RDT&E Program Element · President's Budget PB2027

New Design SSN

PE 0604558N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$237.1M
⚑ Contested — House approps cuts 1.9%
HitchAI read

U.S. Navy requests $237.1M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators cut 1.9% (to $232.6M). Electric Boat leads the industry work.

FY2027 Request
$237.1M
▼ 7.0% vs FY2026
House approps mark
$232.6M
▼ $4.6M vs request
FY2026 Enacted
$255.0M
In law

Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $237.1M for New Design SSN under RDT&E program element 0604558N, down 7.0% from FY2026. In the FY2027 defense authorization, House approps moved to cut it to $232.6M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

501001502002500264.1FY25ACTUAL255.0FY26ENACTED237.1FY27REQUEST265.4FY28273.6FY29278.5FY30273.5FY31HOUSE APPROPS
Actual Enacted Request Outyear (FYDP) House approps mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual264.1
FY2026Enacted255.0
FY2027Request237.1
FY2028Outyear265.4
FY2029Outyear273.6
FY2030Outyear278.5
FY2031Outyear273.5
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

4 projects roll up into PE 0604558N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -7% overall, which can hide much larger swings below.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$237.1M
House NDAA (HASC)HASC
$237.1M full · +$0
Senate NDAA (SASC)SASC
$237.1M full · +$0
House Approps (HAC-D)HAC_D
$232.6M −$4.6M · −1.9%
▲ $4.6M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Electric Boat
$139.3M · 59%
Component Development · CPFF
Lockheed Martin
$12.3M · 5.2%
Tech Insertion/Advanced Processing Build (TI/APB) Integration
Where FY2027 funding flowsShare$M
Industry primes69%162.6
Government labs & warfare centers25%58.9
Other / unspecified6.6%15.6
FY2027 request100%237.1
See Electric Boat's full federal contract ledger members
Program detail

Mission & acquisition strategy

FY 2027 funding provides for the continued execution of Virginia Class Submarine Undersea Dominance Payload Integration (UDPI) (i.e., Advanced Payloads), Advanced Acoustic Sensors, and future Blocks concept designs. FY 2027 continues the detailed design of Virginia Class Block VI technical baseline established efforts, preliminary design for Virginia Class Block VII, and initial concept design studies for Block VIII. Funds will be executed at the Virginia Class design yard and numerous sub-vendors and warfare centers designing and developing critical, complex ship components necessary for integrating advanced Block VI capabilities into the baseline class design. The U.S.

The VIRGINIA Class Submarine Program has implemented Integrated Product and Process Development (IPPD). The traditional distinct phasing of the design process has been replaced with the continuous concurrent engineering IPPD process. The IPPD approach has facilitated a smoother transition from design to manufacturing and has reduced the number of changes typically encountered during construction of the lead and early follow-on ships. The Program Office is currently managing two Multi-Year Procurement (MYP) contracts. The first is for the Block IV (FY14-18) ships awarded April 2014. The second is for the Block V (FY19-23) ships, which incorporate Acoustic Superiority (AS) modifications and Virginia Payload Module (VPM).

Project 1947, 1950, 3062, 9999 — New Design SSN HM&E
  • Product Development
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House approps do to this request, and what is still unresolved?Which project inside PE 0604558N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Electric Boat has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604558N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "New Design SSN (PE 0604558N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604558N
Machine access
Markdown twin /programs/0604558N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$187.3M
▼ 6.9% vs FY2026
FY2026 Enacted
$201.1M
▼ 6.1% vs FY2025
FY2025 Actual
$214.2M
Prior year

New Design SSN HM&E — one RDT&E project inside PE 0604558N. Congressional marks are recorded on the program element, not on a project.

Project 1947 — New Design SSN HM&E — requests $187.3M in FY2027, 79% of the $237.1M requested for program element 0604558N. Year over year it falls 6.9% against FY2026.

Funding trajectory

Project 1947 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

501001502000214.2FY25ACTUAL201.1FY26ENACTED187.3FY27REQUEST215.6FY28222.8FY29227.0FY30221.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual214.2
FY2026Enacted201.1
FY2027Request187.3
FY2028Outyear215.6
FY2029Outyear222.8
FY2030Outyear227.0
FY2031Outyear221.2
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$202.2M
FY2026 enacted$187.7M
FY2027 request$164.8M

-Continue Virginia Class Submarine Undersea Dominance Payload Integration (UDPI) design efforts to modify the current host ship systems in support of launching payloads from multiple different hull/ocean interfaces. -Continue development of Hull, Mechanical & Electrical (HM&E) systems concepts technologies, including obsolescence…

Read the FY2027 plan →
FY2025 actual$12.0M
FY2026 enacted$13.4M
FY2027 request$22.5M

-Continue work associated with previous test events (IOT&E, Arctic, Dry-Deck Shelter, Block III FOT&E). This consists of documenting and testing fixes to deficiencies identified during previously completed Developmental and Operational Testing as well as addressing recommendations noted by the Oversight Community from OSW. -Continue…

Read the FY2027 plan →
Project 1947 — every activity in full →
Who's building it

Named performers on project 1947

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Electric Boat
$137.5M · 73%
Progeny Applied
$6.6M · 3.5%
COMOPTEVFOR
$1.2M · 0.6%
Miscellaneous
$0.8M · 0.4%
Project detail

What project 1947 buys

FY 2027 efforts in Proj 1947 are associated with Virginia Class Block VII studies, trade-space definition, and long-term development beginning in parallel to Block V/VI design efforts. FY 2027 funding provides for the continued execution of Virginia Class Submarine Undersea Dominance Payload Integration (UDPI) (i.e., Advanced Payloads), Advanced Acoustic Sensors, and future blocks concept designs. FY 2027 continues the detailed design of Virginia Class Block VI technical baseline established efforts, preliminary design for Virginia Class Block VII, and initial concept design studies for Block VIII. Funds will be executed at the Virginia Class design yard and numerous sub-vendors and warfare centers designing and developing critical, complex ship components necessary for integrating Block VI capabilities into the baseline class design. This project encompasses all the ship system development efforts for the Virginia Class Submarine and the Technology Insertion Program for reducing costs and upgrading performance of future hulls by virtue of improvements in ship design and systems. Technology development implementation and logistics for developmental items, and Virginia Class test & evaluation are included. The thrust of these efforts will be to develop and apply multiple advanced system technologies which are integrated into the design of the Virginia Class Submarine. Technologies developed in this program will be considered for applicability to the COLUMBIA (CLB) Class Submarine Program for commonality opportunities. New technologies are being transitioned from industry and government research and development programs where doing so offers substantial performance improvement and/or affordability payoffs. Transition opportunities include those from the Defense Advanced Research Projects Agency (DARPA) and Office of Naval Research (ONR) Future Naval Capabilities Program.

R-3 lines of work
  • Product Development
  • Test and Evaluation
FY2027 Request
$39.3M
▲ 3.7% vs FY2026
FY2026 Enacted
$37.9M
▼ 8.7% vs FY2025
FY2025 Actual
$41.6M
Prior year

New Design SSN Combat Sys Dev — one RDT&E project inside PE 0604558N. Congressional marks are recorded on the program element, not on a project.

Project 1950 — New Design SSN Combat Sys Dev — requests $39.3M in FY2027, 17% of the $237.1M requested for program element 0604558N. Year over year it grows 3.7% against FY2026.

Funding trajectory

Project 1950 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25041.6FY25ACTUAL37.9FY26ENACTED39.3FY27REQUEST39.1FY2838.8FY2939.4FY3040.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual41.6
FY2026Enacted37.9
FY2027Request39.3
FY2028Outyear39.1
FY2029Outyear38.8
FY2030Outyear39.4
FY2031Outyear40.1
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$24.3M
FY2026 enacted$22.7M
FY2027 request$22.4M

-Continue design and component selection for the TI-28 S/CC/A configuration. -Complete land based integration testing at the System of Systems level for the emerging new architecture employing a common computing environment and Platform As A Service (PaaS) architecture. -Continue NPES level test and evaluation of cyber hardening measures…

Read the FY2027 plan →
FY2025 actual$17.3M
FY2026 enacted$15.3M
FY2027 request$16.9M

-Continue SSN 812 Subsea Seabed Warfare platform unique NPES integration and test plans. -Continue development of NPES-wide Government Furnished Information (GFI) required by the shipbuilder to make platform compatible changes to the power, cooling, and cabling systems for the TI-28 configuration. -Complete trade studies to evaluate…

Read the FY2027 plan →
Project 1950 — every activity in full →
Who's building it

Named performers on project 1950

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$12.3M · 31%
Electric Boat
$1.8M · 4.5%
SSC
$1.3M · 3.2%
Project detail

What project 1950 buys

This project provides the engineering development required to outfit each ship of the Virginia Class Submarine with a combat system which satisfies ORD requirements in all 7 mission areas, namely; ASW, STRIKE, ISR, Covert Mine Warfare, Battle Group Support, ASUW, and Special Warfare. The fully integrated combat system, otherwise referred to as the Non-Propulsion Electronics System (NPES), is composed of a collection of functional sub-systems, such as sonar, navigation, exterior communications, weapons launch, Large Vertical Array, Submarine Warfare Federated Tactical System (SWFTS) virtualization, Electronic Warfare Next Generation Architecture, etc., which evolve over the life of the program due to either competitive selection of new suppliers, component obsolescence replacement, increased technical performance, or improvements in reliability. Non-recurring engineering activity is needed to perform platform integration of the components, software modification to accommodate electronic data exchange, unique submarine environment qualification and update of all logistics products.

R-3 lines of work
  • Product Development
FY2027 Request
$10.5M
▲ 26% vs FY2026
FY2026 Enacted
$8.3M
▼ 0.1% vs FY2025
FY2025 Actual
$8.3M
Prior year

Submarine Multi-Mission Team Trainer — one RDT&E project inside PE 0604558N. Congressional marks are recorded on the program element, not on a project.

Project 3062 — Submarine Multi-Mission Team Trainer — requests $10.5M in FY2027, 4.4% of the $237.1M requested for program element 0604558N. Year over year it grows 26% against FY2026.

Funding trajectory

Project 3062 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

08.3FY25ACTUAL8.3FY26ENACTED10.5FY27REQUEST10.7FY2812.0FY2912.1FY3012.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual8.3
FY2026Enacted8.3
FY2027Request10.5
FY2028Outyear10.7
FY2029Outyear12.0
FY2030Outyear12.1
FY2031Outyear12.3
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$8.3M
FY2026 enacted$8.3M
FY2027 request$10.5M

Develop implementation of latest Advanced Processor Build (APB), Technical Insertion (TI) and associated training displays. These efforts include visualization of new sensor developments and simulations to match advancements in tactical systems supported by SMMTT. The SMMTT baseline includes integration of WSQ-9, Low Cost Conformal Array…

Read the FY2027 plan →
Project 3062 — every activity in full →
Project detail

What project 3062 buys

To achieve desired submarine force readiness levels, it is necessary to construct highly sophisticated shore based Combat System Team Trainers capable of training personnel in all aspects of submarine approach, attack and surveillance operations in a controlled, simulated environment. The Combat Control System (CCS) AN/BYG-1 and sonar system AN/BQQ-10 are installed on SSN, SSBN and SSGN class submarines. These tactical systems are planned for future upgrades with the next hardware and software revisions which will provide enhanced War Fighter capabilities. The Tactical Acoustic Rapid COTS (commercial-off-the-shelf) Insertion (ARCI) phased upgrades are also being installed with future revisions. The Advanced Processing Builds (APB) and Technical Insertion (TI) sensors, which feed technology insertion into the CCS/Acoustic development, directly impact the trainers. The Submarine Multi-Mission Team Trainer (SMMTT) supports operator, employment, strike, and Battle Group training for enlisted and officer pipelines. The SMMTT provides operators and combat teams the opportunity to train ashore, prior to, and between deployments. The shore based training provides a means of maintaining team proficiency in stand alone or in combined team mode prior to ship deployment.

R-3 lines of work
  • Product Development
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$7.7M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Congressional Adds — one RDT&E project inside PE 0604558N. Congressional marks are recorded on the program element, not on a project.

Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $237.1M requested for program element 0604558N. Year over year it falls 100% against FY2026.

Funding trajectory

Project 9999 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL7.7FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted7.7
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Project detail

What project 9999 buys

This FY 2026 RDT&E Congressional add supports Secure Mobile Initial Outfitting and Portable Underwater Communication Systems (PUCS) for VIRGINIA Class Submarines. Secure Mobile Initial Outfitting provides secure modern mobile devices as well as mobile applications to improve the enhance sailor shipboard effectiveness. This FY 2026 funding will accelerate the initial mobile shipset outfitting of submarines and their sailors to enhance their efficiency. FY 2026 funds will also support the completion of development, test and evaluation and production of PUCS with the goal of providing a system that will increase tactical readiness and communication in tactically significant environments.

R-3 lines of work
  • Product Development