RDT&E Program Element · President's Budget PB2027

Strategic Mid-Range Capability

PE 0605235A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$82.6M
◆ Development crest → decline
HitchAI read

U.S. Army funding falls 55% to a $82.6M request in FY2027 (down from a FY2026 peak), before stepping down 77% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. Lockheed Martin leads the industry work.

FY2027 Request
$82.6M
▼ 55% vs FY2026
FY2026 Enacted
$182.1M
▲ 3.4% vs FY2025
FY2025 Actual
$176.2M
Prior year

For fiscal year 2027, the U.S. Army is requesting $82.6M for Strategic Mid-Range Capability under RDT&E program element 0605235A, down 55% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

501001500176.2FY25ACTUAL182.1FY26ENACTED82.6FY27REQUEST80.3FY2846.4FY2918.3FY3018.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual176.2
FY2026Enacted182.1
FY2027Request82.6
FY2028Outyear80.3
FY2029Outyear46.4
FY2030Outyear18.3
FY2031Outyear18.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0605235A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -55% overall, which can hide much larger swings below.

Project CQ4

Mid-Range Capability

$82.6MFY2027 request ▼ 55%
FY2025 actual$176.2M
FY2026 enacted$182.1M
FY2027 request$82.6M
Management ServicesProduct DevelopmentSupportTest and Evaluation

This funding line is directly aligned to the Army Long-Range Precision Fires modernization priority. The Mid-Range Capability (MRC) weapon system leverages other service technologies and integration of common hardware, software, and mutually supporting test events. The MRC is a ground launched, long-range precision fires?offensive weapon system to defeat Anti-Access/Area-Denial (A2/AD) threats and other high value targets to enable?warfighter dominance in support of Long-Range Precision Fires, Multi-Domain Operations, and Joint Force objectives. MRC provides ground support equipment to include a Battery Operations Center (BOC) with support vehicles, launcher Payload Deployment System, and reload support to fire a mix of missiles capable of engaging strategic targets at mid-range distances. MRC leverages existing Standard Missile-6 (SM-6) and Tomahawk technology to include command and control systems and missile variants to provide a responsive, highly accurate capability designed for high value targets. The first MRC prototype weapon system battery, delivered in FY 2023 as the first unit of issue, provided residual combat capability consisting of one BOC with support vehicles, four launchers, and a reload capability. Also delivered was the basic load of missiles consisting of eight Tomahawk Block V and eight SM-6 Block IA. Follow-on annual delivery of the next three batteries (Battery 2 through 4) utilizes RDT&E under a Middle Tier of Acquisition Rapid Prototyping pathway. Battery 2 was delivered in 4Q2024, Battery 3 was delivered in 4Q2025, and Battery 4's anticipated delivery date from contractor is 4Q2026. The Army is developing a BOC with a reduced footprint (RBF) to support greater battlefield maneuverability and survivability. The RBF will feature a smaller form factor to enhance mobility, transportability, and interoperability with other system components aligned to mission requirements. This effort includes design, integration, Common Autonomous Multi-Domain Launcher (CAML) integration, and testing activities to ensure the RBF meets established system objectives and maintains operational effectiveness. The RBF will be incorporated into MRC system with the fielding of Battery 4. FY 2027 funding in the amount of $81.550 million continues all aspects of developing MRC technology upgrades.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$176.2M
FY2026 enacted$182.1M
FY2027 request$82.6M

FY 2027 funding of $82.550 million continues all aspects of MRC technology upgrade development. This funding supports prototype systems through iterative improvements in survivability, reliability, and operational effectiveness based on evolving system requirements. Funding allows for continued development of system improvements…

Read the FY2027 plan →
Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$82.6M
House NDAA (HASC)HASC
$82.6M full · +$0
Senate NDAA (SASC)SASC
$82.6M full · +$0
House Approps (HAC-D)HAC_D
$82.6M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Lockheed Martin
$30.6M · 37%
Original Equipment Manufacturer · CPFF
Where FY2027 funding flowsShare$M
Industry primes37%30.6
Other / unspecified63%52.0
FY2027 request100%82.6
See Lockheed Martin's full federal contract ledger members
Program detail

Mission & acquisition strategy

This funding line is directly aligned to the Army Long-Range Precision Fires modernization priority. The Mid-Range Capability (MRC) weapon system leverages other service technologies and integration of common hardware, software, and mutually supporting test events. The MRC is a ground launched, long-range precision fires?offensive weapon system to defeat Anti-Access/Area-Denial (A2/AD) threats and other high value targets to enable?warfighter dominance in support of Long-Range Precision Fires, Multi-Domain Operations, and Joint Force objectives.

The first MRC battery was delivered in FY 2023, consisting of one BOC with support vehicles, four launchers, and a reload capability. The initial delivery also included the first eight Tomahawk and eight Standard Missile-6 (SM-6) missiles for operational use. Development, delivery, and fielding of the remaining three MRC batteries is ongoing. Battery 2 was delivered in 4Q2024, Battery 3 was delivered in 4Q2025, and Battery 4's anticipated delivery date from contractor is 4Q2026 under the Middle Tier of Acquisition Rapid Prototyping (MTA RP) Acquisition pathway. MRC is currently pursuing an extension to the existing MTA RP with an updated Acquisition Decision Memorandum.

Project CQ4 — Mid-Range Capability
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605235A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Strategic Mid-Range Capability (PE 0605235A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605235A
Machine access
Markdown twin /programs/0605235A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks