RDT&E Program Element · President's Budget PB2027

Aviation Survivability

PE 0603216N·U.S. Navy·Approp. 1319 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$20.0M
Navy · RDT&E
HitchAI read

U.S. Navy funding falls 17% to a $20.0M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. NAWCAD leads the industry work.

FY2027 Request
$20.0M
▼ 17% vs FY2026
FY2026 Enacted
$24.1M
▲ 5.2% vs FY2025
FY2025 Actual
$22.9M
Prior year

Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $20.0M for Aviation Survivability under RDT&E program element 0603216N, down 17% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

022.9FY25ACTUAL24.1FY26ENACTED20.0FY27REQUEST18.2FY2818.4FY2918.3FY3018.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual22.9
FY2026Enacted24.1
FY2027Request20.0
FY2028Outyear18.2
FY2029Outyear18.4
FY2030Outyear18.3
FY2031Outyear18.8
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

4 projects roll up into PE 0603216N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -17% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$20.0M
House NDAA (HASC)HASC
$20.0M full · +$0
Senate NDAA (SASC)SASC
$20.0M full · +$0
House Approps (HAC-D)HAC_D
$20.0M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

NAWCAD
$9.7M · 48%
Systems Engineering
NAWCWD
$5.3M · 26%
Systems Engineering
Where FY2027 funding flowsShare$M
Industry primes89%17.8
Government labs & warfare centers11%2.2
FY2027 request100%20.0
See NAWCAD's full federal contract ledger members
Program detail

Mission & acquisition strategy

Project 0584: Aircrew Protective Clothing & Devices (APCD) is an Advanced Component Development & Prototyping program that develops, matures, and tests advanced technologies that can lead to solutions that maximize aircrew Performance and Protection & Survivability. These efforts lower the technical/cost risks of integrating new technologies prior to formal acquisition program of record initiatives , enhance resulting investment benefits, and speed the delivery of capability to the Fleet.

A combination of WR, CPFF, and MIPR funding paths will be used as appropriate to support APCD efforts to develop, mature, test, and transition advanced technologies.

Project 0584, 0592, 0591, 1819 — Aircrew Protective Clothing & Devices
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0603216N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what NAWCAD has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603216N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Aviation Survivability (PE 0603216N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603216N
Machine access
Markdown twin /programs/0603216N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$11.3M
▼ 25% vs FY2026
FY2026 Enacted
$15.2M
▲ 12% vs FY2025
FY2025 Actual
$13.5M
Prior year

Aircrew Protective Clothing & Devices — one RDT&E project inside PE 0603216N. Congressional marks are recorded on the program element, not on a project.

Project 0584 — Aircrew Protective Clothing & Devices — requests $11.3M in FY2027, 57% of the $20.0M requested for program element 0603216N. Year over year it falls 25% against FY2026.

Funding trajectory

Project 0584 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

013.5FY25ACTUAL15.2FY26ENACTED11.3FY27REQUEST9.3FY289.4FY299.1FY309.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual13.5
FY2026Enacted15.2
FY2027Request11.3
FY2028Outyear9.3
FY2029Outyear9.4
FY2030Outyear9.1
FY2031Outyear9.4
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Advanced Technology Crew Station▼ 100%
FY2025 actual$13.5M
FY2026 enacted$15.2M
FY2027 request$0.0M

Baseline capability of I-Predict (Incapacitation Prediction for Readiness in Expeditionary Domains) transitions from ONR/FNC performers to Human Systems Engineering Department (HSED). First use cases will complete verification and validation of modeling capability. Biofidelic models will aid with design, development, and testing of…

Aircrew PerformanceNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$3.5M

Continue to explore, test, and develop design concepts of effective human-machine interfaces for crewed, uncrewed human/autonomy teaming. Mature brain-computer/brain-machine interface technology and biocybernetic system capability. Continue to advance operator state monitoring to detect physiological and cognitive degradation…

Aircrew Protection & SurvivabilityNEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$7.8M

Continue evaluation and refinement of Human Body Models (HBM) for acute and chronic musculoskeletal disorder (MSD) mitigation. Transition from non-biofidelic Anthropomorphic Test Devices (ATDs) to biofidelic digital twins. Fully incorporate USN/USMC Anthropometry study results. Continue maturation and qualification of clear Laser Eye…

Project 0584 — every activity in full →
Who's building it

Named performers on project 0584

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWCAD
$8.8M · 78%
NAMRUD
$2.0M · 18%
USAMRAA
$0.5M · 4.4%
Project detail

What project 0584 buys

Project 0584: Aircrew Protective Clothing & Devices (APCD) is an Advanced Component Development & Prototyping program that develops, matures, and tests advanced technologies that can lead to solutions that maximize aircrew Performance and Protection & Survivability. These efforts lower the technical/cost risks of integrating new technologies prior to formal acquisition program of record initiatives , enhance resulting investment benefits, and speed the delivery of capability to the Fleet. APCD Budget Activity (BA) 4 development, maturation, and integration work is necessary to transition BA 1-3 DoD, external partner, industry, and academia research, technologies, and future naval concept initiatives to BA 5+ operational assessment, integration, testing, evaluation and certification work. APCD funds are also used to establish and maintain critical subject matter expertise, tools, models, and laboratory capabilities that enable objective analysis, assessment, verification and validation of Aircrew Systems solution candidates, ensuring requisite Human and Technology Readiness Levels are achieved. Core activities align across two primary focus areas: Aircrew Performance and Aircrew Protection & Survivability. Aircrew Performance-aligned projects develop state-of-the-art, integrated technologies that improve readiness; mitigate the effects of exposure to environmental stressors; provide advanced sensor data on warfighter physiological and cognitive state; and optimize warfighter physical, physiological, and cognitive performance, effectiveness, and safety. Aircrew Protection & Survivability-aligned projects optimize aircrew protection and survivability across the entire anthropometric population by delivering state-of-the-art personal protective equipment (PPE), crash-worthy seating and harness/restraint systems, and survival systems designed, tested, and integrated to perform in the harshest environmental operating conditions during diverse mission scenarios.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$4.7M
▼ 2.1% vs FY2026
FY2026 Enacted
$4.8M
▼ 5.7% vs FY2025
FY2025 Actual
$5.1M
Prior year

Acft & Ordnance Safety — one RDT&E project inside PE 0603216N. Congressional marks are recorded on the program element, not on a project.

Project 0592 — Acft & Ordnance Safety — requests $4.7M in FY2027, 23% of the $20.0M requested for program element 0603216N. Year over year it falls 2.1% against FY2026.

Funding trajectory

Project 0592 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

05.1FY25ACTUAL4.8FY26ENACTED4.7FY27REQUEST4.8FY284.9FY295.0FY305.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual5.1
FY2026Enacted4.8
FY2027Request4.7
FY2028Outyear4.8
FY2029Outyear4.9
FY2030Outyear5.0
FY2031Outyear5.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Insensitive Munitions (IM)▼ 2%
FY2025 actual$5.1M
FY2026 enacted$4.8M
FY2027 request$4.7M

FY2027 planned work The FY27 IMTTP base plan focuses on advancing and transitioning technology that assure all munitions are as safe as practicable, updating currently fielded munitions and developing IM compliant solutions for future state-of-the art weapons required for relevant missions, mission gaps and operations of interest, as identified by OPNAV (N98). Technology Development programs (Critical Energetic Materials project, Minimum Smoke and High-Performance Propellant formulations project, and the Qualification and characterization of PBXC-144) take technologies that have demonstrated a potential military advantage, in the laboratories, and advances them from a general science demonstration to…

FY2026 to FY2027 change Decrease FY 2026 to FY 2027 to incorporate miscellaneous funding reductions supporting higher priorities.

FY2026 plans — current year The FY26 IMTTP base plan focuses on advancing and transitioning technology that assure all munitions are as safe as practicable, updating currently fielded munitions and developing IM compliant solutions for future state-of-the art weapons required for relevant missions, mission gaps and operations of interest, as identified by OPNAV (N98). Technology Development programs (Critical Energetic Materials program, Metal Matrix Composite Case Technologies Program, Minimum Smoke and High Performance Propellant formulations program, and the Qualification and characterization of PBXC-144) take technologies that have demonstrated a potential military advantage, in the laboratories, and advances them…

Who's building it

Named performers on project 0592

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWCWD
$4.7M · 100%
Project detail

What project 0592 buys

The Aircraft and Ordnance Safety Program transitions innovative munitions safety technology to Navy and Marine Corps air weapons, to comply with the Chief of Naval Operations direction that all munitions carried aboard Navy ships be insensitive to unplanned stimuli (thermal, impact, and shock events). The Aircraft and Ordnance Safety Program also ensures the safety and protection of personnel, aircraft, ships, and operational facilities, through improved precision targeting, fail-safe ordnance, selective effects munitions and shock/blast force protection technologies.

R-3 lines of work
  • Product Development
  • Management Services
FY2027 Request
$3.4M
▼ 3.3% vs FY2026
FY2026 Enacted
$3.5M
▼ 3.5% vs FY2025
FY2025 Actual
$3.6M
Prior year

Acft Survivability, Vulnerability & Safety — one RDT&E project inside PE 0603216N. Congressional marks are recorded on the program element, not on a project.

Project 0591 — Acft Survivability, Vulnerability & Safety — requests $3.4M in FY2027, 17% of the $20.0M requested for program element 0603216N. Year over year it falls 3.3% against FY2026.

Funding trajectory

Project 0591 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

03.6FY25ACTUAL3.5FY26ENACTED3.4FY27REQUEST3.5FY283.6FY293.6FY303.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual3.6
FY2026Enacted3.5
FY2027Request3.4
FY2028Outyear3.5
FY2029Outyear3.6
FY2030Outyear3.6
FY2031Outyear3.7
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Technology Requirementsflat
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$0.0M

FY2027 planned work Continue to update and expand threats assessments to include new and/or evolved threats. Update modeling and simulation capabilities to better reflect the evolving threat environment.

FY2026 plans — current year Continue to update and expand threats assessments to include new and/or evolved threats. Update modeling and simulation capabilities to better reflect the evolving threat environment.

Technology Design & Development▼ 3%
FY2025 actual$3.5M
FY2026 enacted$3.4M
FY2027 request$3.3M

FY2027 planned work This effort will expand upon the work done in FY26 to incorporate products from the Benchmark threat model library into existing high-fidelity Hardware-in-the-Loop capability to enable the assessment of EW concepts versus anticipated threat systems. The effort will ultimately enable improved Model Based Systems Engineering support for new weapon systems. This effort also includes experimentation into the feasibility of applying Machine Learning techniques to high fidelity modeling & simulation.

FY2026 to FY2027 change Decrease FY 2026 to FY 2027 to incorporate miscellaneous funding reductions supporting higher priorities.

FY2026 plans — current year This effort will expand upon the work done in FY25 to incorporate products from the Benchmark threat model library into existing high fidelity Hardware-in-the-Loop capability to enable the assessment of EW concepts versus anticipated threat systems still to be developed. These highly advanced algorithms form the basis for a threat radars receive chain, a critical component not found in existing open-loop stimulation systems and other modeling tools. The effort will ultimately enable a continuum that enables development of new systems from requirements definition, to development and continual assessments, which support the Model Based Systems Engineering approach.

Technology Test & Evaluationflat
FY2025 actual$0.1M
FY2026 enacted$0.1M
FY2027 request$0.1M

FY2027 planned work This effort will expand upon the work done in FY 2026 to prototype hardware testing in support of ASE architecture development and in support of countermeasures simulation hardware as modules are completed. Will test newly developed or modified modules to validate accuracy of representations of the EW and threat systems components.

FY2026 plans — current year Continue prototype hardware testing in support of ASE architecture development and in support of countermeasures simulation hardware as modules are completed. Test newly developed or modified modules to validate accuracy of representations of the EW and threat systems components.

Who's building it

Named performers on project 0591

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWCAD
$0.9M · 26%
SAIC
$0.2M · 5.3%
SURVICE
$0.1M · 2.9%
NAWCWD
$0.1M · 1.5%
Project detail

What project 0591 buys

Aircraft Survivability, Vulnerability and Safety. This project evaluates and develops prototype hardware and software solutions to improve the survivability of Navy and Marine Corps aircraft. This project addresses the likelihood of an aircraft being hit (susceptibility) and the probability of a kill if the aircraft is hit (vulnerability). Types of programs funded under this project include signature reduction efforts, subsystem and component hardening and development of integrated Aviation Survivability Equipment (iASE) architectures for simulation and training systems. This project also provides an engineering level modeling and simulation capability to assess electronic warfare capabilities and to support future electronic warfare investment strategies. Further, this effort expands upon existing high fidelity Hardware In The Loop (HITL) capability and this expanded capability will enable the assessment of Electronic Warfare (EW) concepts versus future (i.e. not fully defined) threat systems. This project will include the development of new or modification of existing modules which are high fidelity representations of the EW and threat system's components and will support iASE hardware and software research and future technological survivability concepts as they become available.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$0.6M
▼ 2.6% vs FY2026
FY2026 Enacted
$0.6M
▼ 1.6% vs FY2025
FY2025 Actual
$0.6M
Prior year

CV Acft Fire Suppress System — one RDT&E project inside PE 0603216N. Congressional marks are recorded on the program element, not on a project.

Project 1819 — CV Acft Fire Suppress System — requests $0.6M in FY2027, 3.0% of the $20.0M requested for program element 0603216N. Year over year it falls 2.6% against FY2026.

Funding trajectory

Project 1819 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.6FY25ACTUAL0.6FY26ENACTED0.6FY27REQUEST0.6FY280.6FY290.6FY300.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.6
FY2026Enacted0.6
FY2027Request0.6
FY2028Outyear0.6
FY2029Outyear0.6
FY2030Outyear0.6
FY2031Outyear0.7
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Fire-Fighting▼ 3%
FY2025 actual$0.6M
FY2026 enacted$0.6M
FY2027 request$0.6M

FY2027 planned work Continue support for Naval Air Training and Operating Procedures Standardization improvements for aircraft fire prediction and protection. Continue monitoring aqueous film forming foam developments and other clean agents. Continue to monitor and test new equipment improvements for saws, spreaders, and other improvements to reduce or discontinue the use of Motor Gasoline on ships. Continue evaluations for flash-hood, and firefighter personnel floatation device improvements. Continue the testing of radiant heat testing for proximity firefighting ensembles. Continue to monitor and recommend Electromagnetic Aircraft Launch Systems fire doctrine, Carrier Fixed Wing Aircraft Nuclear hangar bay…

FY2026 to FY2027 change Decrease FY 2026 to FY 2027 to incorporate miscellaneous funding reductions supporting higher priorities.

FY2026 plans — current year Continue support for Naval Air Training and Operating Procedures Standardization improvements for aircraft fire prediction and protection. Continue monitoring aqueous film forming foam developments and other clean agents. Continue to monitor and test new equipment improvements for saws, spreaders, and other improvements to reduce or discontinue the use of Motor Gasoline on ships. Continue evaluations for flash-hood, and firefighter personnel floatation device improvements. Continue the testing of radiant heat testing for proximity firefighting ensembles. Continue to monitor and recommend Electromagnetic Aircraft Launch Systems fire doctrine, Carrier Fixed Wing Aircraft Nuclear hangar bay…

Who's building it

Named performers on project 1819

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWCWD
$0.5M · 87%
Hughes Associates
$0.1M · 12%
NRL
$0.0M · 1.7%
Project detail

What project 1819 buys

This project develops improved fire-fighting systems and fire protective measures for aircraft-related fires on aircraft carriers, including assessment of fire properties, definition of fire threats, improvements to fire-fighting agents and delivery systems, fire detection and suppression system performance evaluations, and fire-fighter training improvements.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services