RDT&E Program Element · President's Budget PB2027

ISR Transport and Processing

PE 0305240F·U.S. Air Force·Approp. 3600 — RDT&E·BA7 — Operational System Development
FY2027 Request
$312.0M
⚑ Contested — House approps cuts 22%
HitchAI read

U.S. Air Force funding ramps 858% to a $312.0M request in FY2027 — the program's peak, before stepping down 88% across the five-year plan. In the FY2027 defense authorization, the House cut 11% (to $277.0M); the Senate funded it in full; House appropriators cut 22% (to $242.1M).

FY2027 Request
$312.0M
▲ 858% vs FY2026
House approps mark
$242.1M
▼ $69.9M vs request
FY2026 Enacted
$32.6M
In law

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Air Force is requesting $312.0M for ISR Transport and Processing under RDT&E program element 0305240F, up 858% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $242.1M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

100200300033.4FY25ACTUAL32.6FY26ENACTED312.0FY27REQUEST33.8FY2834.7FY2935.6FY3036.3FY31HOUSE APPROPS
Actual Enacted Request Outyear (FYDP) House approps mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual33.4
FY2026Enacted32.6
FY2027Request312.0
FY2028Outyear33.8
FY2029Outyear34.7
FY2030Outyear35.6
FY2031Outyear36.3
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0305240F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 858% overall, which can hide much larger swings below.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$312.0M
House NDAA (HASC)HASC
$277.0M −$35.0M · −11%
Senate NDAA (SASC)SASC
$312.0M full · +$0
House Approps (HAC-D)HAC_D
$242.1M −$69.9M · −22%
▲ $69.9M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Other / unspecified100%312.0
FY2027 request100%312.0
Program detail

Mission & acquisition strategy

Intelligence, Surveillance and Reconnaissance (ISR) Transport and Processing (ITP) is a DoD program for global ISR bi-directional data transport and processing. Detailed information remains classified and will be provided on a need-to-know basis. The ITP program provides global air and space Intelligence, Surveillance and Reconnaissance (ISR) data transport/relay, imagery processing, data conditioning, and AI/ML augmentation. It serves multiple national, theater, and tactical customers with processing and transport of raw/unexploited ISR data in support of operational and intelligence functions.

For imagery processing capabilities, the Air Force uses an incremental acquisition approach with development cycles and spirals to develop, field, and upgrade the system. Contracts are structured for full and open competition to the maximum extent possible. Additionally, strategic partnerships and agreements with National Laboratories and other agencies are utilized.

Project 675266, 675265, 674826 — ISR Transport
  • Product Development
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House approps do to this request, and what is still unresolved?Which project inside PE 0305240F is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0305240F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "ISR Transport and Processing (PE 0305240F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0305240F
Machine access
Markdown twin /programs/0305240F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$279.6M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

ISR Transport — one RDT&E project inside PE 0305240F. Congressional marks are recorded on the program element, not on a project.

Project 675266 — ISR Transport — requests $279.6M in FY2027, 90% of the $312.0M requested for program element 0305240F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 675266 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5010015020025000.0FY25ACTUAL0.0FY26ENACTED279.6FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request279.6
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

ISR TransportNEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$279.6M

RDT&E for Next Gen RF

Project 675266 — every activity in full →
Project detail

What project 675266 buys

The ISR Transport effort is an upgrade of the ITP global bi-directional system. Detailed information for this particular effort remains classified and will be provided on a need-to-know basis. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F

R-3 lines of work
  • Product Development
FY2027 Request
$28.7M
▲ 2.8% vs FY2026
FY2026 Enacted
$27.9M
▼ 2.2% vs FY2025
FY2025 Actual
$28.5M
Prior year

Common Imagery Processor (CIP) — one RDT&E project inside PE 0305240F. Congressional marks are recorded on the program element, not on a project.

Project 675265 — Common Imagery Processor (CIP) — requests $28.7M in FY2027, 9.2% of the $312.0M requested for program element 0305240F. Year over year it grows 2.8% against FY2026.

Funding trajectory

Project 675265 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25028.5FY25ACTUAL27.9FY26ENACTED28.7FY27REQUEST29.7FY2830.3FY2930.9FY3031.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual28.5
FY2026Enacted27.9
FY2027Request28.7
FY2028Outyear29.7
FY2029Outyear30.3
FY2030Outyear30.9
FY2031Outyear31.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$28.5M
FY2026 enacted$27.9M
FY2027 request$28.7M

- Will continue to upgrade VIP-C to enable better geo-coordinate accuracy, facilitate automated intelligence discovery, integrate new algorithms, and reduce processing latency. This includes developing and integrating ISR data into a Cloud storefront infrastructure enhancing user interface and facilitating accelerated system security…

Read the FY2027 plan →
Project 675265 — every activity in full →
Project detail

What project 675265 buys

The Imagery Processing effort develops the Virtual Imagery Processing Capability (VIP-C) within the Air Force ISR Transport and Processing (Formerly DCGS) architecture. Current efforts include further developing the virtual software capability to enhance processing performance while decreasing latency across the enterprise and testing, development, and demonstrations integrating updated and new/emerging air and space based sensors into the DAF Battle Network. In addition, the project involves improving the Machine Assisted Geospatial Intelligence (GEOINT) Exploitation (MAGE) capability to employ advanced technologies, automation, and augmentation at speed and scale to close the gap between image collection and actionable intelligence. Efforts within this PE align with USAF investment in the Advanced Battle Management System (ABMS) (0604003F), Tech Transition - Air (0604858F), and Air Force Distributed Common Ground System (AF DCGS) (0305208F) to deliver the Long-Range Fires architecture for the DAF BATTLE NETWORK. Program RDT&E funding may be utilized to implement innovation insertion, capability insertion, software increments, spiral upgrades, modular component swaps, and other insertions consistent with Modular Open System Architecture. Program RDT&E funding may be utilized to design, develop, integrate, and test weapon system and/or component level open architectures. Program RDT&E funding may be utilized to fund the concept refinement, design, development, integration, and testing of interdependent technologies and common architectures that underpin weapon system and portfolio-wide mission outcomes. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F

R-3 lines of work
  • Product Development
  • Support
  • Management Services
FY2027 Request
$3.7M
▼ 20% vs FY2026
FY2026 Enacted
$4.7M
▼ 4.8% vs FY2025
FY2025 Actual
$4.9M
Prior year

Common Imagery Ground / Surface Systems — one RDT&E project inside PE 0305240F. Congressional marks are recorded on the program element, not on a project.

Project 674826 — Common Imagery Ground / Surface Systems — requests $3.7M in FY2027, 1.2% of the $312.0M requested for program element 0305240F. Year over year it falls 20% against FY2026.

Funding trajectory

Project 674826 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.9FY25ACTUAL4.7FY26ENACTED3.7FY27REQUEST4.1FY284.4FY294.7FY304.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.9
FY2026Enacted4.7
FY2027Request3.7
FY2028Outyear4.1
FY2029Outyear4.4
FY2030Outyear4.7
FY2031Outyear4.8
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Enterprise Interoperability▼ 20%
FY2025 actual$4.9M
FY2026 enacted$4.7M
FY2027 request$3.7M

FY2027 planned work - Will continue to support OUSD(I&S), C3BM, and AF DCGS Interoperability Enterprise efforts. - Will continue integrating new and emerging air and space-based sensors by incorporating sensor data into the VIP-C processing and supporting communications architecture in support of joint operations.

FY2026 to FY2027 change Funding decrease due to FFRDC and Service Contract Reductions.

FY2026 plans — current year - Continue to support OUSD(I&S), C3BM, and AF DCGS Interoperability Enterprise efforts. - Continue integrating new and emerging air and space-based sensors by incorporating sensor data into the VIP-C processing and supporting communications architecture in support of joint operations.

Project detail

What project 674826 buys

This project funds the Common Imagery Ground / Surface Systems enterprise support capabilities. This includes support to OUSD(I&S), C3BM, and AF DCGS interoperability efforts. This includes integration with new and emerging air and space-based sensors. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F Efforts within this PE align with USAF investment in the Advanced Battle Management System (ABMS) (0604003F), Tech Transition - Air (0604858F), and Air Force Distributed Common Ground System (AF DCGS) (0305208F) to deliver the Long-Range Fires architecture for the DAF BATTLE NETWORK.

R-3 lines of work
  • Support