R-2A Activity · President's Budget PB2027

ReVAMP

FY2027 Request
$47.5M
◆ New start in FY2027
HitchAI read

This activity requests $47.5M in FY2027, 20% of project 3090 — a new start with no prior-year and no current-year money. The R-2A exhibit describes it across FY2027, including what the FY2027 money is planned to buy.

New start

This activity requests $47.5M in FY2027 with no prior-year and no current-year funding. There is no incumbent line to compare it with — it did not exist before this President's Budget.

FY2027 Request
$47.5M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 3090 of PE 0604262N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Develop and implement comprehensive V-22 mid-life upgrade efforts to enhance readiness and safety performance through targeted efforts: 1.Introduce the Integrated Cargo Handling System (ICHS) to increase Joint Modular Intermodal Containers (JMIC) capacity in the MV-22 from quantity three to quantity five. This system significantly reduces the time required to secure JMICs and incorporates roller system improvements to align, load, and position cargo while preventing damage to the aircraft. 2.Install an aerodynamic treatment to the aircraft's Outer Mold Line to reduce exit pressure, improve airflow through the left-hand cavity, and minimize Integrated Avionics Processor (IAP) 1 HOT occurrences. This enhancement ensures proper IAP functionality with existing systems and supports the integration of new systems without introducing additional issues. 3. Incorporate safety and reliability improvements to the Pylon Conversion Actuator (PCA) addressing a 1D, Catastrophic-Remote Risk to the V-22 program for PCA Fails to Convert or Failure to Control Nacelle Angle. This risk was opened in 2024 and QTY 24 PCA in-flight jam events have been recorded to date. Incorporation of the proposed redesigns to the Ballnut and the Worm Gear will reduce the risk to an Improbable, Medium-Risk. 4.Design and implement an EAPS redesign to prevent blower stall during critical flight regimes and allow the system to sufficiently scavenge dust and sand away from the engine inlet. Proper scavenge of air from the engine inlet will improve compressor section erosion timelines and increase time on wing per engine 5.Implementation of Electrical Load Management System (ELMS) to provide additional onboard power for new systems, including the Flight Control System (FCS) upgrade and the MANGL system. ELMS will also inform the crew of overloads and required power shedding, enabling automatic or manual shedding of low-priority loads. Additionally, identify and address key drivers affecting readiness and safety outcomes, while conducting annual reviews of the modernization plan during cross-service program safety risk assessments. Establish full and partial mitigation strategies to resolve or downgrade open and monitored I-D and I-E SSRAs, and implement an integrated process to thoroughly identify, analyze, and mitigate both system safety and non-system safety risks.

FY2026 to FY2027 change

Renewed V-22 Aircraft Modernization Program (ReVAMP): Increase in FY 2027 is due to additional funding provided in support of comprehensive review recommendations to develop and implement V-22 mid-life upgrade efforts and develop an integrated process to fully identify, analyze, and respond to system safety and non-system safety risks.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2500.0FY25ACTUAL0.0FY26ENACTED47.5FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request47.5

This activity is 20% of project 3090's FY2027 request and 19% of PE 0604262N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

8 activities in project 3090

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

VeCToR$93.9M NEW
ReVAMP — this activity$47.5M NEW
V-22 Flight Control System (FCS) Re-Design$41.2M ▲ 28%V-22 Development Support, Test, and Evaluation$35.4M ▼ 2%V-22 Airframe Hardware Development$14.9M ▼ 40%
V-22 Open Systems Architecture/Cyber Security$5.3M ▼ 55%
V-22 Propulsion / Mission Care Hardware Development$2.2M ▲ 4%
V-22 Joint Avionics Reconfigurable Virtual Information System (JARVIS)$0.0M ▼ 100%
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0604262N, project 3090 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.