RDT&E Program Element · President's Budget PB2027

Ballistic Missile Defense Joint Warfighter Support

PE 0603898C·Defense-Wide·Approp. 0400 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$50.4M
⚑ Contested — House approps cuts 5.5%
HitchAI read

Defense-Wide requests $50.4M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators cut 5.5% (to $47.7M). MP SOLUTIONS leads the industry work.

FY2027 Request
$50.4M
▲ 11% vs FY2026
House approps mark
$47.7M
▼ $2.8M vs request
FY2026 Enacted
$45.5M
In law

Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, Defense-Wide agencies are requesting $50.4M for Ballistic Missile Defense Joint Warfighter Support under RDT&E program element 0603898C, up 11% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $47.7M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550049.2FY25ACTUAL45.5FY26ENACTED50.4FY27REQUEST49.1FY2850.5FY2952.2FY3052.5FY31HOUSE APPROPS
Actual Enacted Request Outyear (FYDP) House approps mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual49.2
FY2026Enacted45.5
FY2027Request50.4
FY2028Outyear49.1
FY2029Outyear50.5
FY2030Outyear52.2
FY2031Outyear52.5
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

4 projects roll up into PE 0603898C

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 11% overall, which can hide much larger swings below.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$50.4M
House NDAA (HASC)HASC
$50.4M full · +$0
Senate NDAA (SASC)SASC
$50.4M full · +$0
House Approps (HAC-D)HAC_D
$47.7M −$2.8M · −5.5%
▲ $2.8M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

MP SOLUTIONS
$10.7M · 21%
Wargames and Exercises - Wargames Contractor Support - TEAMS Test · CPFF
JACOBS
$7.9M · 16%
Strategic Warfighter Integration - Joint Warfighter Support - Ops Center Refresh & MDST Support · CPAF
Where FY2027 funding flowsShare$M
Industry primes70%35.2
Government labs & warfare centers23%11.4
Other / unspecified7.6%3.8
FY2027 request100%50.4
See MP SOLUTIONS's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Joint Warfighter Support Program (JWSP) is the Missile Defense Agency's (MDA's) primary means for providing direct technical support to Combatant Commands (CCMDs), the Military Services, and the Joint Staff on Missile Defense System development, testing, operational support of CCMD Operational Plans (OPLANs), and configuration management. The JWSP performs Force Development functions which enables delivery of Missile Defense System capabilities to Warfighters and ensures their participation in the identification and development of new Missile Defense (MD) capabilities.

The Integrated Research and Development for Enterprise Solutions (IRES) Contract and the Specialized Warfighter Development Contract are the major performing integrated contracts. The acquisition strategy for Strategic Warfighter Integration mission execution is to employ a contract to perform designated integration and sustainment tasks to conduct Missile Defense System RDT&E. Strategic Warfighter Integration is operated by Missile Defense (MD) subject matter experts (SMEs) composed of Government, military, civilian personnel, Contract Support Services, and major defense contractors.

Project MT03, MD03, MD40, MC03 — Joint Warfighter Support Test
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House approps do to this request, and what is still unresolved?Which project inside PE 0603898C is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what MP SOLUTIONS has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603898C (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Ballistic Missile Defense Joint Warfighter Support (PE 0603898C)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603898C
Machine access
Markdown twin /programs/0603898C.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$25.4M
▲ 6.6% vs FY2026
FY2026 Enacted
$23.8M
▼ 4.6% vs FY2025
FY2025 Actual
$25.0M
Prior year

Joint Warfighter Support Test — one RDT&E project inside PE 0603898C. Congressional marks are recorded on the program element, not on a project.

Project MT03 — Joint Warfighter Support Test — requests $25.4M in FY2027, 50% of the $50.4M requested for program element 0603898C. Year over year it grows 6.6% against FY2026.

Funding trajectory

Project MT03 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25025.0FY25ACTUAL23.8FY26ENACTED25.4FY27REQUEST26.0FY2826.6FY2926.8FY3026.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual25.0
FY2026Enacted23.8
FY2027Request25.4
FY2028Outyear26.0
FY2029Outyear26.6
FY2030Outyear26.8
FY2031Outyear26.8
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Wargames and Exercises▲ 9%
FY2025 actual$20.7M
FY2026 enacted$20.2M
FY2027 request$22.1M

The exhibit describes this work once, for project MT03 as a whole, rather than per activity. Read the project justification →

Program, Planning and Operations▼ 9%
FY2025 actual$4.3M
FY2026 enacted$3.6M
FY2027 request$3.3M

The exhibit describes this work once, for project MT03 as a whole, rather than per activity. Read the project justification →

Project MT03 — every activity in full →
Who's building it

Named performers on project MT03

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

MP SOLUTIONS
$10.7M · 42%
JACOBS
$5.4M · 21%
Marzen
$4.6M · 18%
Northrop Grumman
$0.5M · 2.0%
Project detail

What project MT03 buys

Joint Warfighter Support Test provides support to Missile Defense System Wargames and Exercises. Wargames and Exercises: - Support the Warfighter to plan and conduct worldwide Wargames and Exercises supporting Missile Defense System development and fielding. - Enable the Warfighter to define, test, deploy, and employ new missile defense capabilities. - Support Joint Functional Component Commander (JFCC) for Integrated Missile Defense (IMD) Missile Defense System Table Top Exercises (TTX) to facilitate the global missile defense capability and to refine the European capability concept of operations through low-fidelity demonstration Models & Simulation (M&S). - Continue test planning for Wargames and Exercises.

R-3 lines of work
  • Support
  • Test and Evaluation
FY2027 Request
$22.9M
▲ 15% vs FY2026
FY2026 Enacted
$20.0M
▼ 7.2% vs FY2025
FY2025 Actual
$21.5M
Prior year

Joint Warfighter Support — one RDT&E project inside PE 0603898C. Congressional marks are recorded on the program element, not on a project.

Project MD03 — Joint Warfighter Support — requests $22.9M in FY2027, 46% of the $50.4M requested for program element 0603898C. Year over year it grows 15% against FY2026.

Funding trajectory

Project MD03 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

021.5FY25ACTUAL20.0FY26ENACTED22.9FY27REQUEST21.4FY2821.9FY2923.2FY3023.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual21.5
FY2026Enacted20.0
FY2027Request22.9
FY2028Outyear21.4
FY2029Outyear21.9
FY2030Outyear23.2
FY2031Outyear23.3
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Strategic Warfighter Integration▲ 15%
FY2025 actual$21.5M
FY2026 enacted$20.0M
FY2027 request$22.9M

The exhibit describes this work once, for project MD03 as a whole, rather than per activity. Read the project justification →

Project MD03 — every activity in full →
Who's building it

Named performers on project MD03

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Northrop Grumman
$4.8M · 21%
STRATEGIC ALLIANCE SOLUTIONS
$4.0M · 17%
JACOBS
$2.5M · 11%
Palantir
$1.3M · 5.7%
Project detail

What project MD03 buys

There are seven primary functions in Joint Warfighter Support (MD03): (1) Missile Defense Operations Support. (2) Combatant Command Integration. (3) Military Service Integration. (4) Operational Missile Defense System Verification and Validation. (5) Warfighter Training and Education Support. (6) Joint Staff Integration. (7) Reserve Integration. Detailed descriptions and accomplishments are provided in section B. Accomplishments/Planned Program.

R-3 lines of work
  • Support
FY2027 Request
$1.9M
▲ 21% vs FY2026
FY2026 Enacted
$1.6M
▼ 39% vs FY2025
FY2025 Actual
$2.6M
Prior year

Program-Wide Support — one RDT&E project inside PE 0603898C. Congressional marks are recorded on the program element, not on a project.

Project MD40 — Program-Wide Support — requests $1.9M in FY2027, 3.8% of the $50.4M requested for program element 0603898C. Year over year it grows 21% against FY2026.

Funding trajectory

Project MD40 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

02.6FY25ACTUAL1.6FY26ENACTED1.9FY27REQUEST1.5FY281.8FY292.0FY302.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual2.6
FY2026Enacted1.6
FY2027Request1.9
FY2028Outyear1.5
FY2029Outyear1.8
FY2030Outyear2.0
FY2031Outyear2.2
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Program Wide Support▲ 21%
FY2025 actual$2.6M
FY2026 enacted$1.6M
FY2027 request$1.9M

FY2026 to FY2027 change - Increase from FY 2026 to FY 2027 provides the PWS allocation on a pro-rata basis across multiple Agency PEs each FY based on the total Agency budget and, therefore, fluctuates per PE by FY.

Who's building it

Named performers on project MD40

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

HUNTSVILLE REHABILITATION FOUNDATION
$1.2M · 63%
Project detail

What project MD40 buys

PWS contains non-headquarters management costs in support of Missile Defense Agency (MDA) functions and activities across the entire Missile Defense System. These functions include Government Civilians and Contract Support Services. This effort provides integrity and oversight of the Missile Defense System as well as supports MDA in the development and evaluation of technologies that will respond to the changing threat. Additionally, PWS includes personnel to support global deployments performing deployment site preparation and activation, and provides facility capabilities for MDA Executing Agent locations worldwide. Other MDA wide costs include: physical and technical security; civilian drug testing; audit readiness; the Science, Technology, Engineering, and Mathematics (STEM) program; legal services and settlements; travel and agency training; office, equipment, vehicle, and warehouse leases; utilities and base operations across multiple geographic locations; commercial and ancillary facility services; management of all facility aspects regardless of lifecycle stage; supplies and maintenance; compliance with statutory environmental requirements; data and unified communications support; materiel and readiness and central property management of equipment; Facilities Sustainment, Restoration and Modernization (FSRM) program (formerly Real Property Maintenance) to keep the Department's inventory of facilities in good working order; and similar operating expenses. PWS is allocated on a pro-rata basis across most Agency PEs and, therefore, fluctuates per PE by FY based on the total Agency budget in that FY.

R-3 lines of work
  • Support
FY2027 Request
$0.2M
▲ 4.8% vs FY2026
FY2026 Enacted
$0.2M
▲ 0.6% vs FY2025
FY2025 Actual
$0.2M
Prior year

Cyber Operations — one RDT&E project inside PE 0603898C. Congressional marks are recorded on the program element, not on a project.

Project MC03 — Cyber Operations — requests $0.2M in FY2027, 0.3% of the $50.4M requested for program element 0603898C. Year over year it grows 4.9% against FY2026.

Funding trajectory

Project MC03 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.2FY25ACTUAL0.2FY26ENACTED0.2FY27REQUEST0.2FY280.2FY290.2FY300.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.2
FY2026Enacted0.2
FY2027Request0.2
FY2028Outyear0.2
FY2029Outyear0.2
FY2030Outyear0.2
FY2031Outyear0.2
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Strategic Warfighter Integration Software Assurance Support▲ 5%
FY2025 actual$0.2M
FY2026 enacted$0.2M
FY2027 request$0.2M

The exhibit describes this work once, for project MC03 as a whole, rather than per activity. Read the project justification →

Who's building it

Named performers on project MC03

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Decisive Analytics
$0.2M · 100%
Project detail

What project MC03 buys

This program verifies and validates that cybersecurity and/or cybersecurity-enabled products (firewalls, data/network encryption devices, routers, Intrusion Detection Systems, etc.) used within the Missile Defense Agency (MDA) infrastructure have a current and Evaluated Assurance Level (EAL) certification and rating. They assure that validated information technology (IT) products are listed on the Department of War (DoW) Approved Products List Integrated Tracking System (APLITS). There is an additional requirement to routinely identify findings and prepare a report with recommendations. This support is required in the IT product evaluation. Activities in the Project are necessary to comply with the Federal Information Systems Modernization Act of 2014.

R-3 lines of work
  • Test and Evaluation