Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Air Force is requesting $33.7M for Combat Air Intelligence System Activities under RDT&E program element 0207431F, down 5.5% from FY2026. In the FY2027 defense authorization, House approps moved to cut it to $26.1M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 25.0 |
| FY2026 | Enacted | 35.6 |
| FY2027 | Request | 33.7 |
| FY2028 | Outyear | 35.3 |
| FY2029 | Outyear | 36.3 |
| FY2030 | Outyear | 37.0 |
| FY2031 | Outyear | 37.8 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
2 projects roll up into PE 0207431F
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -5% overall, which can hide much larger swings below.
GEO Info & Serv Software
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 95% | 32.0 |
| Other / unspecified | 5.0% | 1.7 |
| FY2027 request | 100% | 33.7 |
Mission & acquisition strategy
Provides support to personnel utilizing Target Development, Planning, and Execution applications; Unit Level Intelligence; Tactical Intelligence Applications; shorten the kill chain through automation and direct support to national, combatant command, and Air Force intelligence missions. Funds enhanced dynamic F2T2EA sensor-to-shooter intel and advanced training on cloud-based apps to shorten LRKC with automated and AI-enabled Sensing Grid/targeting tools and applications. Analyzes, visualizes, and shares National, Tactical, and open source Intel to close the capability gap against adversary's truncated kill chains.
The acquisition strategy builds on agile software engineering methodologies and modernization of existing capabilities utilizing evolutionary acquisition. Using section 804, timelines are reduced by modularizing both software engineering solutions and the associated contracting and funding strategies. This enables dynamic resource allocation based on current warfighter needs. The desired end state is continuous delivery of Software. In Summer of FY20, the decision was made to transition from MTA, Sec 804 Rapid Prototyping/Fielding to the new NDAA FY20 - Software Acquisition Pathway, which is the preferred path for acquisition and development of software-intensive systems.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what ACC has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0207431F.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksTARGETING ENTERPRISE RESEARCH — one RDT&E project inside PE 0207431F. Congressional marks are recorded on the program element, not on a project.
Project 675307 — TARGETING ENTERPRISE RESEARCH — requests $32.8M in FY2027, 97% of the $33.7M requested for program element 0207431F. Year over year it falls 5.7% against FY2026.
Project 675307 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 24.2 |
| FY2026 | Enacted | 34.8 |
| FY2027 | Request | 32.8 |
| FY2028 | Outyear | 34.4 |
| FY2029 | Outyear | 35.4 |
| FY2030 | Outyear | 36.0 |
| FY2031 | Outyear | 36.8 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continued integration and development of JTTv6. In FY27 WARPATH development till move to the US Navy for continued development dedicated to Target List Management and Target Element Workflow capabilities.
Continue Kill Chain automation support to enhance F2T2EA S2S intelligence, integration with C3BM and DAF Battle Net along with training on applications to shorten and automate long range kill chains. Enhance F2T2EA S2S intelligence systems of record/programs of primacy focusing on data standardization, Object/Element normalization, and…
Read the FY2027 plan →Continue the phased modernization of JTT-CP capabilities within the Targeting & Geo-spatial (T&G) portfolio, expand developmental test automation, and migration to Continuous Integration/DevOps environment to support continuous delivery to the warfighter on all information networks.
There is no AF ISR DI (PE:0303010) funding in Fy26 and beyond. (0303010F was established in FY25)
Named performers on project 675307
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 675307 buys
Provides support to personnel utilizing Target Development, Planning, and Execution applications; Unit Level Intelligence; Tactical Intelligence Applications; shorten the kill chain through automation and direct support to national, combatant command, and Air Force intelligence missions. Funds enhanced dynamic F2T2EA sensor-to-shooter intel and advanced training on cloud-based apps to shorten LRKC with automated and AI-enabled Sensing Grid/targeting tools and applications. Analyzes, visualizes, and shares National, Tactical, and open source Intel to close the capability gap against adversary's truncated kill chains. JTIM provides funding for the development of Joint Targeting Toolbox-Capabilities Package (JTT-CP) and WARPATH tools. JTT is the current capability providing the joint targeting community Intermediate Target Development (ITD), Advanced Target Development (ATD), Target List Management (TLM), and Target Folder Development capabilities. It also supports premise installation on coalition networks and Foreign Military Sales (FMS). The JTT program provides the current (legacy) functions until the integrated JTIM capabilities are fielded. Target List Management and Enterprise Workflow were shifted from the JTT program to WARPATH to keep pace with the JTIM Integrated Master Schedule (IMS). Funding for WARPATH comes from the original JTT budget, which is managed at ACC. Full funding will allow both programs to field capabilities in FY25, then in FY26 they will merge into one enterprise program providing capabilities to the Joint Targeting Community. Conducts limited early R&D for tools and workflow, initial cloud and data structure architecture, initial implementation of Sensor-to-shooter concept to accelerate kill chain for at scale dynamic execution, TTP development for targeting in an agile combat environment in the "lead wing concept", and enhanced target mensuration development to improve speed and capacity for target location. Funds dynamic F2T2EA S2S intelligence and advanced training on cloud-based application to shorten LRKC with automated/AI-enabled sensing-grid and targeting/applications. Analyzes, visualizes, and shares national, tactical, and open source intelligence to close the capability gap against adversary's truncated kill-chains.
- Product Development
- Support
- Test and Evaluation
- Management Services
GEO Info & Serv Software — one RDT&E project inside PE 0207431F. Congressional marks are recorded on the program element, not on a project.
Project 675309 — GEO Info & Serv Software — requests $0.9M in FY2027, 2.6% of the $33.7M requested for program element 0207431F. Year over year it grows 2.7% against FY2026.
Project 675309 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.8 |
| FY2026 | Enacted | 0.9 |
| FY2027 | Request | 0.9 |
| FY2028 | Outyear | 0.9 |
| FY2029 | Outyear | 0.9 |
| FY2030 | Outyear | 1.0 |
| FY2031 | Outyear | 1.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Provide continuing support for software pathways to meet future and evolving IT and GEOINT standards and support.
FY2026 to FY2027 change Contractor rate adjustments and inflationary increase
FY2026 plans — current year Provide continuing support for software pathways to meet future and evolving IT and GEOINT standards and support.
Named performers on project 675309
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 675309 buys
Provides support to personnel using Geospatial resources utilized in Geospatial Intelligence (GEOINT) databasing applications, technology exploration and refresh initiatives, geospatial imagery data management and dissemination architecture, geospatial information and services modernization, and enablers for intel and targeting capabilities. Provides support to the MAJCOMs to ensure requisite and available target intelligence and GEOINT tools for information directly available to warfighters. The GEOINT information and service software program funds the Air Force Enhanced Geospatial Product Library (EGPL) which is currently fielded to all combatant command air components and subordinate units supporting global air operations. The EGPL provides digital GEOINT data to support mission planning, targeting & intelligence in support of mission objectives. The Enhanced Geospatial Product Library (EGPL) is world-wide distributed United States Air Force (USAF) repository for geospatial products from the National Geospatial Intelligence Agency (NGA) and other government sources. Its purpose is to provide the Geospatial Intelligence (GEOINT) information needed by the Air Force (AF) and other DoD command and control systems. EGPL is on premise, continuously updated, NGA Foundational GEOINT data seamlessly accessible via shared drive or browser. Funds enhanced dynamic F2T2EA S2S intel and advanced training on cloud-based apps to shorten LRKC with automated and AI-enabled Sensing Grid/targeting tools and applications. Analyzes, visualizes, and shares National, Tactical, and open source Intel to close the capability gap against adversary's truncated kill chains.
- Support