R-2A Activity · President's Budget PB2027

AEGIS DEVELOPMENT SUPPORT

FY2027 Request
$48.9M
▼ 36% vs FY2026
HitchAI read

This activity requests $48.9M in FY2027, 13% of project 1447, down 36% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$48.9M
▼ 36% vs FY2026
FY2026 Enacted
$76.4M
▲ 13% vs FY2025
FY2025 Actual
$67.7M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 1447 of PE 0604307N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

AEGIS System Engineering: Continue to provide AEGIS System Engineering evaluation of AEGIS Combat System performance and development of the AEGIS Capability Phasing Plan to ensure that warfighter improvements are implemented through future Combat System upgrades to meet emerging threats. These efforts are focused on defining future capability upgrades to the AEGIS Combat System. Conduct System Engineering review for Future Warfighting improvements for AEGIS BL 9 and BL 10 Configurations to evaluate current gaps and external weapon element updates available to address and determine most effective way to complete integration. AEGIS Hardware Engineering: Continue to provide AEGIS COTS Obsolescence mitigation to include evaluation of systems currently delivered as well as those under development. These updates are focused on replacing high failure rate components in addition to monitoring and resolving obsolescence issues for all AEGIS hardware configurations. Hardware configurations include Q-70, TI-12H, MK 6 MOD 0, MK 6 MOD 1, and MK 6 MOD X. As part of COTS Obsolescence, updates TI-12H and MK-6 MOD 0 are required to implement fact of life Operating Environment changes with RHEL 6.5 being no longer supported, updates are required to implement RHEL 8.0 to ensure these hardware configurations can continue to be operated and support future Computer Program installations. AEGIS Land Based Test Sites: Investments to increase/modernize combat systems and facility infrastructure readiness at the Land Based Test and Training Sites (LBTTS) in order to support development and testing milestones. Investments include combat system upgrades, facility combat system infrastructure upgrades, and introduction of new AEGIS Weapon System (AWS) and AEGIS Combat System (ACS) capabilities. Investments will support development baselines (BL) to include BL5, CP 2022, CP 2024, BL 9.C3, BL10.0.1, BL 10.1, and BL 10M. The Land Based Test and Training Sites (LBTTS) include the Naval Surface Computing Center (NSCC), Combat System Engineering Development Site (CSEDS), SPY-1A Test Facility (STF), Surface Combat Systems Center (SCSC), and AEGIS Training and Readiness Center (ATRC). Combat System Test Bed (CSTB): Support the CSTB requirements to develop and maintain models required to support DDG Combat System development and integration efforts to improve the operational effectiveness and ensure future updates are pacing evolving threats. Specific areas of focus on FY27 will include the following milestones and efforts: CSTB Code Delivery #18 Q1 FY27 CSTB Code Delivery #19 Q2 FY27 CSTB Code Delivery #20 Q3 FY27 CSTB BL10.0.1 OT IAMD Run For Record #2 Q1 FY27 Continued Federate development and integration SM-2 BIIIC, SKCS/BAM, SM-3 Blk IB/IIA, SLQ-32(V)6, and Lethality Models. Continued Verification and Validation (V&V) SM-6 BI (AW), SPY-6(V)1, SLQ-32(V)6, SM-3 BI/IIA, ESSM Block 2, SM-3 Blk IB/IIA, CIWS, NULKA decoy, Interactive Threat models, and AAW/BMD Debris model capabilities. Conduct 3 Simulation Control Panel Readiness Reviews Boards and CSTB BL10.0 IT M&S Runs for Record. Integrated tested of BL10.0.1 continues to support ACB 20 NCD requirements. BL10.0.1 is executing the IOT&E campaign and is on track to support Operational Testing Q3FY26. BL10.1 will be executing System Requirement Review in March, followed by capabilities development. This baseline will host BMD/IAMD SBT Inc III capabilities, enhanced lethality and survivability, and sharper threat detection and engagement.

FY2026 to FY2027 change

The FY26 to FY27 decrease is due to the reduction of land-based test site hardware procurement and installation efforts associated with latest hardware procurement baselines required to support continuous integration being completed in FY26.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

AEGIS System Engineering: Continue to provide AEGIS System Engineering evaluation of AEGIS Combat System performance and development of the AEGIS Capability Phasing Plan to ensure that warfighter improvements are implemented through future Combat System upgrades to meet emerging threats. These efforts are focused on defining future capability upgrades to the AEGIS Combat System. Conduct System Engineering review for Future Warfighting improvements for AEGIS BL 9 and BL 10 Configurations to evaluate current gaps and external weapon element updates available to address and determine most effective way to complete integration. AEGIS Hardware Engineering: Continue to provide AEGIS COTS Obsolescence mitigation to include evaluation of systems currently delivered as well as those under development. These updates are focused on replacing high failure rate components in addition to monitoring and resolving obsolescence issues for all AEGIS hardware configurations. Hardware configurations include Q-70, TI-12H, MK 6 MOD 0, MK 6 MOD 1, and MK 6 MOD X. As part of COTS Obsolescence, updates TI-12H and MK-6 MOD 0 are required to implement fact of life Operating Environment changes with RHEL 6.5 being no longer supported, updates are required to implement RHEL 8.0 to ensure these hardware configurations can continue to be operated and support future Computer Program installations. AEGIS Land Based Test Sites: Investments to increase/modernize combat systems and facility infrastructure readiness at the Land Based Test and Training Sites (LBTTS) in order to support development and testing milestones. Investments include combat system upgrades, facility combat system infrastructure upgrades, and introduction of new AEGIS Weapon System (AWS) and AEGIS Combat System (ACS) capabilities. Investments will support development baselines (BL) to include BL5, CP 2022, CP 2024, BL 9.C3, BL10.0.1, BL 10.1, and BL 10M. The Land Based Test and Training Sites (LBTTS) include the Naval Surface Computing Center (NSCC), Combat System Engineering Development Site (CSEDS), SPY-1A Test Facility (STF), Surface Combat Systems Center (SCSC), and AEGIS Training and Readiness Center (ATRC). Combat System Test Bed (CSTB): Support the CSTB requirements to develop and maintain models required to support DDG Combat System development and integration efforts to improve the operational effectiveness and ensure future updates are pacing evolving threats. Specific areas of focus on FY26 will include the following milestones and efforts: CSTB Code Delivery #15 Q1 FY26 CSTB Code Delivery #16 Q2 FY26 CSTB Code Delivery #17 Q3 FY26 CSTB BL10.0.1 OT BMD Run For Record #2 Q4 FY26 CSTB BL10.0.1 OT AW Run For Record #2 Q4 FY26 Continued Federate development and integration SM-2 BIIIC, SKCS/BAM, SM-3 Blk IB/IIA, SLQ-32(V)6, and Lethality Models. Continued Verification and Validation (V&V) SM-6 BI (AW), SPY-6(V)1, SLQ-32(V)6, SM-3 BI/IIA, ESSM Block 2, SM-3 Blk IB/IIA, CIWS, NULKA decoy, Interactive Threat models, and AAW/BMD Debris model capabilities. Conduct 3 Simulation Control Panel Readiness Reviews Boards and CSTB BL10.0 IT M&S Runs for Record. Commence Integrated Testing of BL10.X Federation to support ACB 20 Navy Capabilities Document (NCD) requirements. (1 Additional effort).

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

255075067.7FY25ACTUAL76.4FY26ENACTED48.9FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual67.7
FY2026Enacted76.4
FY2027Request48.9

This activity is 13% of project 1447's FY2027 request and 12% of PE 0604307N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

10 activities in project 1447

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

PAC 3 - MSE Navy$120.6M NEWBL 10 AEGIS FLT IIA & III DESTROYER CONTINUOUS WARFIGHTER IMPROVEMENTS$112.5M ▼ 29%BL 9 DESTROYER CONTINUOUS WARFIGHTING IMPROVEMENTS$91.4M ▲ 10%
AEGIS DEVELOPMENT SUPPORT — this activity$48.9M ▼ 36%
BL 5/7 DESTROYER UPGRADES$3.9M ▼ 19%
AEGIS CAPABILITY PACKAGE 2024$0.0M
COMBAT SYSTEMS TEST BED (CSTB)$0.0M
TASK FORCE CYBER AWAKENING (TFCA)$0.0M
COLLABORATIVE IAMD PLANNING PROGRAM (CIPP)$0.0M
AEGIS DEVELOPMENTAL TESTING / OPERATIONAL TESTING (DT/OT)$0.0M
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0604307N, project 1447 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0604307N/1447/a0.md · MCP mcp.hitchintel.combudget_get_activity