RDT&E Program Element · President's Budget PB2027

Facilities Sustainment - Test and Evaluation Support

PE 0605978F·U.S. Air Force·Approp. 3600 — RDT&E·BA6 — RDT&E Management Support
FY2027 Request
$298.9M
◆ Scaling +225%
HitchAI read

U.S. Air Force funding ramps 225% to a $298.9M request in FY2027 — the program's peak, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full.

FY2027 Request
$298.9M
▲ 225% vs FY2026
FY2026 Enacted
$92.0M
▲ 45% vs FY2025
FY2025 Actual
$63.6M
Prior year

For fiscal year 2027, the U.S. Air Force is requesting $298.9M for Facilities Sustainment - Test and Evaluation Support under RDT&E program element 0605978F, up 225% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

50100150200250300063.6FY25ACTUAL92.0FY26ENACTED298.9FY27REQUEST287.9FY28269.9FY29277.2FY30279.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual63.6
FY2026Enacted92.0
FY2027Request298.9
FY2028Outyear287.9
FY2029Outyear269.9
FY2030Outyear277.2
FY2031Outyear279.7
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 6 — RDT&E Management Support.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0605978F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 225% overall, which can hide much larger swings below.

Project 6606MR

Facility Sustainment-T&E Support

$298.9MFY2027 request ▲ 225%
FY2025 actual$63.6M
FY2026 enacted$92.0M
FY2027 request$298.9M

This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605807F. Sustainment is defined as the maintenance and repair activities necessary to keep facilities in good working order and includes regularly scheduled adjustments and inspections, preventative maintenance tasks, and emergency response and service calls for minor repairs. It also includes major repairs or replacement of facility components (usually accomplished by contract) that are expected to occur periodically throughout the lifecycle of facilities. This work includes regular roof replacement, refinishing of wall and floor surfaces, repairing and replacing of heating and cooling systems, repairing tile, carpeting, and similar types of work. This work also includes inspection and repair of heavy plant machinery, high-power electrical switching gear, hydraulic, lubrication, forced-air and fluid cooling systems, high pressure vessel health monitoring, facility control and remote monitoring systems, liquid oxygen systems, steam systems, test instrumentation, and fire detection and suppression systems. Environmental compliance costs, facility leases, or other tasks associated with facilities operations (such as custodial services grounds services, waste disposal, and the provision of central utilities) are not included. Sustainment funds support the following Air Force organizations and their associated test and evaluation facilities: the 96th Test Wing (TW) at Eglin AFB, FL; the 412TW at Edwards AFB, CA; Arnold Engineering and Development Complex (AEDC), to include assets at Arnold AFB, TN, the 704th Test Group (704TG) at Holloman AFB, NM, the 704TG Landing Gear Test Facility (LGTF) at Wright-Patterson AFB, OH, the Hypersonic Wind Tunnel 9 at White Oak, MD, and the National Full-Scale Aerodynamics Complex (NFAC) at Moffett Field, CA.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$3.9M
FY2026 enacted$5.5M
FY2027 request$14.6M

96TW FY 2027 Budget Year plans include roof repair, exterior envelope, and corrosion control for multiple test facilities; completion of a deferred HVAC project supporting range operations; generator upgrade; and multiple lifecycle HVAC, electrical, and plumbing repairs across the installation.

Read the FY2027 plan →
FY2025 actual$39.0M
FY2026 enacted$53.6M
FY2027 request$213.0M

AEDC FY 2027 Budget Year plans include mechanical asset sustainment for 16T/4T, 16S, and HPA test facilities; tunnel 9 preventative maintenance; turbine mechanical and electrical maintenance; bus duct system repair; and B-Exhaust Plant Discharge Duct Asbestos Abatement and Leak Repair. Begin infrastructure projects to support Long Range…

Read the FY2027 plan →
FY2025 actual$20.7M
FY2026 enacted$32.8M
FY2027 request$71.3M

412TW FY 2027 Budget Year plans include HVAC, roof, and paint projects for multiple test facilities.

Read the FY2027 plan →
Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$298.9M
House NDAA (HASC)HASC
$298.9M full · +$0
Senate NDAA (SASC)SASC
$298.9M full · +$0
House Approps (HAC-D)HAC_D
$298.9M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605807F. Sustainment is defined as the maintenance and repair activities necessary to keep facilities in good working order and includes regularly scheduled adjustments and inspections, preventative maintenance tasks, and emergency response and service calls for minor repairs. It also includes major repairs or replacement of facility components (usually accomplished by contract) that are expected to occur periodically throughout the lifecycle of facilities.

Project 6606MR — Facility Sustainment-T&E Support
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605978F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Facilities Sustainment - Test and Evaluation Support (PE 0605978F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605978F
Machine access
Markdown twin /programs/0605978F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks