Roll-up of 6 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Air Force is requesting $1.21B for Acq Workforce- Capability Integration under RDT&E program element 0605831F, up 4.6% over FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 305.4 |
| FY2026 | Enacted | 1,153.2 |
| FY2027 | Request | 1,206.7 |
| FY2028 | Outyear | 1,233.3 |
| FY2029 | Outyear | 1,263.4 |
| FY2030 | Outyear | 1,290.2 |
| FY2031 | Outyear | 1,315.6 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 6 — RDT&E Management Support.
6 projects roll up into PE 0605831F
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 5% overall, which can hide much larger swings below.
Acq Workforce-Global Vig & Combat Sys
acq workforce-global power
Acq Workforce-Global Reach
Acq Workfoce-Advanced Prgm Technology
Acq Workforce - Direct
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Mission & acquisition strategy
The Air Force Life Cycle Management Center (AFLCMC) equips U.S. and allied forces with operational weapon systems in support of military and national security operations. The acquisition and product support workforce provides cutting edge weapon systems, sustainment capabilities, and is charged with providing management, tools, and technical and business capabilities needed to oversee acquisition programs throughout their life cycle.
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0605831F.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksAcq Workforce - Capability Integration — one RDT&E project inside PE 0605831F. Congressional marks are recorded on the program element, not on a project.
Project 665831 — Acq Workforce - Capability Integration — requests $352.7M in FY2027, 29% of the $1.21B requested for program element 0605831F. Year over year it grows 26% against FY2026.
Project 665831 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 305.4 |
| FY2026 | Enacted | 280.7 |
| FY2027 | Request | 352.7 |
| FY2028 | Outyear | 363.4 |
| FY2029 | Outyear | 373.7 |
| FY2030 | Outyear | 382.0 |
| FY2031 | Outyear | 389.1 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
The $70.703 million increase from FY26 to FY27 is a combination of the following: Increased funding for updated average work year costs and an increase for workforce optimization. The funding supports 1,820 full-time equivalents.
The $1.313 million increase from FY26 to FY27 is due to inflation.
What project 665831 buys
This Project funds the AFLCMC civilian workforce in cross-cutting and mission support organizations such as Plans & Programs, Engineering, Contracting, Financial Management, Logistics, Program Management, Intelligence, Information Protection, Safety, Personnel, Small Business, Inspector General, and Staff Judge Advocate. The Air Force Life Cycle Management Center (AFLCMC) equips U.S. and allied forces with operational weapon systems in support of military and national security operations. The acquisition and product support workforce provides cutting edge weapon systems, sustainment capabilities, and is charged with providing management, tools, and technical and business capabilities needed to oversee acquisition programs throughout their life cycle. The direct funded acquisition workforce funded in this program element will support all phases of acquisition programs to include material solution analysis, technology development, engineering and manufacturing development, production and deployment, and operations and support. This funding does not include costs for base operating support civilian personnel. These program elements support both civilian pay and non-pay support requirements.
Acq Workforce-Global Vig & Combat Sys — one RDT&E project inside PE 0605831F. Congressional marks are recorded on the program element, not on a project.
Project 665827 — Acq Workforce-Global Vig & Combat Sys — requests $322.6M in FY2027, 27% of the $1.21B requested for program element 0605831F. Year over year it grows 1.1% against FY2026.
Project 665827 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 319.0 |
| FY2027 | Request | 322.6 |
| FY2028 | Outyear | 329.3 |
| FY2029 | Outyear | 336.3 |
| FY2030 | Outyear | 343.1 |
| FY2031 | Outyear | 347.7 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
The $3.622 million increase from FY26 to FY27 is due to increased funding for updated average work year costs. The funding supports 1,819 full-time equivalents.
What project 665827 buys
This Project funds the Air Force Life Cycle Management Center (AFLCMC) civilian workforce in the Intelligence, Surveillance, and Reconnaissance and Special Operations Forces, Combat Readiness, Training, and Propulsion Directorates. AFLCMC equips U.S. and allied forces with operational weapon systems in support of military and national security operations. The acquisition and product support workforce provides cutting edge weapon systems, sustainment capabilities, and is charged with providing management, tools, and technical and business capabilities needed to oversee acquisition programs throughout their life cycle. The direct funded acquisition workforce funded in this project will support all phases of acquisition programs to include material solution analysis, technology development, engineering and manufacturing development, production and deployment, and operations and support. This funding does not include costs for base operating support civilian personnel. This project supports both civilian pay and non-pay support requirements.
acq workforce-global power — one RDT&E project inside PE 0605831F. Congressional marks are recorded on the program element, not on a project.
Project 665826 — acq workforce-global power — requests $289.7M in FY2027, 24% of the $1.21B requested for program element 0605831F. Year over year it falls 4.9% against FY2026.
Project 665826 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 304.6 |
| FY2027 | Request | 289.7 |
| FY2028 | Outyear | 294.8 |
| FY2029 | Outyear | 301.0 |
| FY2030 | Outyear | 307.3 |
| FY2031 | Outyear | 316.8 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
The $15.031 million decrease from FY26 to FY27 is a combination of the following: Increased funding for updated average work year costs and a reduction for workforce optimization. The funding supports 1,653 full-time equivalents.
The $0.135 million increase from FY26 to FY27 is due to inflation.
What project 665826 buys
This Project funds the Air Force Life Cycle Management Center (AFLCMC) civilian workforce in the Fighters and Advanced Aircraft, Bombers, and Armament Directorates. AFLCMC equips U.S. and allied forces with operational weapon systems in support of military and national security operations. The acquisition and product support workforce provides cutting edge weapon systems, sustainment capabilities, and is charged with providing management, tools, and technical and business capabilities needed to oversee acquisition programs throughout their life cycle. The direct funded acquisition workforce funded in this project will support all phases of acquisition programs to include material solution analysis, technology development, engineering and manufacturing development, production and deployment, and operations and support. This funding does not include costs for base operating support civilian personnel. This project supports both civilian pay and non-pay support requirements.
Acq Workforce-Global Reach — one RDT&E project inside PE 0605831F. Congressional marks are recorded on the program element, not on a project.
Project 665828 — Acq Workforce-Global Reach — requests $160.2M in FY2027, 13% of the $1.21B requested for program element 0605831F. Year over year it falls 11% against FY2026.
Project 665828 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 179.1 |
| FY2027 | Request | 160.2 |
| FY2028 | Outyear | 162.9 |
| FY2029 | Outyear | 166.4 |
| FY2030 | Outyear | 169.9 |
| FY2031 | Outyear | 173.4 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
The $18.899 million decrease from FY26 to FY27 is a combination of the following: Increased funding for updated average work year costs and a reduction for workforce optimization. The funding supports 1,016 full-time equivalents.
What project 665828 buys
This Project funds the Air Force Life Cycle Management Center (AFLCMC) civilian workforce in the Mobility, Training, and Presidential and Executive Airpower Directorates. AFLCMC equips U.S. and allied forces with operational weapon systems in support of military and national security operations. The acquisition and product support workforce provides cutting edge weapon systems, sustainment capabilities, and is charged with providing management, tools, and technical and business capabilities needed to oversee acquisition programs throughout their life cycle. The direct funded acquisition workforce funded in this project will support all phases of acquisition programs to include material solution analysis, technology development, engineering and manufacturing development, production and deployment, and operations and support. This funding does not include costs for base operating support civilian personnel. This project supports both civilian pay and non-pay support requirements.
Acq Workfoce-Advanced Prgm Technology — one RDT&E project inside PE 0605831F. Congressional marks are recorded on the program element, not on a project.
Project 665832 — Acq Workfoce-Advanced Prgm Technology — requests $79.0M in FY2027, 6.5% of the $1.21B requested for program element 0605831F. Year over year it grows 13% against FY2026.
Project 665832 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 69.8 |
| FY2027 | Request | 79.0 |
| FY2028 | Outyear | 80.4 |
| FY2029 | Outyear | 82.1 |
| FY2030 | Outyear | 83.8 |
| FY2031 | Outyear | 85.6 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
The $9.245 million increase from FY26 to FY27 is due to increased funding for updated average work year costs. The funding supports 425 full-time equivalents.
What project 665832 buys
This Project funds the AFLCMC civilian workforce supporting Special Access Programs across the Center. AFLCMC equips U.S. and allied forces with operational weapon systems in support of military and national security operations. The acquisition and product support workforce provides cutting edge weapon systems, sustainment capabilities, and is charged with providing management, tools, and technical and business capabilities needed to oversee acquisition programs throughout their life cycle. The direct funded acquisition workforce funded in this project will support all phases of acquisition programs to include material solution analysis, technology development, engineering and manufacturing development, production and deployment, and operations and support. This funding does not include costs for base operating support civilian personnel. This project supports both civilian pay and non-pay support requirements.
Acq Workforce - Direct — one RDT&E project inside PE 0605831F. Congressional marks are recorded on the program element, not on a project.
Project 664127 — Acq Workforce - Direct — requests $2.4M in FY2027, 0.2% of the $1.21B requested for program element 0605831F. It is a new start — no prior-year or current-year money.
Project 664127 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 2.4 |
| FY2028 | Outyear | 2.5 |
| FY2029 | Outyear | 4.0 |
| FY2030 | Outyear | 4.1 |
| FY2031 | Outyear | 3.0 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2026 to FY2027 change The $2.416 million increase from FY26 to FY27 is incorrectly aligned to Project 664127 and belongs in Project 665831. It will be executed in the correct project in FY27.
What project 664127 buys
This program element funds the AFLCMC civilian workforce in cross-cutting and mission support organizations such as Plans & Programs, Engineering, Contracting, Financial Management, Logistics, Program Management, Test, Intelligence, Safety, Personnel, Small Business, Inspector General, and Staff Judge Advocate. In addition, this program element funds the AFLCMC civilian workforce directly executing programs such as the Rapid Sustainment Office and the Cyber Resiliency Office for Weapon Systems. The Air Force Life Cycle Management Center (AFLCMC) equips U.S. and allied forces with operational weapon systems in support of military and national security operations. The acquisition and product support workforce provides cutting edge weapon systems, sustainment capabilities, and is charged with providing management, tools, and technical and business capabilities needed to oversee acquisition programs throughout their life cycle. The direct funded acquisition workforce funded in this program element will support all phases of acquisition programs to include material solution analysis, technology development, engineering and manufacturing development, production and deployment, and operations and support. This funding does not include costs for base operating support civilian personnel. These program elements support both civilian pay and non-pay support requirements.