RDT&E Program Element · President's Budget PB2027

Advanced Hawkeye

PE 0604234N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$390.3M
Navy · RDT&E
HitchAI read

U.S. Navy requests $390.3M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Northrop Grumman leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$390.3M
▲ 11% vs FY2026
FY2026 Enacted
$350.3M
▲ 19% vs FY2025
FY2025 Actual
$295.3M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $390.3M for Advanced Hawkeye under RDT&E program element 0604234N, up 11% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

1002003004000295.3FY25ACTUAL350.3FY26ENACTED390.3FY27REQUEST428.3FY28440.2FY29427.3FY30435.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual295.3
FY2026Enacted350.3
FY2027Request390.3
FY2028Outyear428.3
FY2029Outyear440.2
FY2030Outyear427.3
FY2031Outyear435.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0604234N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 11% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$390.3M
House NDAA (HASC)HASC
$390.3M full · +$0
Senate NDAA (SASC)SASC
$390.3M full · +$0
House Approps (HAC-D)HAC_D
$390.3M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Northrop Grumman
$146.7M · 38%
AV - Primary Hardware-Fatigue/Aerial Refueling
NAWCAD
$47.8M · 12%
Developmental Test & Evaluation (DT&E)
Where FY2027 funding flowsShare$M
Industry primes56%217.9
Government labs & warfare centers35%135.5
Other / unspecified9.4%36.8
FY2027 request100%390.3
See Northrop Grumman's full federal contract ledger members
Program detail

Mission & acquisition strategy

The DSSC build schedule is outlined below along with the capabilities that are planned to comprise each DSSC build. 1. DSSC-5.1 will provide a Counter Electronic Attack (CEA) capability which will allow the E-2D radar system to maintain performance in an advanced hostile intentional electromagnetic interference environment. CEA will ensure continuous E-2D effectiveness is maintained in an Electronic Attack environment supporting the Navy Integrated Fire Control (NIFC) capability and overall Navy and Joint Integrated Air and Missile Defense strategy. 2.

E-2D Milestone C Acquisition Strategy was approved by Milestone Decision Authority, Under Secretary of Defense for Acquisition, Technology and Logistics (USD(AT&L)) on 29 Dec 2008. Milestone C approval to proceed into Production and Deployment was given 11 June 2009 by USD (AT&L). Certification for entrance into Initial Operational Test & Evaluation was received on 06 Feb 2012. Full Rate Production Acquisition Strategy approved on 20 August 2012. Initial Operational Test & Evaluation concluded 1 October 2012. Successfully held a Defense Acquisition Board for Full Rate Production. Received a successful decision to enter into Full Rate Production on 01 March 2013. Initial Operational Capability achieved on 10 October 2014.

Project 3051, 9999 — E-2D Adv Hawkeye
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0604234N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Northrop Grumman has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604234N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Advanced Hawkeye (PE 0604234N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604234N
Machine access
Markdown twin /programs/0604234N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$390.3M
▲ 11% vs FY2026
FY2026 Enacted
$350.3M
▲ 25% vs FY2025
FY2025 Actual
$280.8M
Prior year

E-2D Adv Hawkeye — one RDT&E project inside PE 0604234N. Congressional marks are recorded on the program element, not on a project.

Project 3051 — E-2D Adv Hawkeye — requests $390.3M in FY2027, 100% of the $390.3M requested for program element 0604234N. Year over year it grows 11% against FY2026.

Funding trajectory

Project 3051 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

1002003004000280.8FY25ACTUAL350.3FY26ENACTED390.3FY27REQUEST428.3FY28440.2FY29427.3FY30435.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual280.8
FY2026Enacted350.3
FY2027Request390.3
FY2028Outyear428.3
FY2029Outyear440.2
FY2030Outyear427.3
FY2031Outyear435.0
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$10.2M
FY2026 enacted$12.9M
FY2027 request$11.0M

The E-2D program will continue improvement efforts to maintain aircraft readiness. The program will continue to address known, predicted and emergent obsolescence equipment issues. The full scale fatigue program will complete teardown analysis, continue to conduct additional coupon panel testing and evaluate propeller fatigue. The…

Read the FY2027 plan →
FY2025 actual$187.5M
FY2026 enacted$215.9M
FY2027 request$284.0M

Complete transition of DSSC 5 Sensor Netting, Data Fusion, and Global Lightning integration effort to the E-2D fleet. Continue E-2D DSSC-6/Block II development of Flight and Mission computer hardware, National Technical Means (NTM), Open Mission Systems (OMS), and other associated obsolescence mitigation technical refresh efforts…

Read the FY2027 plan →
FY2025 actual$83.0M
FY2026 enacted$121.5M
FY2027 request$95.3M

Completion of DSSC-5.2 development test and correction of deficiencies. Continue development of ESTEL E-2D Block II capabilities to support HECTR and TCID system integration and future DT/OT. Continue to develop and improve LVC capabilities to replicate previous flight events in the lab environment with captured inflight data and to…

Read the FY2027 plan →
Classified DSSC Support
FY2025 actual$0.2M
FY2026 enacted$0.0M
FY2027 request$0.0M

Details of this project are classified.

Project 3051 — every activity in full →
Who's building it

Named performers on project 3051

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Northrop Grumman
$146.7M · 38%
NAWCAD
$47.8M · 12%
Rockwell Collins
$10.3M · 2.6%
NAWCWD
$8.4M · 2.1%
Project detail

What project 3051 buys

The DSSC build schedule is outlined below along with the capabilities that are planned to comprise each DSSC build. 1. DSSC-5.1 will provide a Counter Electronic Attack (CEA) capability which will allow the E-2D radar system to maintain performance in an advanced hostile intentional electromagnetic interference environment. CEA will ensure continuous E-2D effectiveness is maintained in an Electronic Attack environment supporting the Navy Integrated Fire Control (NIFC) capability and overall Navy and Joint Integrated Air and Missile Defense strategy. 2. DSSC-5.1 and 5.2 will provide phased E-2D Data Fusion Improvements for a fusion engine to blend on and off-board sensor derived track data (e.g. Electronic Surveillance, Satellite Receiver System data, Fighter to Fighter backlink data) with already blended radar, Identify Friend or Foe and Cooperative Engagement Capability track files, enhancing situational awareness and tactical decision making. Integrating Link-16 Network Participation Group 20 messages improves interoperability between E-2D and participating US Navy fighters, including 5th generation aircraft. This enhances the combat effectiveness of the E-2D, increases situational awareness and shortens kill-chain timeliness (including NIFC). Successful E-2D NIFC employment depends on a clear/unambiguous tactical picture. 3. DSSC-5.2 provides phased E-2D Cooperative Engagement Capability (CEC) Signal Data Processor (SDP) processing capacity and cryptographic upgrades required to implement the NIFC capabilities integrated into DSSC-5. CEC utilizes the SDP to encrypt tactical data and control the antenna during transmission of the data. This capability will correct obsolescence deficiencies based on processors, encryption, and capacity and establish the baseline architecture for expanded capability in CEC. The fully integrated E-2D Communication-as-a-Service (CaaS) will enhance CEC improvements to ensure resilient communication paths for tactical information throughout the battlespace. CEC Block II capabilities will ensure continued interoperability with the rest of the carrier strike groups and enable new CEC capabilities necessary to counter expected advances in threat capabilities. Initial integration of CEC Block II capabilities must be conducted on time to maintain interoperability and keep pace with expected threats. 4.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$14.5M
Prior year

Congressional Adds — one RDT&E project inside PE 0604234N. Congressional marks are recorded on the program element, not on a project.

Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $390.3M requested for program element 0604234N.

Funding trajectory

Project 9999 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

014.5FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual14.5
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Project detail

What project 9999 buys

Congressional Add. The E-2D Advanced Hawkeye and associated APY-9 radar meet the requirements specified in the Capabilities Development Document (CDD), including detection ranges, detection velocities, and tracking accuracies, verified through extensive developmental and operational flight testing and deployed operations. Program increase for E-2D advanced radar development to stay ahead of the evolving threat.

R-3 lines of work
  • Product Development
  • Support