Roll-up of 5 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $522.0M for Marine Corps Grnd Cmbt/Supt Sys under RDT&E program element 0603635M, up 134% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $361.2M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 89.4 |
| FY2026 | Enacted | 223.0 |
| FY2027 | Request | 522.0 |
| FY2028 | Outyear | 292.0 |
| FY2029 | Outyear | 280.9 |
| FY2030 | Outyear | 216.9 |
| FY2031 | Outyear | 159.2 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
5 projects roll up into PE 0603635M
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 134% overall, which can hide much larger swings below.
Multiple-Launch Rocket System Family of Munitions
Combat Capability Development Transition
SMAW Follow-On
Family of Expeditionary Fuel Systems (FEFS)
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 89% | 464.2 |
| Government labs & warfare centers | 0.1% | 0.7 |
| Other / unspecified | 11% | 57.1 |
| FY2027 request | 100% | 522.0 |
Mission & acquisition strategy
This PE is fundamentally a crucial "try before you buy" initiative for the Marine Corps' entire arsenal of ground combat and fire support systems. Its core purpose is to rigorously test, experiment with, and ultimately validate new or upgraded weapons and equipment in the most realistic scenarios possible before the Corps commits to a massive investment in full-scale production and fielding. This meticulous process ensures that every piece of gear eventually placed into the hands of a Marine is not only lethal and effective but also entirely reliable and perfectly suited for their unique mission, thereby safeguarding lives and taxpayer dollars by preemptively avoiding costly failures.
The LRUSV program used an incremental approach to develop capabilities that integrate vessels, autonomy packages, and sensor platforms in support of Marine Corps objectives. The Marine Corps integrated, tested, and verified different sized vessel platforms, autonomy packages, and sensor platforms to determine capability requirement feasibility, assess technical maturity, and refine the concept of employment. With the assistance of Naval Surface Warfare Center Carderock, the LRUSV program conducted risk reduction development and test activities supporting manned/unmanned teaming concepts and sea-based command and control (C2) of the LRUSV to inform future requirements of an unmanned surface vessel.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what General Dynamics has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0603635M.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksAdvanced Reconnaissance Vehicle — one RDT&E project inside PE 0603635M. Congressional marks are recorded on the program element, not on a project.
Project 1558 — Advanced Reconnaissance Vehicle — requests $506.6M in FY2027, 97% of the $522.0M requested for program element 0603635M. Year over year it grows 174% against FY2026.
Project 1558 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 51.3 |
| FY2026 | Enacted | 184.9 |
| FY2027 | Request | 506.6 |
| FY2028 | Outyear | 263.9 |
| FY2029 | Outyear | 232.9 |
| FY2030 | Outyear | 200.3 |
| FY2031 | Outyear | 148.4 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
-Incrementally fund 2 PPD agreements to Textron and GDLS for 16 systems each for a total of 32 systems -Continue to procure and deliver GFP (radios, satcom, turrets, guns, ammunition, etc.) -Begin sub-system level testing -Complete Critical Design Review (CDR) and approve design -Begin execution of provisioning conferences -Begin design…
Read the FY2027 plan →Named performers on project 1558
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 1558 buys
The Advanced Reconnaissance Vehicle (ARV) program is designed to fill a pressing operational need with the Marine Corps portfolio of reconnaissance, surveillance, and target acquisition systems. The ARV will be a purpose-built combat system, highly mobile on land and water, that can sense, communicate, and fight in the performance of reconnaissance and battlespace shaping activities. Equipped with modern command, control, communications, and surveillance systems the ARV will transform the ability of Fleet Marine Forces to sense and communicate within the littoral operating environment by providing a persistent and mobile systems of systems to augment and sustain effective sensor webs and kill chains. The base program will consist of the following mission role variants (MRV): ARV-30mm (ARV-30), ARV-Command, Control, Communications and Computers/Unmanned Aerial Systems (C4UAS) and ARV-Logistics (LOG). The complete family of systems capability is planned to consist of 3 additional mission role variants with initiation in FY 2028: ARV-Recovery (R), ARV-Precision Fires (PF) and ARV-Counter Unmanned Aerial System (CUAS).
- Product Development
- Support
- Test and Evaluation
- Management Services
Multiple-Launch Rocket System Family of Munitions — one RDT&E project inside PE 0603635M. Congressional marks are recorded on the program element, not on a project.
Project 6639 — Multiple-Launch Rocket System Family of Munitions — requests $9.4M in FY2027, 1.8% of the $522.0M requested for program element 0603635M. Year over year it falls 68% against FY2026.
Project 6639 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 7.9 |
| FY2026 | Enacted | 29.0 |
| FY2027 | Request | 9.4 |
| FY2028 | Outyear | 4.6 |
| FY2029 | Outyear | 11.4 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Completes development for one-to-three radio-controlled MLU operations - Conducts developmental testing including transportability, shock/vibration, environmental, and Electromagnetic Environment Effects (E3)
Named performers on project 6639
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 6639 buys
This line develops a Multiple Launch Rocket System (MLRS) Family of Munitions (MFOM) Launcher Unit (MLU). The MLU will interface with Medium-range Missile (MMSL) Remotely Operated Ground Unit for Expeditionary Fires (ROGUE-Fires) carriers providing the additional capability to fire the entire complement of MFOM. This modular capability is an essential element of the Marine Corps artillery modernization strategy as it affords operational flexibility for the artillery regiments and Marine Littoral Regiments (MLR) to utilize Navy/Marine Expeditionary Ship Interdiction System (NMESIS) or MLU. The MLU will consist of a MLU sled (launch unit with a Common Fire Control System (CFCS)) and a weapon control system (Remote Gunner Station (RGS)). The RGS is a modular, scalable tablet that can be operated from a Mobile Command Vehicle as well as from a command post and is being adapted to control up to three MLUs per section. The MLU sled will be mounted upon a ground-based, tele-operated carrier (ROGUE-Fires) and will be capable of firing Guided Multiple Launch Rocket System (GMLRS), Reduced Range Practice Rocket (RRPR), Precision Strike Missile (PrSM) series, and other MFOM-related munitions that the HIMARS platform can accommodate. A ROGUE-Fires leader-follower kit will be capable of steering up to three systems. This effort includes design, development, integration, and test of the MLU and RGS for interface with the ROGUE-Fires carrier. The MLU makes extensive use of existing systems to increase operational flexibility and reduce procurement and product support. FY 2026 completed the development of one-to-one radio-controlled operations, continued development for the one-to-three radio-controlled operations of the MLU, purchased test assets, and conducted developmental testing. FY 2027 completes the development of the one-to-three radio-controlled MLU operations and conducts testing.
- Product Development
- Support
- Test and Evaluation
Combat Capability Development Transition — one RDT&E project inside PE 0603635M. Congressional marks are recorded on the program element, not on a project.
Project 7400 — Combat Capability Development Transition — requests $5.5M in FY2027, 1.1% of the $522.0M requested for program element 0603635M. Year over year it falls 35% against FY2026.
Project 7400 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 23.8 |
| FY2026 | Enacted | 8.5 |
| FY2027 | Request | 5.5 |
| FY2028 | Outyear | 22.9 |
| FY2029 | Outyear | 36.1 |
| FY2030 | Outyear | 16.0 |
| FY2031 | Outyear | 10.1 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work - Conduct study on signature management capabilities for a manned vessel in support of requirement impacts and cost tradeoffs. - Conduct model-based systems and mission engineering analysis for manned vessel requirements. - Refine initial facilities studies focusing on the manned platform.
FY2026 to FY2027 change The decrease from FY 2026 to FY 2027 reflects the completion of the LRUSV effort and transition to design of the MMRC.
FY2026 plans — current year - Completed testing of enhancements to autonomy behaviors and communications architecture and integration of various sensor platforms. - Completed the initial manned-unmanned teaming integration efforts in support of the Maritime Reconnaissance Company. - Completed the testing of smaller form factor vessels for sensor and communication mission.
What project 7400 buys
The Marine Corps is establishing a new Maritime Reconnaissance Company (MRC) unit as part of the broader evolution of our light armored reconnaissance (LAR) battalions into mobile reconnaissance battalions (MRBs). The MRC will operate a new tactical boat, the Multi-Mission Reconnaissance Craft (MMRC), which can partner with unmanned systems to maneuver sensors and personnel in support of Marine forces operating in the littorals. Long Range Unmanned Surface Vessel (LRUSV) was an unmanned, semi-autonomous platform capable of multi-domain sensor collections that enabled the Marine Littoral Regiment / Marine Expeditionary Force to enhance Maritime Domain Awareness (MDA) for the Joint Force. LRUSV employed a suite of organic sensors (RADAR, EO/IR, and Electromagnetic Support) to accomplish its primary function of gaining and maintaining custody of surface contacts of interest in the littoral operating environment. LRUSV sensor capabilities assisted the Marine Division's Maritime Reconnaissance Company in its mission to conduct seaward Reconnaissance, Surveillance, and Target Acquisition (RSTA) in a peer-threat contested, littoral operating environment across the spectrum of competition, crisis, and conflict to enhance Joint and coalition MDA and facilitate the application of organic and Joint fires. Multi-Mission Reconnaissance Craft (MMRC) is a manned vessel, which when teamed with unmanned systems, will enable the stand-in force to use the sea as maneuver space, exploiting the predominate terrain in the littoral environment to extend their RSTA capabilities beyond the limitations of land-based systems. The capability will provide a persistent, fused, all weather maritime domain awareness collections capability that enables over-the-horizon (OTH) targeting and facilitates the application of organic and Joint fires. Additionally, the MMRC will insert and extract teams across challenging open water distances, emplace/recover sensors, and provide a stable, protected platform to maneuver specialist capabilities to seaward. In FY 2026, LRUSV implemented and completed sensor enhancements, conducted smaller form factor USV developmental testing, and completed facilities studies. Based on the completion of the LRUSV effort, in FY 2027 the Marine Corps is shifting focus to a manned MMRC platform.
- Product Development
- Support
- Test and Evaluation
- Management Services
SMAW Follow-On — one RDT&E project inside PE 0603635M. Congressional marks are recorded on the program element, not on a project.
Project 2614 — SMAW Follow-On — requests $0.6M in FY2027, 0.1% of the $522.0M requested for program element 0603635M. Year over year it grows 2.9% against FY2026.
Project 2614 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.5 |
| FY2026 | Enacted | 0.5 |
| FY2027 | Request | 0.6 |
| FY2028 | Outyear | 0.6 |
| FY2029 | Outyear | 0.6 |
| FY2030 | Outyear | 0.6 |
| FY2031 | Outyear | 0.6 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work - Continue testing of system technology refreshes to mitigate obsolescence and extend service life of fielded FOAAWS.
FY2026 to FY2027 change Decrease from FY 2026 to FY 2027 reflects the reduction of obsolescence mitigation efforts.
FY2026 plans — current year - Continued testing of system technology refreshes to mitigate obsolescence and extend service life of fielded FOAAWS.
FY2027 planned work - Continue research and testing into system technology refreshes to improve the combat capabilities throughout the FOAAWS portfolio. - Continue test efforts to reduce the effects of blast overpressure on Marines.
FY2026 to FY2027 change Increase from FY2026 to FY2027 reflects increased investments in blast overpressure mitigation.
FY2026 plans — current year - Continued testing of system technology refreshes to improve the combat capability of the MAAWS. - Initiated test efforts for training aids to reduce the effects of blast overpressure on Marines.
Named performers on project 2614
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2614 buys
The Family of Anti-Armor Weapon Systems (FOAAWS) portfolio supports multiple anti-armor solutions: Multi-purpose Anti-Armor Anti-Personnel Weapon System (MAAWS), Javelin Lightweight Command Launch Unit and its associated upgrades, and Saber Tube Launched Optically Tracked Wire Guided - Improved Target Acquisition System. These programs provide anti-armor, anti-personnel, anti-materiel, and assault capabilities to Marine Rifle Squads, Combat Engineers, Reconnaissance Teams, and Marine Corps Forces Special Operations Command to effectively execute both offensive and defensive operations. Also contained in FOAAWS is the research, development, test, and evaluation for a suite of ammunition which supports a wide range of mission sets including obscuration, illumination, anti-personnel, armored penetration, bunker penetration, and soft target engagement. This line also supports the development of training aids and materials to include reduced impacts of blast overpressure and impulse noise on the Fleet Marine Force (FMF).
- Support
- Test and Evaluation
- Management Services
Family of Expeditionary Fuel Systems (FEFS) — one RDT&E project inside PE 0603635M. Congressional marks are recorded on the program element, not on a project.
Project 3835 — Family of Expeditionary Fuel Systems (FEFS) — requests $0.0M in FY2027, 0.0% of the $522.0M requested for program element 0603635M.
Project 3835 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 5.9 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
What project 3835 buys
Family of Expeditionary Fuel Systems (FEFS) is a line that contains highly versatile fuel systems in support of Fleet Marine Force (FMF) operations. The family contains individual Table of Allowance Material Control Numbers which support FMF and Marine Air-Ground Task Force (MAGTF) operations and future operating concepts by providing all aspects of land and littoral-based fuel support to include receiving, test, additization, storage, sensors and metering, transfer and dispensing of fuel.
- Product Development