RDT&E Program Element · President's Budget PB2027

RDT&E Ship & Aircraft Support

PE 0605863N·U.S. Navy·Approp. 1319 — RDT&E·BA6 — RDT&E Management Support
FY2027 Request
$170.7M
Navy · RDT&E
HitchAI read

U.S. Navy requests $170.7M in FY2027. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full.

FY2027 Request
$170.7M
▲ 13% vs FY2026
FY2026 Enacted
$151.5M
▲ 0.3% vs FY2025
FY2025 Actual
$151.0M
Prior year

Roll-up of 5 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $170.7M for RDT&E Ship & Aircraft Support under RDT&E program element 0605863N, up 13% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

501001500151.0FY25ACTUAL151.5FY26ENACTED170.7FY27REQUEST173.4FY28149.6FY29151.0FY30153.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual151.0
FY2026Enacted151.5
FY2027Request170.7
FY2028Outyear173.4
FY2029Outyear149.6
FY2030Outyear151.0
FY2031Outyear153.2
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 6 — RDT&E Management Support.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

5 projects roll up into PE 0605863N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 13% overall, which can hide much larger swings below.

The whole program

SUPT is funded on 13 lines across 4 appropriations

This page shows $51.6M of SUPT, 8.0% of the program's $646.2M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
Sub Periscope, Imaging and Supt Equip ProgProcurementNavy344.9
Exp Indirect Fire Gen Supt Wpn SysRDT&ENavy115.2
Nav & Electro-Optical SuptRDT&ENavy39.4
Comm & Elec Infrastructure SuptProcurementNavy37.6
Submarine Supt Equip ProgRDT&ENavy33.2
Naval Tact Cmd Supt Sys (NTCSS)ProcurementNavy10.1
Naval War Col Strategic Studies SuptRDT&ENavy9.6
Acoustic & Non-Acoustic Analysis SuptRDT&ENavy2.6
SUPT totalNavy646.2

Lines whose title names the program. 5 further lines only mention SUPT in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$170.7M
House NDAA (HASC)HASC
$170.7M full · +$0
Senate NDAA (SASC)SASC
$170.7M full · +$0
House Approps (HAC-D)HAC_D
$170.7M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

This continuing program provides support for the Self Defense Test Ship and developmental test squadron aircraft required to support Research, Development, Test and Evaluation (RDT&E) of new systems. The RDT&E ship and aircraft inventory is required to adequately test modifications and improvements to fielded weapon systems and sensors and new weapon systems and sensors and evaluate modifications to address new threat capabilities to increase the warfighting capability of the fleet.

Project 0569, 0568, 3206, 3238, 2924 — RDT&E Acft Supt
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0605863N is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605863N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "RDT&E Ship & Aircraft Support (PE 0605863N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605863N
Machine access
Markdown twin /programs/0605863N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$51.6M
▼ 3.1% vs FY2026
FY2026 Enacted
$53.2M
▲ 3.2% vs FY2025
FY2025 Actual
$51.5M
Prior year

RDT&E Acft Supt — one RDT&E project inside PE 0605863N. Congressional marks are recorded on the program element, not on a project.

Project 0569 — RDT&E Acft Supt — requests $51.6M in FY2027, 30% of the $170.7M requested for program element 0605863N. Year over year it falls 3.1% against FY2026.

Funding trajectory

Project 0569 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550051.5FY25ACTUAL53.2FY26ENACTED51.6FY27REQUEST53.2FY2854.1FY2955.0FY3056.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual51.5
FY2026Enacted53.2
FY2027Request51.6
FY2028Outyear53.2
FY2029Outyear54.1
FY2030Outyear55.0
FY2031Outyear56.0
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$50.5M
FY2026 enacted$51.9M
FY2027 request$50.1M

Provide support of RDT&E Aircraft planned depot maintenance events while funding annual operating and sustainment costs associated with Aviation Depot Level Repairables (AVDLR) and Individual Material Readiness List (IMRL) items associated with test pilot proficiency flights, engine repairs and overhauls, and emergent repairs to RDT&E…

Read the FY2027 plan →
In-Service Repairs▲ 15%
FY2025 actual$1.0M
FY2026 enacted$1.3M
FY2027 request$1.5M

Provide planned In-Service Repair funds for emergent repair requirements to aircraft performing mission critical test and evaluation projects.

Project 0569 — every activity in full →
Project detail

What project 0569 buys

Research, Development, Test and Evaluation (RDT&E) Aircraft Support: This continuing project funds costs associated with the preventive and corrective maintenance of fixed and rotary wing aircraft which directly support test and evaluation of aircraft and associated weapon systems and sensors. Testing aboard dedicated RDT&E aircraft reduces the number of fleet units required to support test and evaluation of aviation programs. This project unit funds airframe Standard Depot Level Maintenance (SDLM), the Integrated Maintenance Concept and Planned Depot Maintenance, major in-service repairs, emergent repairs and aircraft engine periodic maintenance and overhauls and aircraft material condition and field inspections. Also included in this project unit, are the costs of Aviation Depot Level Repairables (AVDLR), which are spare and replacement parts for components that fail during the conduct of readiness flight operations, aircrew training and proficiency flight hours, and must be replaced to support follow-on flight operations. This project unit also funds Aircraft Structure Periodic Assessments (ASPA), Individual Material Readiness List (IMRL) tools and support equipment, Aviation Climate Assessment Survey System (ACASS) and other projects and peripheral equipment associated with the maintenance of flight readiness for RDT&E aircraft. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under RESEARCH, DEVELOPMENT, TEST and EVALUATION MANAGEMENT SUPPORT because it supports efforts directed toward sustaining or modernizing equipment required for general research, development, test and evaluation.

FY2027 Request
$44.7M
▲ 3.0% vs FY2026
FY2026 Enacted
$43.4M
▲ 0.9% vs FY2025
FY2025 Actual
$43.0M
Prior year

RDT&E Acft Flt Hours — one RDT&E project inside PE 0605863N. Congressional marks are recorded on the program element, not on a project.

Project 0568 — RDT&E Acft Flt Hours — requests $44.7M in FY2027, 26% of the $170.7M requested for program element 0605863N. Year over year it grows 3.0% against FY2026.

Funding trajectory

Project 0568 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25043.0FY25ACTUAL43.4FY26ENACTED44.7FY27REQUEST43.5FY2844.3FY2945.1FY3045.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual43.0
FY2026Enacted43.4
FY2027Request44.7
FY2028Outyear43.5
FY2029Outyear44.3
FY2030Outyear45.1
FY2031Outyear45.9
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$21.1M
FY2026 enacted$23.1M
FY2027 request$26.6M

Provide support for the cost of Aviation Depot Level Repairables (AVDLR), lubricants and consumable and replacement parts in support of test pilot proficiency hours, along with organizational and intermediate-level maintenance, associated with the projected direct readiness flight hour costs in support of NAVAIR test pilot proficiency…

Read the FY2027 plan →
FY2025 actual$21.9M
FY2026 enacted$20.3M
FY2027 request$18.0M

Provide fuel in support of RDT&E Test Pilot readiness for over 200 test pilots and associated aircrew assigned to Naval Test Wing Atlantic and Naval Test Wing Pacific developmental test squadrons (VX-20, HX-21, VX-23, UX-24, and VX-31), the S&T squadron (VXS-1), and the range support and test squadron (VX-30). Fuel is funded to 60% of…

Read the FY2027 plan →
Project 0568 — every activity in full →
Project detail

What project 0568 buys

Research, Development, Test and Evaluation (RDT&E) Aircraft Flight Hours: This non-acquisition project supports direct flight hour costs, which include aviation fuel and a portion of the costs of Aviation Depot Level Repairables (AVDLR) associated with NAVAIR test pilot proficiency flights, including organizational and intermediate maintenance, associated consumables, including petroleum, oil, lubricants, and spare and replacement parts for components that fail. Annual test pilot flight hours, as delineated in OPNAVINST 3710.7, are satisfied through a combination of program funded test flights, which vary year to year based on program schedules; flights funded through this project unit ensure a baseline level of pilot readiness. These flight hours ensure test pilots remain proficient in assigned type / model / series aircraft in which they are qualified (approximately 3 hours per month) during lulls in program test schedules to ensure proficient test pilots are available to safely support aviation program testing. Readiness hours are designed to provide aircrew with a minimum of 11 flight hours per month, for a total of 133 hours annually. Flight hours support ferry flights to Fleet Readiness Centers for planned depot maintenance, post maintenance, acceptance test flights, aircrew training and test pilot proficiency when test program demand is low, in direct support of Research and Development Programs at Naval Air Systems Command, and Office of Naval Research flight activities. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under RESEARCH, DEVELOPMENT, TEST and EVALUATION MANAGEMENT SUPPORT because it supports efforts directed toward maintaining test pilot readiness in direct support of general research, development, test and evaluation.

FY2027 Request
$41.1M
▲ 99% vs FY2026
FY2026 Enacted
$20.6M
▼ 0.1% vs FY2025
FY2025 Actual
$20.7M
Prior year

T&E Enterprise — one RDT&E project inside PE 0605863N. Congressional marks are recorded on the program element, not on a project.

Project 3206 — T&E Enterprise — requests $41.1M in FY2027, 24% of the $170.7M requested for program element 0605863N. Year over year it grows 99% against FY2026.

Funding trajectory

Project 3206 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25020.7FY25ACTUAL20.6FY26ENACTED41.1FY27REQUEST42.7FY2817.2FY2916.3FY3016.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual20.7
FY2026Enacted20.6
FY2027Request41.1
FY2028Outyear42.7
FY2029Outyear17.2
FY2030Outyear16.3
FY2031Outyear16.4
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$20.7M
FY2026 enacted$20.6M
FY2027 request$41.1M

1) Enterprise Testing and Planning: a) Test planning necessary to conduct testing of the SSDS BL 12 CS variants in support of TEMP 1910 planned events. b) Continue to provide overall technical management and financial execution support for the T&E Enterprise. Provide aircraft services coordination, technical documentation support, and…

Read the FY2027 plan →
Project 3206 — every activity in full →
Project detail

What project 3206 buys

The Testing & Evaluation (T&E) Enterprise merges common ship, element, and system requirements into the fewest number of test events while leveraging planned Combat System Ship Qualification Trials (CSSQT) to accomplish Developmental Testing (DT) and Operational Testing (OT) requirements. All tests on the SDTS require the sharing of infrastructure, missile range allocations, execution time, and underway time to eliminate duplicative testing. T&E Enterprise provides end-to-end mission Operational Testing in a realistic operational environment, capitalizing on Probability of Raid Annihilation Modeling and Simulation (M&S) data validated with results of Operational and Live Fire Testing, and ensuring a consistent approach across ship classes. Applicability of all test events is beneficial across multiple ship classes with the same variation under test. Currently executing Test & Evaluation Master Plan (TEMP 1910) in support of Ship Self Defense System (SSDS) Baseline 12 and SPY-6(V)2/3 Platforms. TEMP 1910 merges common ship, element, and system requirements into the fewer test events. Enterprise Cost elements: a) Enterprise Testing and Planning. Includes the contractor and government costs to administer the Enterprise, collect and distribute data from live events, maintain Cybersecurity certifications, and financial management. b) Self-Defense Test Ship (SDTS) Combat Systems. Includes preventive maintenance and repairs of major combat system elements. c) Enterprise Testbed (ETB). Requires integration of OT-quality digital representations of shipboard combat system performance including infrastructure, distributed secure network, and common environmental services for DT/OT. d) SDTS Integrated Testing (IT). SDTS testing requirements outlined in TEMP 1910 in support of SSDS Baseline 12 and SPY-6(V)2/3 Platforms.

FY2027 Request
$18.0M
▼ 9.5% vs FY2026
FY2026 Enacted
$19.9M
▼ 2.6% vs FY2025
FY2025 Actual
$20.5M
Prior year

Threat Engineering — one RDT&E project inside PE 0605863N. Congressional marks are recorded on the program element, not on a project.

Project 3238 — Threat Engineering — requests $18.0M in FY2027, 11% of the $170.7M requested for program element 0605863N. Year over year it falls 9.5% against FY2026.

Funding trajectory

Project 3238 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

020.5FY25ACTUAL19.9FY26ENACTED18.0FY27REQUEST18.5FY2818.8FY2919.1FY3019.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual20.5
FY2026Enacted19.9
FY2027Request18.0
FY2028Outyear18.5
FY2029Outyear18.8
FY2030Outyear19.1
FY2031Outyear19.2
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$20.5M
FY2026 enacted$19.9M
FY2027 request$18.0M

Sustainment: -Continue Support and Sustainment (S&S) of 15 Threat Models that remain in continued use. Periodic refinement and update of models are required due to continued evolving threats. Development and Integration: -Continue to provide support for the integration and use of threat products (ATEP) in various combat system testbeds…

Read the FY2027 plan →
Project 3238 — every activity in full →
Project detail

What project 3238 buys

The Threat Engineering program assesses the current and future threat environment and works in coordination with the Office of Naval Intelligence (ONI) to develop, produce, and evolve digital threat engineering models in support of test and evaluation (T&E) requirements. NAVSEA requires comprehensive, validated threat modeling and simulation (M&S) products to dynamically and responsively interact with surface ship air defense systems and subsystems to allow for a performance evaluation in an operationally realistic environment. These threat M&S products, called Acquisition Threat Engineering Products (ATEP), must contain the details, features, and components necessary to react with the Blue air defense systems as the actual threats will with, deployed air defense systems to provide a comprehensive, high-confidence evaluation of Blue system capabilities. The successful and rigorous end-to-end evaluation of surface ship combat systems, to include the component systems, are required before capability and ship baselines can be delivered to the warfighter. ATEPs are valid T&E assets that satisfy Director of Operational Test and Evaluation (DOT&E) and Operational Test & Evaluation Force (OPTEVFOR) requirements in both Modeling and Simulation (M&S) testbed and at-sea configurations. ATEPs satisfy OPTEVFOR's threat model requirement for fidelity commensurate with the Blue-force system representations and contain intel-derived lethality/vulnerability data, physics-based six degrees-of-freedom models, reactive seekers and guidance, and other engineering data. ATEPs are necessary to evaluate mandatory ship Key Performance Parameters (KPP), including operational effectiveness and suitability. ATEPs reduce Navy operational testing (OT) costs by enabling portions of OT to be conducted via M&S, increasing requirements coverage and avoiding the costs of targets and weapons that would ordinarily be required to conduct OT solely via live fire events. As each threat system is unique, the ATEP representation of each must include the features of specific threats, such as electronic countermeasures (ECM), active countermeasures, communications links, electronic counter-countermeasures (ECCM).

FY2027 Request
$15.3M
▲ 6.8% vs FY2026
FY2026 Enacted
$14.3M
▼ 6.2% vs FY2025
FY2025 Actual
$15.3M
Prior year

SDTS — one RDT&E project inside PE 0605863N. Congressional marks are recorded on the program element, not on a project.

Project 2924 — SDTS — requests $15.3M in FY2027, 9.0% of the $170.7M requested for program element 0605863N. Year over year it grows 6.8% against FY2026.

Funding trajectory

Project 2924 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

015.3FY25ACTUAL14.3FY26ENACTED15.3FY27REQUEST15.5FY2815.3FY2915.5FY3015.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual15.3
FY2026Enacted14.3
FY2027Request15.3
FY2028Outyear15.5
FY2029Outyear15.3
FY2030Outyear15.5
FY2031Outyear15.8
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

SDTS▲ 7%
FY2025 actual$15.3M
FY2026 enacted$14.3M
FY2027 request$15.3M

NSWC PHD continues to conduct management, operation, maintenance and repair/upgrade of critical ship HM&E systems to ensure safe operation of the Self Defense Test Ship (SDTS). Maintain, operate, configure and upgrade the TSRCS and associated infrastructure in support of T&E requirements onboard the SDTS to support the Air Warfare Ship…

Read the FY2027 plan →
Project 2924 — every activity in full →
Project detail

What project 2924 buys

This project provides for labor and engineering support, preventive and corrective maintenance of mission critical Hull, Mechanical and Electrical (HM&E) and remote-control system maintenance aboard the Self Defense Test Ship (SDTS) in support of the Navy RDT&E of ship self-defense systems. Testing aboard this ship provides the capability to safely test self-defense weapon systems within their minimum range and reduces the number of fleet units required to support RDT&E efforts. Funds are used to purchase consumable supplies and repair parts, conduct routine preventive and emergent corrective maintenance and engineering support services and the necessary personnel to support at-sea operations.