RDT&E Program Element · President's Budget PB2027

Air and Missile Defense Advanced Technology

PE 0603466A·U.S. Army·Approp. 2040 — RDT&E·BA3 — Advanced Technology Development
FY2027 Request
$63.9M
⚑ Contested — Senate adds 17%
HitchAI read

U.S. Army requests $63.9M in FY2027 — the program's peak, before stepping down 51% across the five-year plan. In the FY2027 defense authorization, the House added 23% (to $78.9M); the Senate added 17% (to $74.9M); House appropriators added 78% (to $113.9M).

FY2027 Request
$63.9M
▲ 8.2% vs FY2026
Senate mark
$74.9M
▼ $11.0M vs request
FY2026 Enacted
$59.1M
In law

Roll-up of 5 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $63.9M for Air and Missile Defense Advanced Technology under RDT&E program element 0603466A, up 8.2% over FY2026. In the FY2027 defense authorization, Senate moved to raise it to $74.9M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550060.5FY25ACTUAL59.1FY26ENACTED63.9FY27REQUEST46.7FY2828.2FY2932.3FY3031.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual60.5
FY2026Enacted59.1
FY2027Request63.9
FY2028Outyear46.7
FY2029Outyear28.2
FY2030Outyear32.3
FY2031Outyear31.3
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 3 — Advanced Technology Development.

Complete
Research
BA 1–2
Current
Advanced Technology
BA 3
Later
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

5 projects roll up into PE 0603466A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 8% overall, which can hide much larger swings below.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$63.9M
House NDAA (HASC)HASC
$78.9M +$15.0M · +23%
Senate NDAA (SASC)SASC
$74.9M +$11.0M · +17%
House Approps (HAC-D)HAC_D
$113.9M +$50.0M · +78%
▲ $39.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

This Program Element (PE) matures and demonstrates technology in support of Army Modernization Priority Air and Missile Defense by maturating, demonstrating and conducting system level experimentation for the development of advanced air defense technologies that reduce the cost curve of missile defense, restore overmatch, survive volley-fire attacks, and operate within sophisticated Anti-Access/Area Denial (A2/AD) and contested domains. Research in this PE complements PE 0602150A (Air and Missile Defense Technology). This PE is directly aligned to the Air & Missile Defense (AMD) Army Modernization Priority.

Project DB3, IB1, CV6, AE3, BN7 — Radar Survivability through Dis Sensing Adv Tech
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did Senate do to this request, and what is still unresolved?Which project inside PE 0603466A is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603466A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Air and Missile Defense Advanced Technology (PE 0603466A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603466A
Machine access
Markdown twin /programs/0603466A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$50.5M
▲ 2454% vs FY2026
FY2026 Enacted
$2.0M
▼ 69% vs FY2025
FY2025 Actual
$6.5M
Prior year

Radar Survivability through Dis Sensing Adv Tech — one RDT&E project inside PE 0603466A. Congressional marks are recorded on the program element, not on a project.

Project DB3 — Radar Survivability through Dis Sensing Adv Tech — requests $50.5M in FY2027, 79% of the $63.9M requested for program element 0603466A. Year over year it grows 2454% against FY2026.

Funding trajectory

Project DB3 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255006.5FY25ACTUAL2.0FY26ENACTED50.5FY27REQUEST37.5FY2813.8FY2917.4FY3016.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual6.5
FY2026Enacted2.0
FY2027Request50.5
FY2028Outyear37.5
FY2029Outyear13.8
FY2030Outyear17.4
FY2031Outyear16.4
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Radar Survivability through Dis Sensing (RSDS) Adv Tech
FY2025 actual$3.6M
FY2026 enacted
FY2027 request

Will conduct an initial modeling and simulation demonstration that will assess technologies developed under the communication among sensors (CAS) task to pass detection information between sensors; mature software technology for future multi-static demonstrations. Incorporate user feedback to ensure developed technology is interoperable…

Augmented Intelligence for Mission Planning and Control▼ 14%
FY2025 actual$2.9M
FY2026 enacted$2.0M
FY2027 request$1.7M

Will mature and optimize selected decision aids; mature mission testbed proof of concept (POC) prototype for upcoming demonstrations; validate decision aids with subject matter expert planning demonstrations; mature development of a POC planning software interface and modeling and simulation including AI/ML enabled algorithms for…

FY2025 actual
FY2026 enacted
FY2027 request$48.8M

Will mature concepts, designs and development of radar sensor technologies to enable multi-mission capability that addresses advanced and emerging threats; establish an integration team to mature, optimize and validate system performance to reduce cost and technical risk using modeling and simulation, virtual test beds, as well as…

Read the FY2027 plan →
Project DB3 — every activity in full →
Project detail

What project DB3 buys

This project matures and demonstrates distributed and collaborative engagement decision making for Multi-Domain Operations. The Augmented Intelligence for Mission Planning and Control effort will develop and mature Artificial Intelligence (AI) Decision Aids enabling operators to continuously manage IAMD component deployments and to select best engagement options in support of Multi-Domain Operations (MDO). This project matures next generation multi-mission radar capabilities through concepts, designs, digital prototypes, and demonstrators that will enable the convergence of both offensive and defensive fires missions by capitalizing on technologies that enable multi-mode sensor architectures to address identified military needs for a common fires radar to reduce cost and logistical burden. Work in this Project complements Program Element (PE) 0602141A (Lethality Technology) / Project CG4 (Advanced Radar Concepts and Technologies) and Project CJ7 (Future Air Defense Missile Enabling Tech; PE 0602148A (Future Vertical Lift Technology) / Project CC3 (FVL Radar Technologies); PE 0601102A (Defense Research Sciences) / Project AA8 (Sensing and Electromagnetics) and PE 0602150A (Air and Missile Defense Technology) / Project DA9 (Radar Survivability through Dis Sensing Tech); and PE 0602275A (Electronic Warfare Applied Research)/ Project A70 (Sensor Electronic Support Tech); and PE 0603275A (Electronic Warfare Advanced Technology) / Project A78 (Sensor Electronic Support Adv Tech) Work is this project is performed by the Aviation & Missile Center (AvMC) and the Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance and Reconnaissance (C5ISR) Center.

FY2027 Request
$7.6M
▲ 68% vs FY2026
FY2026 Enacted
$4.5M
▼ 16% vs FY2025
FY2025 Actual
$5.4M
Prior year

Integrated Beam Control Systems Demo for C-CM — one RDT&E project inside PE 0603466A. Congressional marks are recorded on the program element, not on a project.

Project IB1 — Integrated Beam Control Systems Demo for C-CM — requests $7.6M in FY2027, 12% of the $63.9M requested for program element 0603466A. Year over year it grows 68% against FY2026.

Funding trajectory

Project IB1 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

05.4FY25ACTUAL4.5FY26ENACTED7.6FY27REQUEST2.0FY288.5FY298.5FY308.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual5.4
FY2026Enacted4.5
FY2027Request7.6
FY2028Outyear2.0
FY2029Outyear8.5
FY2030Outyear8.5
FY2031Outyear8.6
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Integrated Beam Control Systems Demo for C-CM▲ 68%
FY2025 actual$5.4M
FY2026 enacted$4.5M
FY2027 request$7.6M

FY2027 planned work Continue integration and testing of subsystems utilizing existing beam control test assets. Develop documentation and procedures outlining design considerations for beam control systems. Design and develop an integrated beam control system specifically tailored for strategic mission requirements. Establish detailed system specifications for Directed Energy strategic mission applications.

FY2026 to FY2027 change Funding increase reflects the effort to prioritize integrated system development and testing to accelerate capability maturation, shifting resources to align with current strategic priorities and supports future rapid technology transition for critical Directed Energy capabilities.

FY2026 plans — current year This effort will continue the development of integrated beam expanders, advanced adaptive optics, and advanced laser quality track subsystems and technologies, ensuring tactical readiness in a directed energy beam control system. This effort will begin developing a demonstration strategy for subsystems to enhance and validate performance metrics. It will optimize the subsystem level designs to deliver a mission relevant design specification.

FY2025 accomplishments Initiated integration of a beam expander, advanced adaptive optics, and advanced laser quality track subsystems with a high energy laser testbed. Initiated field validation strategy to iteratively optimize advanced algorithms. Began progress towards demonstrating extended effective range of a high energy laser weapon system and transitioning Technology Readiness Level (TRL) 6 technologies to a program of record for a block upgrade to current system architectures.

Project detail

What project IB1 buys

This program will mature and demonstrate advanced beam control technologies to extend the effective range of a High Energy Laser system. Integrate a large-aperture, off-axis telescope into a government testbed with advanced adaptive optics and tracking. Validate and optimize adaptive optics and laser-quality tracking algorithms to demonstrate increased range capabilities for multi-domain missions, including counter-cruise missile operations. Research in this Project complements other Army Directed Energy efforts conducted under (PE) 0602150A (Air and Missile Defense Technology)/Projects DC1 (Next Generation Directed Energy Concept Development and Analysis) and DE3 (Advanced Beam Control Component Development for Counter-Cruise Missile). The cited work aligns with the Army Modernization Priority of Air and Missile Defense in developing advanced systems to protect against aerial threats. Research is performed by the United States Army Space and Missile Defense Command - Technical Center (USASMDC-TC) in coordination with Program Acquisition Executive (PAE) FIRES.

FY2027 Request
$5.1M
▲ 1.2% vs FY2026
FY2026 Enacted
$5.0M
▲ 25% vs FY2025
FY2025 Actual
$4.0M
Prior year

Optimized High Energy Laser Source Adv Tech — one RDT&E project inside PE 0603466A. Congressional marks are recorded on the program element, not on a project.

Project CV6 — Optimized High Energy Laser Source Adv Tech — requests $5.1M in FY2027, 8.0% of the $63.9M requested for program element 0603466A. Year over year it grows 1.2% against FY2026.

Funding trajectory

Project CV6 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.0FY25ACTUAL5.0FY26ENACTED5.1FY27REQUEST4.8FY283.3FY293.4FY303.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.0
FY2026Enacted5.0
FY2027Request5.1
FY2028Outyear4.8
FY2029Outyear3.3
FY2030Outyear3.4
FY2031Outyear3.4
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Optimized High Energy Laser Source Advanced Technology▲ 1%
FY2025 actual$4.0M
FY2026 enacted$5.0M
FY2027 request$5.1M

FY2027 planned work This effort will conduct hardware-in-the-loop testing of advanced laser source components, refine ruggedized packaging approaches, implement improved thermal management techniques, and evaluate subsystem-level performance to inform future integration and transition decisions.

FY2026 to FY2027 change Funding increase due to economic assumptions.

FY2026 plans — current year This effort will continue the development and integration of remaining direct diode laser modules into a 30-kW class laser meeting the dimensions of a Counter-UAS Systems. This effort will demonstrate a 30-kW class laser prior to acceptance of hardware. Anticipated successful completion of the demonstration will serve as a decision point to pursue future improvements to Size, Weight and Power or pursue direct diode replacements for other US Army Directed Energy prototype efforts.

FY2025 accomplishments This effort continued improvement and integration of the 50 kW-class semiconductor high energy laser subsystem module with a focus on validating performance of components and subsystems as they are integrated. As a risk reduction this effort will integrate a 30 kW-class ruggedized laser module into a prototype High Energy Laser System for testing and experimentation.

Project detail

What project CV6 buys

This project matures and demonstrates optimized high energy laser (HEL) source technologies to enable more affordable laser sources for integration into next-generation HEL weapon systems. The effort aims to reduce system cost, improve thermal management, increase power efficiency, and refine subsystem performance to meet operational requirements and support integration into advanced HEL architectures. Activities may include design optimization, risk reduction, and component-level testing. It complements Army Directed Energy initiatives under PE 0602150A / Project DC1 (Next Generation Directed Energy Concept Development and Analysis) and PE 0603466A / Project CV7 (High Energy Laser Direct Diode Applied Technology). The work aligns with the 2026 National Defense Strategy of Protecting the Homeland borders and skies and the Modernization of Missile Defense both priority lines of effort. The work also aligns with the Army Modernization Priority of Air and Missile Defense in developing advanced systems to protect against aerial threats. Research is performed by the U.S. Army Space and Missile Defense Command - Technical Center (USASMDC-TC) in coordination with Program Acquisition Executive (PAE) FIRES.

FY2027 Request
$0.8M
▼ 93% vs FY2026
FY2026 Enacted
$11.8M
▲ 2.0% vs FY2025
FY2025 Actual
$11.6M
Prior year

Unconventional Countermeasures-Survivability ATech — one RDT&E project inside PE 0603466A. Congressional marks are recorded on the program element, not on a project.

Project AE3 — Unconventional Countermeasures-Survivability ATech — requests $0.8M in FY2027, 1.2% of the $63.9M requested for program element 0603466A. Year over year it falls 93% against FY2026.

Funding trajectory

Project AE3 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

011.6FY25ACTUAL11.8FY26ENACTED0.8FY27REQUEST2.3FY282.6FY292.9FY302.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual11.6
FY2026Enacted11.8
FY2027Request0.8
FY2028Outyear2.3
FY2029Outyear2.6
FY2030Outyear2.9
FY2031Outyear2.9
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Advanced Integrated Unconventional Countermeasures Applications Demonstrations▼ 100%
FY2025 actual$1.7M
FY2026 enacted$1.9M
FY2027 request

Matured and demonstrated physical prototype survivability enhancement kits for fire assets.

Assured Protection of Layered Logistics Operations (APoLLO)▼ 100%
FY2025 actual$9.9M
FY2026 enacted$9.9M
FY2027 request

Refined and demonstrated passive unconventional countermeasures systems tailored for additional fixed logistics assets. Optimized active countermeasures with specific focus on low-cost logistics protection of hard-to-move unique system and subsystems.

Unconventional Countermeasures in Multi-Domain Operations DemonstrationsNEW
FY2025 actual
FY2026 enacted
FY2027 request$0.8M

Demonstrate and evaluate unconventional countermeasures technologies for critical Air and Missile Defense (AMD) assets in a relevant Multi-Domain Operations environment; integrate tunable signature management solutions into existing infrastructure.

Project AE3 — every activity in full →
Project detail

What project AE3 buys

This project matures and demonstrates technologies to increase survivability of personnel and critical assets using integrated unconventional countermeasures. These countermeasures include tone down concepts for signature management using novel materials, rapidly deployable, low-cost, multisprectral survivability enhancement technologies as well as intuitive decision support technologies to select and assess non-kinetic protective measures. Work in this Project complements Program Element (PE) 0602150A (Air and Missile Defense Technology) / Project AE2 (Unconventional Countermeasures-Survivability Tech). Work in this Project is conducted by the United States Army Engineer Research and Development Center Geotechnical and Structures Laboratory.

FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$35.8M
▲ 8.3% vs FY2025
FY2025 Actual
$33.0M
Prior year

Weapons Components Adv Technology (CA) — one RDT&E project inside PE 0603466A. Congressional marks are recorded on the program element, not on a project.

Project BN7 — Weapons Components Adv Technology (CA) — requests in FY2027, 0.0% of the $63.9M requested for program element 0603466A. Year over year it falls 100% against FY2026.

Funding trajectory

Project BN7 funding, FY2025–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25033.0FY25ACTUAL35.8FY26ENACTED
Actual Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual33.0
FY2026Enacted35.8
Project detail

What project BN7 buys

Congressional Interest Item funding provided for Weapons Components Advanced Technology. The cited work is consistent with the Under Secretary of War for Research and Engineering priority focus areas and the Army modernization strategy.