RDT&E Program Element · President's Budget PB2027

Radar SLEP

PE 1203909SF·U.S. Space Force·Approp. 3620F — RDT&E·BA7 — Operational System Development
FY2027 Request
$128.6M
Space Force · RDT&E
◆ New start in FY2027 — no prior-year funding
HitchAI read

U.S. Space Force requests $128.6M in FY2027 against nothing enacted in FY2026. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full.

FY2027 Request
$128.6M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

For fiscal year 2027, the U.S. Space Force is requesting $128.6M for Radar SLEP under RDT&E program element 1203909SF, against nothing enacted in FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

5010015020025000.0FY25ACTUAL0.0FY26ENACTED128.6FY27REQUEST253.4FY28193.5FY29102.8FY30104.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request128.6
FY2028Outyear253.4
FY2029Outyear193.5
FY2030Outyear102.8
FY2031Outyear104.8
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 1203909SF

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.

Project 677825

Radar SLEP

$128.6MFY2027 request NEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$128.6M
Product DevelopmentTest and EvaluationManagement Services

This is not a new start. FY 2026 mandatory (reconciliation) funding established this program. This program element (PE 1203909SF) modernizes existing Ground Based Radars (GBR), which includes five Upgraded Early Warning Radars (UEWR), one Perimeter Acquisition Radar Characterization System (PARCS), Cobra Dane (AN/FPS-108) and the AN/FPS-85 Phased Array Radar (Eglin). The Upgraded Early Warning Radars (UEWR) are a critical component of the United States' missile defense strategy. These systems currently have a mixture of three missions (Missile Warning/Missile Track (MW/MT), Missile Defense (MD), and Space Domain Awareness (SDA)) involving two activities. The first mission MW/MT, provides early warning and attack assessment of Ballistic Missile attack, enables accurate, timely, continuous, unambiguous Integrated Tactical Warning/Attack Assessment (ITW/AA) to correlation centers for combatant command integrated C2. The second mission is MD, performing Ballistic Missile midcourse detection, acquisition, tracking and classification. The third mission is the SDA Mission, detecting, identifying, and tracking man-made objects in earth orbit. The USSF, jointly with Missile Defense Agency (MDA), is modernizing eight (8) critical GBRs, including five UEWRs, PARCS, COBRA DANE, and Eglin AFB Site C-6 Radar through the Ground-Based Radar Digitization (GBRD) Program. GBRD will digitize these radars for enhanced battlespace awareness, reduced sustainment costs, and resolution of sustainment challenges. These aging systems are nearing obsolescence, necessitating technological upgrades to meet the modern requirement and threat. GBRD will modernize the entirety of the radar system from behind the physical antennas to the communications out. Space Domain Awareness (SDA) is one of five core competencies of the Space Force and includes the effective identification, characterization, and understanding of any factor, passive or active, associated with the space domain that could affect space operations and thereby impact the security, safety, economy, or environment of our nation.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$128.6M

Complete Preliminary Design Review and begin work on Critical Design review. Purchase long lead hardware and begin prototyping and hardware test efforts. In addition, work will begin on the software and firmware for the hardware design that is chosen and being matured. Rapidly respond to implement system resiliency and situational…

Read the FY2027 plan →
Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$128.6M
House NDAA (HASC)HASC
$128.6M full · +$0
Senate NDAA (SASC)SASC
$128.6M full · +$0
House Approps (HAC-D)HAC_D
$128.6M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Other / unspecified100%128.6
FY2027 request100%128.6
Program detail

Mission & acquisition strategy

This is not a new start. FY 2026 mandatory (reconciliation) funding established this program. This program element (PE 1203909SF) modernizes existing Ground Based Radars (GBR), which includes five Upgraded Early Warning Radars (UEWR), one Perimeter Acquisition Radar Characterization System (PARCS), Cobra Dane (AN/FPS-108) and the AN/FPS-85 Phased Array Radar (Eglin). The Upgraded Early Warning Radars (UEWR) are a critical component of the United States' missile defense strategy. These systems currently have a mixture of three missions (Missile Warning/Missile Track (MW/MT), Missile Defense (MD), and Space Domain Awareness (SDA)) involving two activities.

Using a Middle Tier Acquisition (MTA), in accordance with DoDI 5000.80, Rapid Prototyping (RP) acquisition pathway approach, GBRD will create a common baseline for all eight (8) GBRs, and first prototype solutions at four sites before proceeding with Rapid Fielding production for the remaining GBR sites. This strategy enables agile development and rapid deployment of modernized capabilities. This modernization improves radar weapon system effectiveness and efficiency through increased commonality, sustainable support, and optimized human interaction, including a digital ecosystem, modular design, and a common baseline. The GBRD program will utilize a Fixed Price OTA to execute a gated award process.

Project 677825 — Radar SLEP
  • Product Development
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 1203909SF (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Radar SLEP (PE 1203909SF)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/1203909SF
Machine access
Markdown twin /programs/1203909SF.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks