RDT&E Program Element · President's Budget PB2027

F-22

PE 0207138F·U.S. Air Force·Approp. 3600 — RDT&E·BA7 — Operational System Development
FY2027 Request
$950.4M
⚑ Contested — Senate cuts 10%
HitchAI read

U.S. Air Force funding ramps 17% to a $950.4M request in FY2027. In the FY2027 defense authorization, the House funded it in full; the Senate cut 10% (to $854.4M); House appropriators cut 3.8% (to $914.0M). Lockheed Martin leads the industry work.

FY2027 Request
$950.4M
▲ 17% vs FY2026
Senate mark
$854.4M
▼ $96.0M vs request
FY2026 Enacted
$814.0M
In law

For fiscal year 2027, the U.S. Air Force is requesting $950.4M for F-22 under RDT&E program element 0207138F, up 17% over FY2026. In the FY2027 defense authorization, Senate moved to cut it to $854.4M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2505007501,0000733.6FY25ACTUAL814.0FY26ENACTED950.4FY27REQUEST986.2FY28840.3FY29807.8FY30768.0FY31SENATE
Actual Enacted Request Outyear (FYDP) Senate mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual733.6
FY2026Enacted814.0
FY2027Request950.4
FY2028Outyear986.2
FY2029Outyear840.3
FY2030Outyear807.8
FY2031Outyear768.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0207138F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 17% overall, which can hide much larger swings below.

Project 674785

F-22

$950.4MFY2027 request ▲ 17%
FY2025 actual$733.6M
FY2026 enacted$814.0M
FY2027 request$950.4M
Product DevelopmentSupport

The F-22 Raptor is a multi-mission fighter aircraft that combines low observability, supercruise, maneuverability and integrated avionics providing air superiority to the Joint Force, access in highly contested environments, as well as homeland and cruise missile defense. To maintain operational relevance, the program continues planned, incremental modernization efforts that enhance both F-22 air superiority and strike capabilities. The F-22 modernization enterprise develops, tests, and fields hardware/software of the air vehicle, engine, Operational Flight Program (OFP), and training systems to improve F-22 weapons, communications, navigation, pilot- vehicle interface, and electronic warfare suite. Funds may be used to resolve emerging safety of flight and diminishing manufacturing sources issues, accommodate technology insertion and fulfill Federal Aviation Administration (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness. Program RDT&E funding may be utilized to implement innovation insertion, capability insertion, software increments, spiral upgrades, modular component swaps, and other insertions consistent with Modular Open System Architecture. Program RDT&E funding may be utilized to design, develop, integrate, and test weapon system and/or component level open architectures. Program RDT&E funding may be utilized to fund the concept refinement, design, development, integration, and testing of interdependent technologies and common architectures that underpin weapon system and portfolio-wide mission outcomes. In Oct 2025, the F-22 Software Pathway Acquisition Program was stood up. Programs that previously included OFP software requirements transitioned those requirements to the F-22 Software Pathway Program and major thrust Software Pathway for Enabling Expedited Deliveries (SPEED) beginning with FY2026 requirements. The total cost of the F-22 Sensor Enhancement Rapid Fielding (RF) Middle Tier of Acquisition (MTA) effort is $1,801.7 million, including RDT&E and procurement of prototype units. The F-22 Sensor Enhancement RF MTA program is fully funded across the Future Years Defense Program. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$233.0M
FY2026 enacted$324.1M
FY2027 request$325.3M

Provide support to the System Integration Laboratories (SILs) for faster testing and assessment of F-22 enhancements. Continue to update critical systems required to support new aircraft configurations and capabilities. Continue Lab test planning using agile methods for all F-22 Acquisition Categories (ACAT) programs. Continue to update…

Read the FY2027 plan →
FY2025 actual$41.4M
FY2026 enacted$21.2M
FY2027 request$26.7M

Complete development of high-bandwidth beyond-line-of-sight demonstration satellite communications capabilities. Continue annual, on-going, technology maturation, development and risk reduction projects in support of various F-22 development efforts.

Read the FY2027 plan →
FY2025 actual$129.5M
FY2026 enacted$103.6M
FY2027 request$106.7M

Continue Sensor DT/OT flight test. Receive remaining DT/OT test assets and support equipment for use during testing to inform maintenance planning and logistic support. DT/OT testing expected to complete and support a Release 6 fielding decision in 4QFY2027. Complete transition of remaining manufacturing activities from the EMD…

Read the FY2027 plan →
Controlled Reception Pattern Antenna (CRPA)/Anti-Jam Global Positioning System (GPS) Antenna▼ 32%
FY2025 actual$19.8M
FY2026 enacted$3.4M
FY2027 request$2.3M

FY2027 planned work Continue the development and procurement of integration hardware for Anti-Jam GPS solutions.

FY2026 to FY2027 change Decrease of $1.098 million from FY2026 to FY2027 is attributable to the program's reduction in Engineering and Manufacturing Development (EMD) activities in preparation for procurement efforts.

FY2026 plans — current year Hardware corrective action effort is being worked to mitigate service life issues with a projected completion date of July 2026. Complete corrective action and service life retest in 4QFY2026. Research, Test, and mature alternate GPS Anti-Jam solutions.

Embedded GPS/Inertial Navigation System (INS) Modernization (EGI-M)▲ 153%
FY2025 actual$2.9M
FY2026 enacted$2.7M
FY2027 request$6.8M

FY2027 planned work F-22 will begin heads up display/integrated control panel (HUD/ICP) Software Development, begin Aircraft Group A engineering for Developmental Test (DT) / Occupational Test (OT) aircraft, and begin integrating hardware into the FTB. Hardware integration Vehicle System Simulator (VSS) will complete prior to starting the Agile Integration Laboratory (AIL) and Ogden Test Enterprise (OTE) integration in FY2028.

FY2026 to FY2027 change Increase of $4.112 million from FY2026 to FY2027 is attributable to the ramp up of efforts in accordance with planned Engineering and Manufacturing Development (EMD) activities.

FY2026 plans — current year F-22 will begin aircraft and Flying Test Bed (FTB) Group A design efforts to support Embedded Global Positioning System (GPS)/Inertial Navigation System (INS) Modernization (EGI-M) integration. F-22 will start integrating EGI-M Engineering Development Models (EDM) into the Vehicle System Simulator (VSS).

Link 16 (L16) and Open System Architecture (OSA) Increment II Improvements
FY2025 actual$74.4M
FY2026 enacted$0.0M
FY2027 request$0.0M

FY2027 planned work FY2027 plans are documented in the F-22 SPEED major thrust.

FY2026 to FY2027 change Documented in the F-22 SPEED major thrust.

FY2026 plans — current year FY2026 plans are documented in the F-22 SPEED major thrust.

Mode 5 Identify Friend or Foe Challenge (IFFC)▼ 10%
FY2025 actual$45.1M
FY2026 enacted$10.3M
FY2027 request$9.2M

FY2027 planned work Continue Mode 5 IFFC flight testing activities in conjunction with Raptor OFP. Continue spectrum certification activities to obtain a Stage 4 (operational) RFA for Mode 5 IFF operations on CAF aircraft. Perform hardware support activities to include troubleshooting and defect resolution as needed in conjunction with Release 6 fielding.

FY2026 to FY2027 change Decrease of $1.011 million from FY2026 to FY2027 is due to decreased Engineering and Manufacturing Development (EMD) requirements in FY2027.

FY2026 plans — current year Finalize software development, integration, and lab testing of select Mode 5 classified enabler capabilities. Complete integration and validation activities of Mode 5 Identify Friend or Foe Challenge (IFFC) circuit cards and crypto cards hardware. Complete hardware modification and integration activities on test aircraft. Continue Mode 5 IFFC flight testing activities in conjunction with Raptor Operational Flight Program flight testing. Continue spectrum certification activities to obtain a Stage 4 (operational) Radio Frequency Authorization (RFA) for Mode 5 Identify Friend or Foe (IFF) operations on Combat Air Forces (CAF) aircraft.

FY2025 actual$74.7M
FY2026 enacted$55.0M
FY2027 request$34.0M

Continued deliveries of Tanks and Pylons test assets. Continue Weapon Separation and Jettison testing to support Developmental Test (DT) / Occupational Test (OT) efforts. Begin final certification efforts for flight testing. Continue full Pylon qualification efforts.

Read the FY2027 plan →
Viability▲ 96%
FY2025 actual$104.1M
FY2026 enacted$55.9M
FY2027 request$109.6M

Continue IRDS group A and group B test asset development and operations. Continue IRDS engineering and design activities. Continue Geyser+'s EMD program activities. Geyser+'s EMD objectives during this period include supplier and integration hardware development, group A and B design completion, long-lead procurement of test hardware…

Read the FY2027 plan →
FY2025 actual$0.0M
FY2026 enacted$16.3M
FY2027 request$49.0M

FY2027 efforts will include further development of hardware for the cryptographic modernization program. As the SATURN, TSVCIS, and ORA provisioning work continues to mature, module level testing for the hardware will begin. As the development of the KOV-28A crypto progresses, coordination with the NSA on cryptographic certification will…

Read the FY2027 plan →
FY2025 actual$0.0M
FY2026 enacted$15.4M
FY2027 request$36.8M

Continue design integration requirements and begin lab/developmental test activities.

Read the FY2027 plan →
FY2025 actual$8.7M
FY2026 enacted$206.1M
FY2027 request$243.9M

FY2027 efforts will continue the ongoing development and integration of F-22 capabilities and continue EMD program activities for HMDCS and Link-16. These efforts will include, but are not limited to, the initiation of software development, enhancements, firmware upgrades, integration, test, and incremental upgrade activities with 2-way…

Read the FY2027 plan →
Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$950.4M
House NDAA (HASC)HASC
$950.4M full · +$0
Senate NDAA (SASC)SASC
$854.4M −$96.0M · −10%
House Approps (HAC-D)HAC_D
$914.0M −$36.4M · −3.8%
▲ $96.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Lockheed Martin
$452.0M · 48%
Sensor Systems · CPFF
Where FY2027 funding flowsShare$M
Industry primes48%452.0
Other / unspecified52%498.4
FY2027 request100%950.4
See Lockheed Martin's full federal contract ledger members
Program detail

Mission & acquisition strategy

The F-22 Raptor is a multi-mission fighter aircraft that combines low observability, supercruise, maneuverability and integrated avionics providing air superiority to the Joint Force, access in highly contested environments, as well as homeland and cruise missile defense. To maintain operational relevance, the program continues planned, incremental modernization efforts that enhance both F-22 air superiority and strike capabilities.

The F-22 utilized Sec 804 Middle Tier of Acquisition (MTA) to rapidly develop and field advanced capability. Development efforts were conducted under a Rapid Prototyping MTA, which concluded at the end of FY2023 with the exception of the Sensor Enhancements program, which received a 10-month extension to enable the completion of a technical demonstration on the F-22. In 4QFY2024, the Sensor Enhancements program transitioned to a Rapid Fielding MTA authority (8 Aug 2024) and placed the initial Group B kit production order (29 Aug 2024). A second Group B kit production order was placed on 4 Apr 2025.

Project 674785 — F-22
  • Product Development
  • Support
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did Senate do to this request, and what is still unresolved?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0207138F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "F-22 (PE 0207138F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0207138F
Machine access
Markdown twin /programs/0207138F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks