RDT&E Program Element · President's Budget PB2027

(u)surface Support

PE 0204228N·U.S. Navy·Approp. 1319 — RDT&E·BA7 — Operational System Development
FY2027 Request
$0.0M
Navy · RDT&E
HitchAI read

U.S. Navy requests $0.0M in FY2027.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$8.4M
Prior year

For fiscal year 2027, the U.S. Navy is requesting $0.0M for (u)surface Support under RDT&E program element 0204228N, against nothing enacted in FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

08.4FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual8.4
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0204228N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.

Project 3311

Navigation Systems

$0.0MFY2027 request
FY2025 actual$8.4M
FY2026 enacted$0.0M
FY2027 request$0.0M
Product DevelopmentSupport

Effective in FY 2026, Project 3311 Navigation Systems moved from PE 0204228N to PE 0607658N as part of the PE/BLI consolidation effort in the DoW Implementation Plan from the Commission on PPBE Reform Final Report. The Surface Support RDT&E funding will be used for the research, design, development, integration testing, and documentation of the Inertial Navigation System (INS) AN/WSN-12 for all Navy ships and submarines. The INS provides mission critical ship position and attitude data to shipboard sensors (such as radars), combat and weapon systems. The INS uses data from the Global Positioning System (GPS) to periodically update (i.e., reset) its position and internal clock. The INS is the ship's primary position source in the absence of GPS, and it consists of an Inertial Sensor Module (ISM) and a Navigation Processing Module (NPM) that will provide a significant improvement with respect to attitude and velocity data over previous INS. RDT&E funding will support continued system design to create a baseline for Pre-Production Units (PPU), Low Rate Initial Production (LRIP), and Full Rate Production (FRP). Military GPS User Equipment (MGUE) will provide assured Positioning, Navigation, and Timing (PNT) in a GPS degraded environment. Funding will be used for the development of interface and performance requirements, shipboard system architecture definition, and MGUE integration. Submarine Speed Sensors will provide investigation, development, testing and integration of new Own-Ship Speed sensors to address new capabilities, reduce detection, and improve reliability. Automated Celestial Navigation System (ACNS) funding will be used for the research, development, Engineering Development Model (EDM), documentation and integration testing of the celestial navigation solution for the NoGAPSS navigation implementation on the fleet. Efforts will leverage ONR celestial navigation research into a reproducible ruggedized system fully integrated into the navigation suite.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
AN/WSN-12 Inertial Navigation System - Replacement (INS-R)
FY2025 actual$4.2M
FY2026 enacted$0.0M
FY2027 request$0.0M

FY2026 plans — current year Effective FY 2026, Project 3311 Navigation Systems moved from PE 0204228N to PE 0607658N effective FY26 as part of the PE/BLI consolidation effort in the DoW Implementation Plan from the Commission on PPBE Reform Final Report.

Submarine Speed Sensors (SSS)
FY2025 actual$2.0M
FY2026 enacted$0.0M
FY2027 request$0.0M

FY2026 plans — current year Effective FY 2026, Project 3311 Navigation Systems moved from PE 0204228N to PE 0607658N effective FY26 as part of the PE/BLI consolidation effort in the DoW Implementation Plan from the Commission on PPBE Reform Final Report.

Automated Celestial Navigation System (ACNS)
FY2025 actual$1.0M
FY2026 enacted$0.0M
FY2027 request$0.0M
Navigation Support
FY2025 actual$1.2M
FY2026 enacted$0.0M
FY2027 request$0.0M

FY2026 plans — current year Effective FY 2026, Project 3311 Navigation Systems moved from PE 0204228N to PE 0607658N effective FY 2026 as part of the PE/BLI consolidation effort in the DoW Implementation Plan from the Commission on PPBE Reform Final Report.

Program detail

Mission & acquisition strategy

Effective in FY 2026, Project 3311 Navigation Systems moved from PE 0204228N to PE 0607658N as part of the PE/BLI consolidation effort in the DoW Implementation Plan from the Commission on PPBE Reform Final Report. Through FY 2025, the focus of PE 0204228N (Surface Support) is for the research, design, development, integration testing, and documentation of the Inertial Navigation System (INS) AN/WSN-12 for all Navy ships and submarines. The INS provides mission critical ship position and attitude data to shipboard sensors (such as radars), combat and weapon systems.

AN/WSN-12 Inertial Sensor Module (ISM) sole source production contract awarded in FY 2023. ACNS top-side sensor sole source production contract awarded in FY 2023

Project 3311 — Navigation Systems
  • Product Development
  • Support
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0204228N (President's Budget PB2027).
Suggested citation
HitchAI, "(u)surface Support (PE 0204228N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0204228N
Machine access
Markdown twin /programs/0204228N.md · MCP mcp.hitchintel.combudget_get_program_element