R-2A Activity · President's Budget PB2027

Software Pathway for Enabling Expedited Deliveries (SPEED)

Activity a11·Project 674785 — F-22·PE 0207138F·U.S. Air Force
FY2027 Request
$243.9M
▲ 18% vs FY2026
HitchAI read

This activity requests $243.9M in FY2027, 26% of project 674785, up 18% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$243.9M
▲ 18% vs FY2026
FY2026 Enacted
$206.1M
▲ 2277% vs FY2025
FY2025 Actual
$8.7M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 674785 of PE 0207138F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

FY2027 efforts will continue the ongoing development and integration of F-22 capabilities and continue EMD program activities for HMDCS and Link-16. These efforts will include, but are not limited to, the initiation of software development, enhancements, firmware upgrades, integration, test, and incremental upgrade activities with 2-way communication for system cueing. The Raptor Release 5 Production Build 002 Fielding Decision Review is scheduled for May 2027, with Time Compliance Technical Order in June 2027. Work will also be done to initiate contracting actions and begin procurement of HMDCS EMD kits and complete HMDCS's ejection safety qualification effort on the Holloman AFB High Speed Test Track. Link-16 will continue development and integration of multiple Open System Architecture (OSA) infrastructure enhancements, begin test of OSA networking firmware upgrade, and continue existing defect corrections and future capability development in support of Multifunction Information Distribution System Joint Tactical Radio System (MIDS JTRS).

FY2026 to FY2027 change

Increase of $37.753 million from FY2026 to FY2027 reflects a new transformation Contract Line Item Number (CLIN) on Agile Releases for Test, Execution, Modernization, Integration, and Sustainment (ARTEMIS) II software Operational Flight Program (OFP) contract to improve the OFP pipeline, as well as a ramp up in software integration capacity.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

FY2026 plans include the fielding of Raptor Release 5, the SPEED Minimum Viable Content Release, as well as HMDCS Engineering and Manufacturing Development (EMD) program activities including the initiation of software development, enhancements, firmware upgrades, integration, test, and incremental upgrade activities with work on 2-way communication for system cueing. Begin contracting actions and procurement of HMDCS EMD kits. Begin ejection safety qualification effort at the Holloman AFB High Speed Test Track for HMDCS. Plans also include Link 16 continued development, integration, and test for Classified Capability 1, initiate development and integration of an Open System Architecture (OSA) infrastructure enhancement to provide flexibility in design of future hardware and software. Continue existing defect corrections and future capabilities development in support of Multifunction Information Distribution System Joint Tactical Radio System (MIDS JTRS). Funds may be used to support Collaborative Combat Aircraft (CCA) integration efforts.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

5010015020008.7FY25ACTUAL206.1FY26ENACTED243.9FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual8.7
FY2026Enacted206.1
FY2027Request243.9

This activity is 26% of project 674785's FY2027 request and 26% of PE 0207138F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

12 activities in project 674785

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Infrastructure$325.3M flat
Software Pathway for Enabling Expedited Deliveries (SPEED) — this activity$243.9M ▲ 18%
Viability$109.6M ▲ 96%Sensor Systems$106.7M ▲ 3%Cryptographic Modernization$49.0M ▲ 201%Hybrid Satellite Communication (SATCOM)$36.8M ▲ 139%Low Drag Tanks and Pylons (LDTP)$34.0M ▼ 38%Advanced Technology Development (ATD)$26.7M ▲ 26%
Mode 5 Identify Friend or Foe Challenge (IFFC)$9.2M ▼ 10%
Embedded GPS/Inertial Navigation System (INS) Modernization (EGI-M)$6.8M ▲ 153%
Controlled Reception Pattern Antenna (CRPA)/Anti-Jam Global Positioning System (GPS) Antenna$2.3M ▼ 32%
Link 16 (L16) and Open System Architecture (OSA) Increment II Improvements$0.0M
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 0207138F, project 674785 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.