Geo Info & Serv Software Development
Non-Kinetic Countermeasure Support (NKCS) at NASIC enables the testing, prototyping, and development efforts for a DoD-wide federated data architecture and repository for the specific mission set identified in 2025 Classified CJB MIP Vol 5. The repository will include the tools to provide tailored analysis and visualization to meet the scientific and technical intelligence (S&TI) needs of the Acquisition Intelligence enterprise, DoD Intelligence Enterprise (DIE), and Title 10 operations. *The FY25 funds split between two organizations. NASIC's portion of the funding is described above and the other organization and the description of their funds are at a higher classification level. All funding was then programmed in error sending all funds starting in FY25 and through the FYDP to NASIC. Due to the classified nature of the incorrectly programmed funds sent to NASIC, justification was only provided for NASIC's portion of the funding leading to a cut of half of the FY25 programmed amount. The programming has been corrected across the FYDP. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.
FY2027 planned work Release of a Minimal Viable Product (MVP), including repository capabilities, design of federated architecture, and prototyping of repository capabilities. Future integration requirements, data/object standards, and classified information network changes will populate FY27+ requirement changes as development continues to Initial Operational Capability. (IOC)
FY2026 to FY2027 change Insights gained from evaluating current database capabilities in FY26 will inform the development and launch of a minimum viable product in FY27. The decrease correlates with the planned development of entering into a Minimum Viable Product (MVP) and then Initial Operational Capability. (IOC)
FY2026 plans — current year FY26 will finish FY25's evaluation of current database capabilities as necessary and then fund the development and release of a minimum viable product of repository capabilities, design of federated architecture, and prototyping of repository capabilities. N/A
FY2026 plans — current year FY26 funding was programmed out of this PE and to the correct classified PE location. This portion of the funding exceeds the classification of this system and will be provided on an appropriately classified system.