecosystem integration.

FY2026 plans — current year Continued modifications to PF-D software to align with Nett Warrior architecture changes for hosting on the EUD. Continue PF-M software integration with MMC-S for hosting on the MFoCS on fire support platforms. Continue to incorporate necessary software changes to accommodate net-enabled weapons capability for joint service. Platform integration into BFIST and Stryker.

FY2025 accomplishments Continued modifications to PF-D software to align with Nett Warrior architecture changes for hosting on the EUD. Continue PF-M software integration with MMC-S for hosting on the MFoCS on fire support platforms. Continue to incorporate necessary software changes to accommodate net-enabled weapons capability for joint service. Platform integration into HMMWV and BFIST.

Testing for PF-D/M▲ 62%
FY2025 actual$0.0M
FY2026 enacted$0.4M
FY2027 request$0.6M

FY2027 planned work Continue Internal Certification and Validation, Developmental Test and User Engagement activities for both PF-D and PF-M to support CI/CD of software capabilities to meet Warfighter needs.

FY2026 to FY2027 change Increase supports testing of software to align with the hosting provider (NW/SPECTRE) and TAK ecosystem integration.

FY2026 plans — current year Continue Internal Certification and Validation, Developmental Test and STP activities for both PF-D and PF-M to support CI/CD of software capabilities to meet Warfighter needs.

FY2025 accomplishments Internal Verification and Validation, Developmental Test and Soldier Touchpoint activities for both PF-D and PF-M to support Continuous Integration and Continuous Delivery (CI/CD) of software capabilities to meet Warfighter needs.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$11.3M
House NDAA (HASC)HASC
$11.3M full · +$0
Senate NDAA (SASC)SASC
$11.3M full · +$0
House Approps (HAC-D)HAC_D
$11.3M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Testing
$0.6M · 5.8%
Test Support (Engineering Release)
DISA/DITCO
$0.3M · 2.7%
Program Management Support for PF-D/M (Contract) · CPFF
Where FY2027 funding flowsShare$M
Industry primes8.5%1.0
Government labs & warfare centers88%9.9
Other / unspecified4.0%0.5
FY2027 request100%11.3
See Testing's full federal contract ledger members
Program detail

Mission & acquisition strategy

Fire support is the effect of lethal and non-lethal weapons (fires) that directly support land, maritime, amphibious and special operations who engage enemy forces, combat formations and facilities in pursuit of tactical and operational objectives. Fire Support Command and Control (FSC2) systems automate the planning and execution of fire support operations, so appropriate munitions are paired with suitable weapons or group of weapons to adequately cover targets.

Precision Fires-Dismounted/Mounted (PF-D/M) is an Acquisition Category III program established to satisfy requirements captured in the Pocket-sized Forward Entry Device (PFED) Inc 2 Capability Production Document (CPD), which was approved as an IT Box requirement in 2016. Future requirements that fall within the CPD's scope and will be approved by the Fires Support Command and Control (FSC2) Tactical Software Requirements Governance Board and be documented in Fire Support Change Requests (FSCRs), formerly referred to as Tactical Software Change Requests (TSCRs).

Project EF7 — Precision Fires Warrior Dismounted & Mounted
  • Management Services
  • Product Development
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what Testing has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0203728A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Joint Automated Deep Operation Coordination System (JADOCS) (PE 0203728A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0203728A
Machine access
Markdown twin /programs/0203728A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks