R-2A Activity · President's Budget PB2027

Viability

Activity a8·Project 674785 — F-22·PE 0207138F·U.S. Air Force
FY2027 Request
$109.6M
▲ 96% vs FY2026
HitchAI read

This activity requests $109.6M in FY2027, 12% of project 674785, up 96% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$109.6M
▲ 96% vs FY2026
FY2026 Enacted
$55.9M
▼ 46% vs FY2025
FY2025 Actual
$104.1M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 674785 of PE 0207138F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continue IRDS group A and group B test asset development and operations. Continue IRDS engineering and design activities. Continue Geyser+'s EMD program activities. Geyser+'s EMD objectives during this period include supplier and integration hardware development, group A and B design completion, long-lead procurement of test hardware kits to support test fleet integration, and preparation for lab testing support increment 1 integration.

FY2026 to FY2027 change

Increase of $53.624 million from FY2026 to FY2027 reflects increased development and test hardware for Infrared Defensive System (IRDS) and Geyser+. Purchasing tier III lab assets to support Ogden Test Evaluation Labs, Avionics Integration Lab, Flying Test Bed, and additional test equipment required for airworthiness certification of the new Open Computer Environment (OCE) cards.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continued Infrared Defensive System (IRDS) group A and group B test asset purchases and development and operation testings. Continue engineering and design activities and software integration development. Continue risk reduction efforts for Geyser+ that were previously initiated in ATD. Geyser+'s EMD objectives during this period include qualification of supplier hardware and group A and B design completion. Procurement of long-lead test hardware kits to support test fleet integration and software design and testing to support increment 1 integration.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2550751000104.1FY25ACTUAL55.9FY26ENACTED109.6FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual104.1
FY2026Enacted55.9
FY2027Request109.6

This activity is 12% of project 674785's FY2027 request and 12% of PE 0207138F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

12 activities in project 674785

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Infrastructure$325.3M flatSoftware Pathway for Enabling Expedited Deliveries (SPEED)$243.9M ▲ 18%
Viability — this activity$109.6M ▲ 96%
Sensor Systems$106.7M ▲ 3%Cryptographic Modernization$49.0M ▲ 201%Hybrid Satellite Communication (SATCOM)$36.8M ▲ 139%Low Drag Tanks and Pylons (LDTP)$34.0M ▼ 38%Advanced Technology Development (ATD)$26.7M ▲ 26%
Mode 5 Identify Friend or Foe Challenge (IFFC)$9.2M ▼ 10%
Embedded GPS/Inertial Navigation System (INS) Modernization (EGI-M)$6.8M ▲ 153%
Controlled Reception Pattern Antenna (CRPA)/Anti-Jam Global Positioning System (GPS) Antenna$2.3M ▼ 32%
Link 16 (L16) and Open System Architecture (OSA) Increment II Improvements$0.0M