R-2A Activity · President's Budget PB2027

V-22 Flight Control System (FCS) Re-Design

FY2027 Request
$41.2M
▲ 28% vs FY2026
HitchAI read

This activity requests $41.2M in FY2027, 17% of project 3090, up 28% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$41.2M
▲ 28% vs FY2026
FY2026 Enacted
$32.1M
▲ 117% vs FY2025
FY2025 Actual
$14.8M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 3090 of PE 0604262N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continues development of hardware and software architecture upgrades to mitigate obsolescence and data throughput constraints to include Flight Control Computer, Cockpit Interface Unit, and Flight Test Interface Panel. Software language upgrade development in the Cross Channel Data Link and Flight Control Computer Operational Flight program from assembly language to a Higher Order Language for future software maintenance efficiency and capability. Continues Nonrecurring engineering to implement critical design review functions, mature box level design and validate all technical requirements in the lab leading up to test readiness review to go to aircraft developmental test. Starting initial aircraft developmental testing first in lab simulations and then on test aircraft. Begins flight controls augmented capability which improves safety and handling of platform by reducing workload in critical places like degraded visual environment/reduced visual landing, aerial refueling, shipboard operations, and inclement weather situations through hardware and software changes.

FY2026 to FY2027 change

V-22 Flight Control System Re-design: Increase in FY 2027 is due to additional funding in support of the development of tactile feedback cues to alert aircrew of performance limits, while enabling override if needed, through redesign of flight controls, FCS software, and the electrical system.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continues development of hardware and software architecture upgrades to mitigate obsolescence and data throughput constraints to include Flight Control Computer, Cockpit Interface Unit, and Flight Test Interface Panel. Software language upgrade development in the Cross Channel Data Link and Flight Control Computer Operational Flight program from assembly language to a Higher Order Language for future software maintenance efficiency and capability. Continues Nonrecurring engineering to implement critical design review functions, mature box level design and validate all technical requirements in the lab leading up to test readiness review to go to aircraft developmental test. Starting initial aircraft developmental testing first in lab simulations and then on test aircraft.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

25014.8FY25ACTUAL32.1FY26ENACTED41.2FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual14.8
FY2026Enacted32.1
FY2027Request41.2

This activity is 17% of project 3090's FY2027 request and 16% of PE 0604262N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

8 activities in project 3090

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

VeCToR$93.9M NEWReVAMP$47.5M NEW
V-22 Flight Control System (FCS) Re-Design — this activity$41.2M ▲ 28%
V-22 Development Support, Test, and Evaluation$35.4M ▼ 2%V-22 Airframe Hardware Development$14.9M ▼ 40%
V-22 Open Systems Architecture/Cyber Security$5.3M ▼ 55%
V-22 Propulsion / Mission Care Hardware Development$2.2M ▲ 4%
V-22 Joint Avionics Reconfigurable Virtual Information System (JARVIS)$0.0M ▼ 100%
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0604262N, project 3090 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.