Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $80.5M for Anti-radiation Missile Improvement under RDT&E program element 0205601N, up 139% over FY2026. In the FY2027 defense authorization, House moved to cut it to $72.4M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 21.9 |
| FY2026 | Enacted | 33.7 |
| FY2027 | Request | 80.5 |
| FY2028 | Outyear | 45.6 |
| FY2029 | Outyear | 32.7 |
| FY2030 | Outyear | 19.3 |
| FY2031 | Outyear | 19.7 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
3 projects roll up into PE 0205601N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 139% overall, which can hide much larger swings below.
ARM Improvement
AARGM
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 91% | 73.5 |
| Government labs & warfare centers | 0.8% | 0.6 |
| Other / unspecified | 7.9% | 6.4 |
| FY2027 request | 100% | 80.5 |
Mission & acquisition strategy
Anti-Radiation Missile (ARM) Improvement is a combination of the Navy-led High Speed Anti-Radiation Missile (HARM) program, the Advanced Anti-Radiation Guide Missile (AARGM) program and the Advanced Anti-Radiation Guided Missile Extended Range (AARGM-ER). HARM is a Navy led joint service program with the United States Air Force. AARGM is a program derived from a Small Business Innovative Research (SBIR) program that developed a dual mode guidance section, incorporating Millimeter Wave (MMW) radar with an advanced anti-radiation homing seeker.
The AARGM program started as a Phase I Small Business Innovative Research (SBIR) Advanced Technology Program and evolved into a Phase III SBIR program that transitioned into a System Development and Demonstration (SD&D) Acquisition Category 1C program in 3Q FY 2003. The AARGM SD&D met most U.S. Navy operational requirements. AARGM Block 1 fulfills the rest of the operational requirements. Block 1 Fleet Release was approved in 4Q FY 2017. The AARGM program added GPS M-code in FY 2018 - FY 2021. For FY 2022 and out, the program will continue follow-on development efforts, ELINT file upgrades, and obsolescence mitigation for the AARGM missile. Next Generation Naval Mission Planning System integration started in FY 2025.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Northrop Grumman has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0205601N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksAARGM ER — one RDT&E project inside PE 0205601N. Congressional marks are recorded on the program element, not on a project.
Project 2189 — AARGM ER — requests $72.0M in FY2027, 89% of the $80.5M requested for program element 0205601N. Year over year it grows 180% against FY2026.
Project 2189 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 16.7 |
| FY2026 | Enacted | 25.7 |
| FY2027 | Request | 72.0 |
| FY2028 | Outyear | 36.6 |
| FY2029 | Outyear | 24.1 |
| FY2030 | Outyear | 11.0 |
| FY2031 | Outyear | 11.2 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
FY 2027 activities include continuation of EMD efforts (completion of the integration and test of the M-Code/Guidance Processor redesign; addition of two GP Redesign Software DT/IT Live Fire Flight Test Events; additional procurement of test assets; F-35 UAI development effort; F-35 integration effort; NOMS integration; initial Stations…
Read the FY2027 plan →FY 2027 activities will include continuation of the integration, including modeling and test, of the AARGM-ER component into the Next Generation Naval Mission Planning System.
FY 2027 activities will include continuation of the Virtual Stores capability development after aircraft software integration testing has finalized and technical training manuals have been updated. Planning efforts for test in FY28 will also be required.
Classified - Details held at a higher classification.
Named performers on project 2189
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2189 buys
The Air-to-Ground (AGM)-88G AARGM-ER Upgrade was a new start in FY 2016. The purpose of this effort is to develop hardware and software modifications to improve the Advanced Anti-Radiation Guided Missile (AARGM)'s operational capabilities, including extended range, survivability and effectiveness against complex, new, and emerging threats. This budget line item funds a new rocket motor design, system development and integration, test asset procurement, testing, correction of deficiencies, and associated software updates for the AARGM-ER to ensure these capabilities perform in accordance with established requirements. AARGM-ER retains the same guidance and sensor capabilities of the AARGM. The AARGM-ER program is part of the Navy's approach to address advanced threat capabilities in the Anti-Access/Area-Denial (A2/AD) environment. Solutions enable individual system capabilities to be leveraged across an effects chain, placing the full spectrum of tactical capability in the hands of the warfighter. Solutions that push engagement distances beyond the launch platform's radar horizon and allows the U.S. Navy to operate in, and control, contested battle space in littoral waters and A2/AD environments are increasingly critical as more scenarios require compressed and coordinated fire control timelines.
- Product Development
- Support
- Test and Evaluation
- Management Services
ARM Improvement — one RDT&E project inside PE 0205601N. Congressional marks are recorded on the program element, not on a project.
Project 1780 — ARM Improvement — requests $7.6M in FY2027, 9.4% of the $80.5M requested for program element 0205601N. Year over year it grows 7.8% against FY2026.
Project 1780 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 4.2 |
| FY2026 | Enacted | 7.0 |
| FY2027 | Request | 7.6 |
| FY2028 | Outyear | 8.1 |
| FY2029 | Outyear | 7.7 |
| FY2030 | Outyear | 7.4 |
| FY2031 | Outyear | 7.6 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FMA will continue to maximize AGM-88 ARM weapon effectiveness against threat air defense systems through laboratory, ground-based, captive and live-fire flight test events, data analysis, and systems engineering to improve weapon employment lethality. FMA testing via laboratory, ground and flight events will evaluate AARGM and AARGM-ER digital Anti-Radiation Homing (ARH) seeker and Millimeter Wave (MMW) terminal seeker capabilities against threat systems to evaluate lethality improvement options. FMA assessments will remain focused on emerging modern complex threat systems as well as theater/country-specific systems of interest. Expect continued testing and evaluation on advanced…
FY2026 to FY2027 change FY 2026 to FY 2027 increase is due to algorithm development necessary to support new AARGM-ER configuration evaluations against evolving threat systems, increased laboratory, ground and flight testing that will leverage previous investments in ARM laboratory capabilities. MMW library development will also need additional resources to improve fleet lethality.
FY2026 plans — current year FMA will continue to maximize AGM-88 ARM weapon effectiveness against threat air defense systems through laboratory, ground-based, captive and live-fire flight test events, data analysis, and systems engineering to improve weapon employment lethality. FMA testing via laboratory, ground and flight events will evaluate AARGM and AARGM-ER digital Anti-Radiation Homing (ARH) seeker and Millimeter Wave (MMW) terminal seeker capabilities against threat systems to evaluate lethality improvement options. FMA assessments will remain focused on emerging modern complex threat systems as well as theater/country-specific systems of interest. Expect continued testing and evaluation on advanced…
Named performers on project 1780
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 1780 buys
Anti-Radiation Missile (ARM) Improvement is a combination of the Navy-led High Speed Anti-Radiation Missile (HARM) program, the Advanced Anti-Radiation Guide Missile (AARGM) program and the Advanced Anti-Radiation Guided Missile Extended Range (AARGM-ER). HARM is a Navy led joint service program with the United States Air Force. AARGM is a program derived from a Small Business Innovative Research (SBIR) program that developed a dual mode guidance section, incorporating Millimeter Wave (MMW) radar with an advanced anti-radiation homing seeker. Additional AARGM capabilities include Global Positioning System (GPS) enabled point-to-point weapon engagement and missile impact avoidance/missile impact zones, MMW terminal guidance, and a Weapon Impact Assessment (WIA) transmitter to provide Battle Damage Assessment (BDA) cueing. AARGM-ER is a derivative of the AARGM program that repackages the seeker electronics and all of weapon engagement capabilities from AARGM into a new missile shape with a new rocket motor to achieve greater speed, range and survivability. AGM-88 ARM weapon systems require periodic updates to the user database to remain relevant based on changing threat parameters, enhanced air defense engagement tactics and modern complex emerging systems. These funds provide the means to conduct ground and flight testing against actual and surrogate threat systems. Procurement deliverables include anechoic chamber and open-air range test equipment, test missile assets, as well as surrogate threat system radar shapes and surrogate complex emitter systems. Foreign Material Assessment (FMA) evaluates AGM-88 ARM performance against threat systems to develop alternative Concept of Operations (CONOPs) against emerging threat capabilities. FMA testing also includes assessment of special project efforts to support advanced kill-chain capability development against threat systems. FMA deliverables include, but not limited to, analytical reports on findings, critical updates to fleet tactics manuals, curriculum changes to the Suppression of Enemy Air Defenses / Destruction of Enemy Air Defenses lead Air Combat Training Curriculum course work and weapon school tactics/training and procedure briefs.
- Product Development
- Test and Evaluation
- Management Services
AARGM — one RDT&E project inside PE 0205601N. Congressional marks are recorded on the program element, not on a project.
Project 2185 — AARGM — requests $0.9M in FY2027, 1.1% of the $80.5M requested for program element 0205601N. Year over year it falls 4.9% against FY2026.
Project 2185 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 1.0 |
| FY2026 | Enacted | 1.0 |
| FY2027 | Request | 0.9 |
| FY2028 | Outyear | 0.9 |
| FY2029 | Outyear | 0.9 |
| FY2030 | Outyear | 1.0 |
| FY2031 | Outyear | 1.0 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FY 2027 activities include the continuation of AARGM ELINT file upgrades to enhance system capability and adaptability to evolving threat environments. These efforts are supported by program management and engineering support to ensure effective planning, execution and technical oversight. Additionally, ground and flight test verification will be conducted to validate performance, ensure reliability and maintain mission readiness in response to emerging operational challenges.
FY2026 to FY2027 change FY 2026 to FY 2027 increased due to inflation.
FY2026 plans — current year FY 2026 activities include continuation of AARGM ELINT file upgrades as well as ground and flight test verification.
FY2027 planned work FY 2027 activities will include software correction of deficiencies identified through Fleet engagements and from obsolescence mitigation efforts.
FY2026 to FY2027 change FY 2026 to FY 2027 decreased due to fewer planned correction of deficiencies in FY 2027.
FY2026 plans — current year FY 2026 activities will include software correction of deficiencies identified through fleet engagements and from obsolescence mitigation efforts.
FY2027 planned work FY 2027 activities include the continuation of mission planning software/architecture development of the AARGM weapon component for integration into the Next Generation Naval Mission Planning System.
FY2026 to FY2027 change FY 2026 to FY 2027 decreased due to transition to the next stage of development programming and maturation. Additional programming integration work will continue in the FYDP.
FY2026 plans — current year FY 2026 activities include the continuation of mission planning software/architecture development of the AARGM weapon component for integration into the Next Generation Naval Mission Planning System.
Named performers on project 2185
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2185 buys
Advanced Anti-Radiation Guided Missile (AARGM) transitioned a Phase III Small Business Innovation Research (SBIR) program to develop and demonstrate a multi-mode guidance section on a High-Speed Anti-Radiation Missile (HARM) airframe to System Development and Demonstration (SD&D) in FY 2003. The AARGM SD&D program was designed to integrate multi-mode guidance (passive Anti-Radiation Homing (ARH)/active Millimeter Wave (MMW) Radar/Global Positioning System (GPS)/Inertial Navigation System) on the HARM Air-to-Ground Missile (AGM)-88. Planned AARGM weapon system capabilities include: active MMW terminal guidance to counter shutdown, expanded threat coverage, enhanced ARH, Weapon Impact Assessment (WIA) transmitted prior to detonation, GPS/point-to-point weapon navigation, enhanced navigational performance in denied environments and weapon employment with impact avoidance zone/missile impact zones. Milestone C was achieved 4Q FY 2008, followed by a combined FY 2008/FY 2009 Low-Rate Initial Production (LRIP) contract award in 1Q FY 2009. Full-Rate Production (FRP) decision was received 4Q FY 2012, with FRP deliveries beginning in 2Q FY 2014. The AARGM Block 1 Upgrade program began in FY 2012 for a software only upgrade with follow-on Operational Test and Evaluation/Integrated Test (FOT&E/IT) of the Block 1 Upgrade completed Q4 FY 2017. FY 2027 funding continues to support AARGM ELINT file upgrades, lab ground and flight tests, continuation of AARGM integration into the new mission planning tool, and technology infusion for obsolescence mitigations.
- Product Development
- Support
- Test and Evaluation
- Management Services