RDT&E Program Element · President's Budget PB2027

Materiel Systems Analysis

PE 0605706A·U.S. Army·Approp. 2040 — RDT&E·BA6 — RDT&E Management Support
FY2027 Request
$19.0M
Army · RDT&E
HitchAI read

U.S. Army requests $19.0M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full.

FY2027 Request
$19.0M
▼ 0.5% vs FY2026
FY2026 Enacted
$19.1M
▼ 18% vs FY2025
FY2025 Actual
$23.3M
Prior year

For fiscal year 2027, the U.S. Army is requesting $19.0M for Materiel Systems Analysis under RDT&E program element 0605706A, down 0.5% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

023.3FY25ACTUAL19.1FY26ENACTED19.0FY27REQUEST19.1FY2819.1FY2919.3FY3019.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual23.3
FY2026Enacted19.1
FY2027Request19.0
FY2028Outyear19.1
FY2029Outyear19.1
FY2030Outyear19.3
FY2031Outyear19.5
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 6 — RDT&E Management Support.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0605706A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 0% overall, which can hide much larger swings below.

Project 541

Materiel Sys Analysis

$19.0MFY2027 request flat
FY2025 actual$23.3M
FY2026 enacted$19.1M
FY2027 request$19.0M

This project resources integrated materiel performance analyses to support Army decisions in technology, materiel acquisition, and the design, development, fielding and sustainment of Army systems. The analysis products funded by this project are leveraged to support materiel acquisition decisions and influence the design, development, and sustainment of Army weapon/materiel systems in support of the current and future force in the areas of aviation, ground vehicle and protection technologies, command and control (C2), autonomy, unmanned aerial systems (UAS) and counter UAS, ammunition, fires, assured positioning, navigation and timing (A-PNT), sustainment and other Army priorities. This project provides integrated materiel performance analysis, to Army and Department of War (DoW) decision makers throughout the entire acquisition process in responding to analytical requirements across the full spectrum of materiel. The unique in-house, consistent, integrated analytical capabilities provide Army leadership with timely, independent, unbiased, reliable, and high quality analysis to support complex decisions required for current operations and the development of the future force. The integrated set of analytical skills, tools and data repository are focused on the highest Army priorities with a core mission to build the body of evidence and deliver objective analysis and experimentation across the entire life cycle to ensure Readiness today and a more lethal future force tomorrow. This project develops and certifies system level, and systems-of-systems level, performance and effectiveness data across a broad range of capabilities such as target acquisition, probability of inflicting catastrophic damage, personnel and vehicle survivability, mobility, network, system reliability, and several additional capability areas used in Army studies. The project funds the development of item-level performance methodology, and models and simulations (M&S) for the current and future operational environments and emerging threats. The M&S capabilities support the development, linkage and accreditation of live, virtual, and constructive simulations, and provide unique tools that support systems analysis of individual systems and the combined arms environment.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$23.3M
FY2026 enacted$19.1M
FY2027 request$19.0M

Will maintain and develop advanced methodologies, tools and M&S to execute integrated systems-level analysis in critical performance areas of weapon system lethality, cyber resilience, vulnerability to EW threats, Soldier lethality and survivability, human systems integration (HSI), sustainment, and system performance (e.g., mobility)…

Read the FY2027 plan →
Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$19.0M
House NDAA (HASC)HASC
$19.0M full · +$0
Senate NDAA (SASC)SASC
$19.0M full · +$0
House Approps (HAC-D)HAC_D
$19.0M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

This Program Element (PE) resources the U.S. Army Futures and Concepts Command (FCC) Transformation Decision Analysis Center (TDAC) to conduct integrated materiel performance analyses to support Army decisions in technology, materiel acquisition, and the design, development, fielding and sustainment of Army materiel systems. The analysis products funded by this PE are leveraged to support acquisition decisions and influence the design, development, and sustainment of Army weapon/materiel systems in support of the current and future force in Portfolio Acquisition Executive (PAE) areas of Fires, Command and Control (C2) and counter-C2, Maneuver Gound, Maneuver Air, Agile Sustainment &…

Project 541 — Materiel Sys Analysis
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605706A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Materiel Systems Analysis (PE 0605706A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605706A
Machine access
Markdown twin /programs/0605706A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks