Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $488.4M for C2 Applications under RDT&E program element 0605331A, against nothing enacted in FY2026. In the FY2027 defense authorization, House approps moved to cut it to $400.3M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 488.4 |
| FY2028 | Outyear | 600.5 |
| FY2029 | Outyear | 653.9 |
| FY2030 | Outyear | 772.6 |
| FY2031 | Outyear | 789.3 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
2 projects roll up into PE 0605331A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.
COMMON C2 APPLICATIONS
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Other / unspecified | 100% | 488.4 |
| FY2027 request | 100% | 488.4 |
Mission & acquisition strategy
Army's Next Generation Command and Control (NGC2) is the Army's highest Command and Control (C2) modernization priority and will enhance the ability to conduct multi-domain operations by integrating advanced technologies, improving interoperability, and increasing the speed and accuracy of decision-making processes. This funding line supports the Command and Control (C2) Application Layer within the NGC2 ecosystem. A fully integrated C2 Application Layer is essential for maintaining operational superiority in a complex battlefield environment.
The Next Generation Command and Control (NGC2) Software Acquisition Pathway (SWP) program continued in the Planning Phase during FY26. The program consists of Data and Applications Layer efforts to define, develop, test and refine software solutions that support the overall NGC2 capability. Experimentation with 4th and 25th Infantry Divisions, using industry-leading solutions, will provide insights to inform a transition into two Execution Phase SWP programs, one for the Data Layer and one for the Applications Layer to deliver NGC2 data and applications capabilities to the Warfighter.
- Product Development
- Support
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0605331A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksWARFIGHTER C2 APPLICATIONS — one RDT&E project inside PE 0605331A. Congressional marks are recorded on the program element, not on a project.
Project C2D — WARFIGHTER C2 APPLICATIONS — requests $482.4M in FY2027, 99% of the $488.4M requested for program element 0605331A. It is a new start — no prior-year or current-year money.
Project C2D funding, FY2027–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2027 | Request | 482.4 |
| FY2028 | Outyear | 594.3 |
| FY2029 | Outyear | 647.5 |
| FY2030 | Outyear | 766.0 |
| FY2031 | Outyear | 782.7 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
FY 2027 C2D Continuous Integration and Continuous Delivery (CI/CD) funding will support the procurement, customization, prototyping, integration, and deployment of critical Warfighter C2 applications, leveraging lessons learned from unit engagement. Funds will also enable product teams to perform application onboarding and deployment…
Read the FY2027 plan →FY 2027 C2D Training funds will invest in creating comprehensive digital learning curriculum for Warfighting C2 Applications.
FY 2027 C2D Test and Evaluation funding will support continuous verification and validation processes required to achieve required certifications, validate application functionality and interoperability with existing systems, integration into the NGC2 ecosystem, and performance under various operational conditions.
What project C2D buys
This funding supports the Army's Next Generation Command and Control (NGC2) initiative to modernize the Command and Control (C2) systems, Application Layer. Project C2D / WARFIGHTER C2 APPLICATIONS is established in Fiscal Year (FY) 2027 as part of a new funding structure for the NGC2 investment in modernization of Army C2 systems. This project represents a funding line consolidation and structure change for the NGC2 Application Layer and does not constitute a new start program or effort. Funding for NGC2 Application Layer activities was provided in FY 2026 under PE 0604818A Project EK9 / Tactical Network Operations and Management, and PE 0604818A Project DL8 / Predictive Logistics, which are realigned under this PE beginning in FY 2027. WARFIGHTER C2 APPLICATIONS delivers a new generation of agile applications focused on enhancing synchronization and effectiveness across the six core warfighting functions (WfF) (Command and Control, Movement and Maneuver, Intelligence, Fires, Protection, and Sustainment) for the C2 Application Layer of the NGC2 ecosystem. These specialized tools are designed to seamlessly interoperate with Common C2 Applications, drawing from and contributing to the single, unified C2 Data Layer. Built to be inherently modular, scalable, and secure, Warfighter C2 Applications break down traditional warfighting silos and ensure operational resilience in Denied, Degraded, Intermittent, or Limited (DDIL) environments. By leveraging a CI/CD pipeline, Project C2D dramatically accelerates the deployment of Warfighter C2 capabilities from prototype to the warfighter. The result is a cohesive operational environment that provides commanders with shared situational awareness, enabling the swift, informed decisions necessary to achieve and maintain battlefield superiority. FY 2027 funding supports the customization, prototyping, integration, and deployment of Warfighting C2 Applications into the C2 Application Layer of the NGC2 ecosystem. It includes a robust CI/CD pipeline, testing and evaluation, and training.
- Product Development
- Support
- Test and Evaluation
COMMON C2 APPLICATIONS — one RDT&E project inside PE 0605331A. Congressional marks are recorded on the program element, not on a project.
Project C2C — COMMON C2 APPLICATIONS — requests $6.0M in FY2027, 1.2% of the $488.4M requested for program element 0605331A. It is a new start — no prior-year or current-year money.
Project C2C funding, FY2027–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2027 | Request | 6.0 |
| FY2028 | Outyear | 6.3 |
| FY2029 | Outyear | 6.5 |
| FY2030 | Outyear | 6.5 |
| FY2031 | Outyear | 6.6 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work FY 2027 C2C Continuous Integration/Continuous Delivery (CI/CD) funding will support the customization, prototyping, integration, and deployment of critical C2C Applications, leveraging lessons learned from user engagement. Funds will also enable product teams to perform application onboarding and deployment activities, provide cloud/sandbox environments, and provide technical and administrative support.
FY2026 to FY2027 change FY 2027 increase due to project established under a new funding structure to support NGC2 Application Layer efforts.
FY2027 planned work FY 2027 C2C Test and Evaluation funding will support continuous verification and validation processes required to achieve required certifications, validate application functionality and interoperability with existing systems, integration into the NGC2 ecosystem, and performance under various operational conditions.
FY2026 to FY2027 change FY 2027 increase due to project established under a new funding structure to support NGC2 Application Layer efforts.
FY2027 planned work FY 2027 C2C Training funds will invest in creating comprehensive digital learning curriculum for Common C2 Applications.
FY2026 to FY2027 change FY 2027 increase due to project established under a new funding structure to support NGC2 Application Layer efforts.
What project C2C buys
This funding supports the Army's Next Generation Command and Control (NGC2) initiative to modernize the Command and Control (C2) systems, Applications Layer. Project C2C / COMMON C2 APPLICATIONS is established in Fiscal Year (FY) 2027 as part of a new funding structure for the NGC2 investment in modernization of Army C2 systems. This project represents a funding line consolidation and structure change for the NGC2 Application Layer and does not constitute a new start program or effort. Funding for NGC2 Application Layer activities was provided in FY 2026 under PE 0604541A Project BT3 / Common Operating Environment (COE), which is realigned under this PE beginning in FY 2027. COMMON C2 APPLICATIONS delivers a suite of common applications (i.e., Clock, Map, Weather and Compass) and a globally accessible storefront for the C2 Application Layer of the NGC2 ecosystem, drawing from and contributing to the single, unified C2 Data Layer. This initiative ensures every soldier accesses the same consistent, real-time information, which feeds directly into essential warfighting applications. The result is enhanced interoperability and a reliable operational picture for commanders, enabling faster and more effective decision-making. To ensure universal access, the storefront allows soldiers to find and download approved Common and Warfighter C2 Applications to their operational devices, much like a commercial app store. By employing a CI/CD pipeline, the project rapidly develops and integrates these tools, replacing numerous, disparate systems into a suite of common applications. FY 2027 funding supports the customization, prototyping, integration, and deployment of Common C2 Applications and a globally accessible storefront into the C2 Application Layer of the NGC2 ecosystem. It includes a robust CI/CD pipeline, testing and evaluation, and training.
- Product Development
- Support
- Test and Evaluation