RDT&E Program Element · President's Budget PB2027

Warfare Support System

PE 0604230N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$73.1M
◆ Scaling +363%
HitchAI read

U.S. Navy funding ramps 363% to a $73.1M request in FY2027, before stepping down 75% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators added 6.8% (to $78.1M). GTRI leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$73.1M
▲ 363% vs FY2026
FY2026 Enacted
$15.8M
▼ 85% vs FY2025
FY2025 Actual
$105.9M
Prior year

Roll-up of 8 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $73.1M for Warfare Support System under RDT&E program element 0604230N, up 363% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550751000105.9FY25ACTUAL15.8FY26ENACTED73.1FY27REQUEST39.5FY2830.0FY2917.8FY3018.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual105.9
FY2026Enacted15.8
FY2027Request73.1
FY2028Outyear39.5
FY2029Outyear30.0
FY2030Outyear17.8
FY2031Outyear18.2
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

8 projects roll up into PE 0604230N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 363% overall, which can hide much larger swings below.

The whole program

MESR is funded on 2 lines across 1 appropriations

This program element requests nothing for MESR in FY2027. The program is still funded — $16.6M of it — but on other lines, which usually means the work is transferring.

Also funded hereTypeComponentFY2027 $M
Mine Expeditionary Response Vehicle (MESR)RDT&ENavy16.6
MESR totalNavy16.6

Lines whose title names the program. 4 further lines only mention MESR in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$73.1M
House NDAA (HASC)HASC
$73.1M full · +$0
Senate NDAA (SASC)SASC
$73.1M full · +$0
House Approps (HAC-D)HAC_D
$78.1M +$5.0M · +6.8%
▲ $5.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

GTRI
$4.5M · 6.2%
Software development · CPFF
Aeroenvironment
$3.0M · 4.1%
Automatic Target Recognition · CPFF
Where FY2027 funding flowsShare$M
Industry primes13%9.8
Government labs & warfare centers33%24.5
Other / unspecified53%38.8
FY2027 request100%73.1
See GTRI's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Rapid Capabilities Development (RCD) program supports the Naval Special Warfare (NSW) Branch by identifying and assessing available technologies that confront current and future irregular and expeditionary warfare challenges. Program development efforts focus on the enhancement/advancement of existing technologies to fill urgent and emergent capability gaps for NSW. Program funding provides for the development, integration, testing, validation, combat demonstration, and evaluation of identified technologies to meet operational requirements; service-common and NSW program technology challenges; and technology obsolescence issues of developed capabilities.

Analysis of Alternatives (AoA) studies and/or Alternative System Reviews (ASRs) are conducted prior to the initiation of new sub-projects. The AoA addresses and emphasizes acquisitions strategies of the most cost effective solution over the sub-projects' life-cycle. The acquisition strategies observe the following hierarchy of alternatives: commercial item (including modifications), non-developmental item (including modifications), and lastly, developmental programs. Contracting for RDT&E, if required, is competitive and when feasible, production options are included.

Project 1130, 3326, 4011, 1234, 9C86, 3445, 3446, 3447 — Expeditionary Loitering Munitions Capability Development
  • Product Development
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0604230N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what GTRI has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604230N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Warfare Support System (PE 0604230N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604230N
Machine access
Markdown twin /programs/0604230N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$60.9M
▲ 8227% vs FY2026
FY2026 Enacted
$0.7M
▼ 99% vs FY2025
FY2025 Actual
$83.7M
Prior year

Expeditionary Loitering Munitions Capability Development — one RDT&E project inside PE 0604230N. Congressional marks are recorded on the program element, not on a project.

Project 1130 — Expeditionary Loitering Munitions Capability Development — requests $60.9M in FY2027, 83% of the $73.1M requested for program element 0604230N. Year over year it grows 8227% against FY2026.

Funding trajectory

Project 1130 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075083.7FY25ACTUAL0.7FY26ENACTED60.9FY27REQUEST28.4FY2820.0FY297.7FY307.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual83.7
FY2026Enacted0.7
FY2027Request60.9
FY2028Outyear28.4
FY2029Outyear20.0
FY2030Outyear7.7
FY2031Outyear7.9
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$60.0M
FY2026 enacted$0.0M
FY2027 request$48.9M

Continue engineering change development, testing and implementation for the Spiral 1 air system program. Continue the vendor-based expansion effort by completing design phase and producing prototypes air systems. Complete air system Spiral 2 software fielding.

Read the FY2027 plan →
TEST AND EVALUATIONRESTART
FY2025 actual$13.7M
FY2026 enacted$0.0M
FY2027 request$7.2M

Conduct air system vendor-based expansion prototype design and conduct flight and environmental testing. Complete air system Spiral 2 software development testing and safety certification for fielding.

PROGRAM MANAGEMENT▲ 552%
FY2025 actual$10.0M
FY2026 enacted$0.7M
FY2027 request$4.8M

Provide air system program management and technical oversight for hardware and software qualification efforts, Spiral 2 software fielding, and contract execution. Provide air system program management and technical oversight for up to 4 additional vendors to integrate Government-owned TDPs into their platforms, manufacture prototype…

Project 1130 — every activity in full →
Who's building it

Named performers on project 1130

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

GTRI
$4.5M · 7.4%
Aeroenvironment
$3.0M · 4.9%
Project detail

What project 1130 buys

The Expeditionary Loitering Munitions Portfolio consists of a family of Navy loitering munition programs (air and surface) designed to meet an urgent Geographic Combatant Command Requirement. Air and Surface Expeditionary Loitering Munitions will leverage and continue prior development efforts including an Office of Naval Research (ONR) Innovative Naval Prototype (INP). The Navy is pursuing commercial-off-the-shelf solutions with autonomous government-provided software and auxiliary systems. The systems will be expeditionary and deployable by small teams to support operations in various environments. The air system has transitioned from Low-Rate Initial Production to Full-Rate Production with the initial vendor solutions and is now expanding the industrial base for this capability by integrating government-owned technology with other vendor platform solutions. The surface system has transitioned from the ONR INP and is now in Low-Rate Initial Production. The FY 2026 budget for Expeditionary Loitering Munitions included $731,000 thousand of discretionary funding and $37,300,000 thousand of mandatory funding for a total of $38,031,000 thousand. The mandatory funds support program management and technical oversight for the air system, which included hardware and software qualification, Spiral 2 software test planning and execution, safety certification, and contract execution. This oversight will be extended to a maximum of four additional vendors to aid in the integration of Government-owned Technical Data Packages (TDPs) into their respective platforms.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services
FY2027 Request
$7.5M
▼ 12% vs FY2026
FY2026 Enacted
$8.6M
▼ 47% vs FY2025
FY2025 Actual
$16.3M
Prior year

NSW Rapid Capabilities Development for CIEC — one RDT&E project inside PE 0604230N. Congressional marks are recorded on the program element, not on a project.

Project 3326 — NSW Rapid Capabilities Development for CIEC — requests $7.5M in FY2027, 10% of the $73.1M requested for program element 0604230N. Year over year it falls 12% against FY2026.

Funding trajectory

Project 3326 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

016.3FY25ACTUAL8.6FY26ENACTED7.5FY27REQUEST8.9FY288.7FY298.8FY309.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual16.3
FY2026Enacted8.6
FY2027Request7.5
FY2028Outyear8.9
FY2029Outyear8.7
FY2030Outyear8.8
FY2031Outyear9.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Navy Irregular Warfare▼ 12%
FY2025 actual$16.3M
FY2026 enacted$8.6M
FY2027 request$7.5M

FY2027 planned work FY 2027 $7.542M funding will utilize: -$4.446M for Cognitive Router Future Naval Capability (FNC) designed to provide an artificial intelligence-enabled routing node comprised of acoustic and optical underwater modems, RF radios, and vehicle autonomy instantiated on unmanned underwater vehicles (UUV) to create a robust and clandestine low-latency cross-domain network. -$2.624M for manned/unmanned systems payload development (communications, intelligence, surveillance, reconnaissance, fiber optic, kinetic/non-kinetic effects, cyber, data security, sensors) designed to improve operator situational awareness, tactical maneuver, improved digital security, scalable effects, and lethality on the…

FY2026 to FY2027 change FY 2027 realized a -$1.076M decrease from FY 2026. This decrease corresponds to the transition of the Cognitive Router FNC from design to the delivery of prototypes for additional advanced in-water test and evaluation.

FY2026 plans — current year FY 2026 $8.618M funding will utilize: -$6.50M for Cognitive Router Future Naval Capability (FNC) designed to provide an artificial intelligence-enabled routing node comprised of acoustic and optical underwater modems, RF radios, and vehicle autonomy instantiated on unmanned underwater vehicles (UUV) to create a robust and clandestine low-latency cross-domain network. -$1.587M for manned/unmanned systems payload development (fiber optic, scalable effects (kinetic/non-kinetic), data security, sensors) designed to improve operator situational awareness, tactical maneuver, improved digital security, and lethality on the battlefield; autonomy and machine learning designed to supplement human…

Who's building it

Named performers on project 3326

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NRL
$1.0M · 13%
NIWC
$1.0M · 13%
DLA
$0.3M · 3.5%
Cydecor
$0.1M · 0.7%
Project detail

What project 3326 buys

The Rapid Capabilities Development (RCD) program supports the Naval Special Warfare (NSW) Branch by identifying and assessing available technologies that confront current and future irregular and expeditionary warfare challenges. Program development efforts focus on the enhancement/advancement of existing technologies to fill urgent and emergent capability gaps for NSW. Program funding provides for the development, integration, testing, validation, combat demonstration, and evaluation of identified technologies to meet operational requirements; service-common and NSW program technology challenges; and technology obsolescence issues of developed capabilities. The RCD program develops expeditionary/operational capabilities that enable NSW forces to conduct joint cross-domain special reconnaissance, counterterrorism, direct action, amphibious and irregular warfare, and fulfill urgent/emergent needs within a 9-36 month timeframe. The FY 2026 budget for the RCD program included $8,618,000 thousand of discretionary funding and $2,000,000 thousand of mandatory funding for a total of $10,618,000 thousand. The mandatory funds support Cognitive Router Future Naval Capability (FNC) designed to provide an artificial intelligence-enabled routing node comprised of acoustic and optical underwater modems, RF radios, and vehicle autonomy instantiated on unmanned underwater vehicles (UUV) to create a robust and clandestine low-latency cross-domain network.

R-3 lines of work
  • Support
  • Test and Evaluation
FY2027 Request
$2.9M
▼ 0.2% vs FY2026
FY2026 Enacted
$2.9M
▼ 2.4% vs FY2025
FY2025 Actual
$3.0M
Prior year

Naval Coastal Warfare Surv and C4I Sys — one RDT&E project inside PE 0604230N. Congressional marks are recorded on the program element, not on a project.

Project 4011 — Naval Coastal Warfare Surv and C4I Sys — requests $2.9M in FY2027, 4.0% of the $73.1M requested for program element 0604230N. Year over year it falls 0.2% against FY2026.

Funding trajectory

Project 4011 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

03.0FY25ACTUAL2.9FY26ENACTED2.9FY27REQUEST0.4FY280.4FY290.4FY300.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual3.0
FY2026Enacted2.9
FY2027Request2.9
FY2028Outyear0.4
FY2029Outyear0.4
FY2030Outyear0.4
FY2031Outyear0.4
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Identity Dominance Systemflat
FY2025 actual$3.0M
FY2026 enacted$2.9M
FY2027 request$2.9M

FY2027 planned work IDS will increase development for Identity Operations and Force Protection efforts for deployed individuals. Increased efforts associated with system Tech Refresh and the development of a database of non-authorized personnel will enable potential threats to be identified at foreign access control points and in international waters. Biometrically Enabled Access Control - Husbanding (BEACH) development efforts will improve technical and operational capabilities of the identified solution, in partnership with Naval Criminal Investigative Service (NCIS). The program will develop improvements to OCONUS communications and biometric vetting pathways to improve rapid evaluation of identities to…

FY2026 to FY2027 change FY 2027 no significant change

FY2026 plans — current year IDS will continue to support Identity Operations and Force Protection efforts for deployed individuals. The continued efforts of building a database of non-authorized personnel will allow potential threats to be identified at foreign access control points and in international waters. Biometrically Enabled Access Control - Husbanding (BEACH) development efforts will focus on technical and limited operational evaluation of identified solution, in partnership with Naval Criminal Investigative Service (NCIS).

Project detail

What project 4011 buys

Identity Dominance System (IDS) supports the Navy's Visit, Board, Search and Seizure (VBSS) teams conducting expanded Maritime Interception Operations (MIO) with a biometric capability. IDS provides the Navy with a means to collect and process identity information in the conduct of maritime and expeditionary operations. There are three key aspects of this capability: 1) Enable forces to rapidly identify unknown individuals encountered in the conduct of operations. 2) Verify an unknown individual's claimed identity. 3) Enable forces to update, manage, and share identity information on friendly, neutral, and enemy individuals in support of Identity Operations (IdOps). To support IdOps and achieve identity dominance for expeditionary and naval forces, the future biometrics collection and processing equipment needs to be smaller, lighter, and more efficient with respect to computing power and speed when compared against the current system. The equipment needs to take advantage of enhanced communications capabilities, be able to store the appropriate amount of data to collect biometric samples, match the samples against an internal database and reach near real time operations with connectivity to the DoW biometrics database. In addition to Navy VBSS MIO, IDS also supports the Expeditionary Exploitation Unit One (EXU-1) expeditionary missions. IDS must continue to mature and adapt to the changing threat environment and emerging requirements to support these missions. Biometrically Enabled Access Control - Husbanding (BEACH) is an authentication capability to improve identity and authentication assurance for entrance to OCONUS Navy-Controlled and non-Navy Controlled ports. BEACH will perform the following functions: 1) Collect, match, and share identity data from candidate husbanding personnel for vetting against U.S. Department of War (DoW) authoritative databases (biometric) and U.S. LE and intelligence data repositories (biographic). 2) Create and manage customized access control lists for any U.S. Naval ship, foreign port, or other location. 3) Conduct verification (access control) of individuals seeking access to U.S. Navy assets through multiple factor authentication, including biometric modalities.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$0.9M
▲ 4.3% vs FY2026
FY2026 Enacted
$0.9M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Unmanned Surface Vehicle (USV) — one RDT&E project inside PE 0604230N. Congressional marks are recorded on the program element, not on a project.

Project 1234 — Unmanned Surface Vehicle (USV) — requests $0.9M in FY2027, 1.3% of the $73.1M requested for program element 0604230N. Year over year it grows 4.3% against FY2026.

Funding trajectory

Project 1234 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL0.9FY26ENACTED0.9FY27REQUEST0.9FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.9
FY2027Request0.9
FY2028Outyear0.9
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Program USV Development▲ 4%
FY2025 actual$0.0M
FY2026 enacted$0.9M
FY2027 request$0.9M

FY2027 planned work Based on FY26 material solution development and Phase I prototyping & testing, improve USV and sensor material solution development, conduct Phase II prototype developmental test & evaluation, develop craft reports and complete capabilities documentation and specifications for production craft.

FY2026 to FY2027 change No significant increase.

FY2026 plans — current year FY26 funds efforts in support of Unmanned Surface Vessel (USV) development and integration to the Navy Expeditionary Combat Forces (NECF) maritime operations to increase Maritime Domain Awareness (MDA) and Force Engagement. Efforts include identifying USV and sensor capabilities in accordance with current mission sets, identifying material solutions, conducting prototype USV design integration and conducting Phase I prototype developmental test & evaluation.

Project detail

What project 1234 buys

New Start USV development: The Program funding for development of the Unmanned Surface Vessel (USV) System Development, reflecting the Navy's vision of eventually fielding the USV across all unmanned surface platforms.

R-3 lines of work
  • Product Development
FY2027 Request
$0.8M
▼ 3.9% vs FY2026
FY2026 Enacted
$0.8M
▼ 8.1% vs FY2025
FY2025 Actual
$0.9M
Prior year

Combatant Craft Replacement — one RDT&E project inside PE 0604230N. Congressional marks are recorded on the program element, not on a project.

Project 9C86 — Combatant Craft Replacement — requests $0.8M in FY2027, 1.1% of the $73.1M requested for program element 0604230N. Year over year it falls 3.9% against FY2026.

Funding trajectory

Project 9C86 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.9FY25ACTUAL0.8FY26ENACTED0.8FY27REQUEST0.8FY280.8FY290.9FY300.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.9
FY2026Enacted0.8
FY2027Request0.8
FY2028Outyear0.8
FY2029Outyear0.8
FY2030Outyear0.9
FY2031Outyear0.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Combatant Craft Replacement▼ 4%
FY2025 actual$0.9M
FY2026 enacted$0.8M
FY2027 request$0.8M

FY2027 planned work Continue material solution development; advanced technology development as well as planning, research, analysis, design and development to recapitalize and/or replace Expeditionary Craft to clear, secure and protect in a contested environment as well as meet new evolving mission requirements. Continue development & fielding of a Navy Expeditionary Combat Force Unmanned Surface Vessel to increase Maritime Domain Awareness and Force Engagement. Continue science and technology development to optimize material solutions to fill critical Expeditionary capability gaps as well as transition Small Business Innovative Research Programs and other technology programs. Continue to develop small form…

FY2026 to FY2027 change No significant change.

FY2026 plans — current year Complete developmental testing and evaluation, Event 2, of outboard diesel engine technology, boat launch and recovery for autonomous mine counter measure systems, advanced hull and propulsor technology and enabling sensors. Continue material solution development, advanced technology development as well as planning, research, analysis, design and development to recapitalize or replace Expeditionary Craft to clear, secure and protect in a contested environment. Begin development and fielding of a Navy Expeditionary Combat Force Unmanned Surface Vessel to increase Maritime Domain Awareness and Force Engagement. Continue science and technology development to optimize material solutions to fill…

Project detail

What project 9C86 buys

Navy Expeditionary Combat patrol boats, Fleet Expeditionary Security combatant craft, Underwater Construction Team (UCT) and Explosive Ordnance Disposal (EOD) replacement will provide second generation Multi Mission Craft that will replace in-service Force Protection Large, Force Protection Small, Underwater Construction and EOD craft. Boat and craft replacements will: conduct Maritime Security Operations across the full spectrum of naval, joint, and combined operations enabling access and freedom of action throughout the sea-to-shore and inland operating environments as well as conduct maritime Mine Countermeasures (MCM), counter Improvised Explosive Devices (IEDs), Weapons of Mass Destruction (WMD), and all other types of weaponry, for protection of naval and joint assets required for sea control and power projection. Specific mission and capabilities will be identified in an Initial Capabilities Document (ICD), Analysis of Alternatives (AoA), Capabilities Production Document (CPD) and required milestone documentation. RDT&E funding will fund procurement and material solution studies, advanced technology development and studies, design development and test and evaluation and transition Small Business Innovative Research Programs and other technology programs expeditionary science & technology objectives as follows: RDT&E funding will fund procurement and material solution studies, advanced technology development and studies, expeditionary science & technology objectives, design development and test and evaluation and transition Small Business Innovative Research Programs and other technology programs.

R-3 lines of work
  • Product Development
  • Test and Evaluation
FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$1.2M
Prior year

Visual Augmentation System Development — one RDT&E project inside PE 0604230N. Congressional marks are recorded on the program element, not on a project.

Project 3445 — Visual Augmentation System Development — requests $0.0M in FY2027, 0.0% of the $73.1M requested for program element 0604230N.

Funding trajectory

Project 3445 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

01.2FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.2
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Visual Augmentation Systems
FY2025 actual$1.2M
FY2026 enacted$0.0M
FY2027 request$0.0M

FY2026 plans — current year VAS RDT&E funding has transitioned from RDT&E to procurement to provide procurement of service common VAS to meet Navy Expeditionary Combat Force requirements.

Project detail

What project 3445 buys

The United States Navy Service Common Visual Augmentation Systems (VAS) Program of Record manages, procures, and maintains night vision devices, thermal detection devices, day/night weapons optics, and lasers in support of Navy combat capabilities with regard to the detection, recognition, classification, tracking, and destruction of hostile air and surface forces. The USN VAS Program also manages research into the future of visual augmentation systems and engages with Navy and DoW VAS stakeholders to ensure the Navy maintains competitive advantage over near-peer adversaries. Research, Development, Test and Evaluation, Navy funding provides the United States Navy Service Common Visual Augmentation Systems (VAS) Program of Record with the ability to maintain competitive advantage over the nation's near peer adversaries by leveraging the military research community, other DoW VAS programs, academia and commercial industry in order to transition mature technologies (active, passive, multi-domain imaging sensors, laser systems, display systems, optics, image processing) that align with US Navy and DoW priorities.

R-3 lines of work
  • Test and Evaluation
  • Management Services
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$0.9M
▲ 0.5% vs FY2025
FY2025 Actual
$0.9M
Prior year

Expeditionary sUAS Development — one RDT&E project inside PE 0604230N. Congressional marks are recorded on the program element, not on a project.

Project 3446 — Expeditionary sUAS Development — requests $0.0M in FY2027, 0.0% of the $73.1M requested for program element 0604230N. Year over year it falls 100% against FY2026.

Funding trajectory

Project 3446 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.9FY25ACTUAL0.9FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.9
FY2026Enacted0.9
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Product Development▼ 100%
FY2025 actual$0.3M
FY2026 enacted$0.3M
FY2027 request$0.0M

FY2026 to FY2027 change FY 2026 to FY 2027 reduction reflects no planned Product Development efforts in FY 2027.

FY2026 plans — current year - Continue implementation of SRA efforts for FoSUAS platforms. - Complete design of engineering solutions for mandatory SUAS cyber security assessments for all SUAS systems/components. - Complete analysis on system interoperability and modularity.

Support▼ 100%
FY2025 actual$0.2M
FY2026 enacted$0.3M
FY2027 request$0.0M

FY2026 to FY2027 change FY 2026 to FY 2027 reduction reflects no planned Support efforts in FY 2027.

FY2026 plans — current year - Continue to research in relevant technical areas where SRA refinement and modernization is required. - Complete engineering analysis of commercial systems. - Complete market research to inform future technology demonstrations. - Complete initial (on new components) and mandatory recurring engineering assessments including, but not be limited to, cyber security, air worthiness, flight clearances, authority to operate, and battery certification of FoSUAS.

Test and Evaluation▼ 100%
FY2025 actual$0.3M
FY2026 enacted$0.3M
FY2027 request$0.0M

FY2026 to FY2027 change FY 2026 to FY 2027 reduction reflects no planned Test and Evaluation efforts in FY 2027.

FY2026 plans — current year - Continue implementation and evaluation of SRA for FoSUAS platforms. - Complete assessment of low cost, commercially available UAS to inform future procurements, and determine potential via field user evaluations, lab analysis/testing, and market research of low cost, commercially available UAS to inform future procurements. - Complete NDAA sections 817 (FY2023) and 848 (FY2020) Compliance testing on systems; Cybersecurity and NDAA compliance testing compliance testing is performed by a third-party vendor to ensure appropriate levels for data encryption, implementation of multi-factor authentication, and risk assessments. - Complete assessment of UAS, software applications, payload/sensor…

Project detail

What project 3446 buys

The Navy is utilizing a Family of Systems (FoS) strategy to acquired Small Unmanned Aerial Systems, in alignment with other domain-centered unmanned FoS. The Navy Family of Small Unmanned Aircraft Systems (FoSUAS) program supports Navy Expeditionary Combat Command (NECC), Expeditionary Exploitation Unit ONE (EXU-1), and Naval School Explosive Ordnance Disposal (NAVSCOLEOD). The program procures existing and emerging technologies (including enhancement kits/payloads) in Fixed Wing (FW) and Vertical Take Off and Landing (VTOL) solution sets for core mission requirements and are critical in providing force protection, reconnaissance and surveillance, and repair of battle-damaged facilities and other infrastructure. FoSUAS includes Short Range/Short Endurance (SR/SE) and Medium Range/ Medium Endurance (MR/ME) categories of Small Unmanned Aircraft Systems (SUAS) with each category tailored toward specific mission needs/profiles. As such, a mix of Type/Model/Series (T/M/S) SUAS makes up the FoSUAS Program of Record (POR) as addressed in the Navy's FoSUAS Top Level Requirement (TLR) document. In addition to supporting the requirements in the Navy FoSUAS TLR, RDTE funding for the FoSUAS program conducts activities including, but not be limited to, engineering analysis of commercial systems, operational assessments, Field User Evaluations (FUEs), support of Urgent Universal Needs Statements (UUNS), cyber/IA assessments, development of SUAS Reusable Architectures (SRA) and other efforts to inform future Navy systems procurements.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$0.9M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Mine Expeditionary Response Vehicle (MESR) — one RDT&E project inside PE 0604230N. Congressional marks are recorded on the program element, not on a project.

Project 3447 — Mine Expeditionary Response Vehicle (MESR) — requests $0.0M in FY2027, 0.0% of the $73.1M requested for program element 0604230N. Year over year it falls 100% against FY2026.

Funding trajectory

Project 3447 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL0.9FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.9
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

EOD Response ROVs and Maritime Expeditionary Standoff Response System of Systems▼ 100%
FY2025 actual$0.0M
FY2026 enacted$0.9M
FY2027 request$0.0M

FY2026 to FY2027 change FY 2026 to FY 2027 funding decrease is attributed to effort no longer being funded after FY 2026 in this PE.

FY2026 plans — current year FY26 efforts will focus on test and evaluation of future increment candidate payloads for integration into future MESR increment platforms to allow warfighters to detect, classify, and prosecute explosive threats by ExMCM forces. Efforts include advancement in Artificial Intelligence and Machine Leaning (AI/ML) technologies, as well as improving Automated Target Recognition (ATR) algorithms and supervisory controlled autonomous behaviors. The Deep-Water Proof of Concept effort will continue in FY26 and include completion of CONOPS development and platform hardening to achieve depth requirements. Developmental test and evaluation of selected components will be performed leading to full up…

Project detail

What project 3447 buys

Funding realigned from Lightweight Reusable Underwater Recon Vehicle. Funding supports the development of unmanned systems for the Navy's expeditionary unmanned underwater Explosive Ordnance Disposal (EOD) and Mine Countermeasures (MCM) capability. Specifically, it provides for development of affordable expeditionary remote stand-off underwater systems to support Navy Expeditionary forces including EOD, Mobile Diving and Salvage, Underwater Construction Teams (UCT), and Expeditionary Mine Countermeasures (ExMCM) mission operations. The equipment must be highly portable in order to support the Navy EOD technician to safely detect, approach, render safe, recover, exploit, and dispose of underwater explosive threats to include sea mines, limpet mines, maritime IEDs, and unexploded ordnance. Provides support for the Navy's high priority missions of Maritime Homeland Defense and MCM. This project directly supports Department of the Navy Strategic Roadmap for Unmanned Systems promulgated in March 2018 and addresses capability gaps defined by the Joint Service EOD (JSEOD) Initial Capabilities Document (ICD), Serial Number 671-75-05 of 3 June 2005, Joint Improvised Explosive Device (IED) Defeat Initial Capabilities Document (ICD) of 23 February 2006/JROCM 070-06, and the Expeditionary MCM ICD of June 2017. This project is being executed in accordance with approved CNO N9I Requirement #056-95-19, "Capability Development Document (CDD) for Maritime Expeditionary Standoff Response Family of Systems (MESR)," July 23, 2019. Additional efforts continue to execute the open competition process necessary to acquire and verify an EOD Response ROV capability focusing on user effectiveness and operational suitability to provide a ROV based target interdiction capability to address the capability gaps assessed in the previously conducted Expeditionary UUV Neutralization System (EUNS) AoA. This next generation capability is developed to decrease risk when reacquiring/investigating a potential threat (i.e. sea mine or maritime IED). In response to emergent maritime threat assessments ISO of INDOPAC Global Power Competition (GPC) scenarios, the MESR Program of Record (PoR) will initiate and conduct a Proof-of-Concept effort to demonstrate the potential ability to counter deep-water explosive threats as an ExMCM enabling capability ISO Joint Force Maneuver.

R-3 lines of work
  • Product Development
  • Support