RDT&E Program Element · President's Budget PB2027

Chinook Product Improvement Program

PE 0607137A·U.S. Army·Approp. 2040 — RDT&E·BA7 — Operational System Development
FY2027 Request
$7.3M
Army · RDT&E
HitchAI read

U.S. Army funding falls 72% to a $7.3M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators added 82% (to $13.3M). Boeing leads the industry work.

FY2027 Request
$7.3M
▼ 72% vs FY2026
FY2026 Enacted
$25.9M
▲ 457% vs FY2025
FY2025 Actual
$4.6M
Prior year

For fiscal year 2027, the U.S. Army is requesting $7.3M for Chinook Product Improvement Program under RDT&E program element 0607137A, down 72% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2504.6FY25ACTUAL25.9FY26ENACTED7.3FY27REQUEST7.4FY287.4FY297.4FY307.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.6
FY2026Enacted25.9
FY2027Request7.3
FY2028Outyear7.4
FY2029Outyear7.4
FY2030Outyear7.4
FY2031Outyear7.5
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0607137A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -72% overall, which can hide much larger swings below.

Project ES4

Chinook Product Improvement Program

$7.3MFY2027 request ▼ 72%
FY2025 actual$4.6M
FY2026 enacted$25.9M
FY2027 request$7.3M
Product DevelopmentSupportTest and Evaluation

This project is critical to achieving heavy lift capability in support of Transformation in Contact (TiC) and Continuous Transformation objectives. The CH-47F Block II helicopter, with an increased payload and operational reach, is the only platform that can lift the Light Medium Tactical Vehicle (LMTV), M777 and medium girder bridge to enable the TiC Forces to Compete, Penetrate, Disintegrate, and Exploit at operationally relevant distances. The CH-47 Block II Middle Tier Acquisition Rapid Fielding (MTA RF) effort inserts critical and affordable technologies into the Chinook fleet to maintain platform operational capabilities, while continuing to meet the Warfighter requirements. The CH-47F Block II provides additional capability to the field with increased payload, extended reach, improved sustainability, and an increased maximum gross weight to 54,000 pounds. Key improvements to the aircraft's safety and reliability include refinement to the rotor system, drivetrain, fuel, and electrical systems and a strengthened airframe providing commonality with the MH-47G. The Chinook Block II program updates the Common Avionics Architecture System (CAAS) and Digital Automatic Flight Control System (DAFCS) software packages of the aircraft and incorporates other avionics changes introduced into the final CH-47F production aircraft. The program includes provisions for anticipated future upgrades, weight savings and cost savings that provide significantly increased capability to the field. These initiatives ensure the Army has a platform with the flexibility and performance needed to meet the needs of TiC operations. The total cost of the CH-47F Block II MTA RF effort is $1,228.5 billion (APA $1,184.1 billion, RDTE $44.4 million), including RDT&E from FY2025 through FY2030, per the Acquisition Decision Memorandum dated 12 Sep 2025. The CH-47F Block II MTA RF is fully funded across the Future Years Defense Program. This PE utilized FY2025 $4.640 million and FY2026 $10.859 million for the CH-47F Block II MTA RF requirement. The Engineering and Manufacturing Development (EMD) phase produced three production representative test articles to support a Production Decision.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Testing and Evaluation▼ 17%
FY2025 actual$3.9M
FY2026 enacted$8.8M
FY2027 request$7.3M

FY2027 planned work Complete Operational Demonstration and utilize engineering support and support mitigations to resolve issues discovered during demonstration. Incorporate mitigations into production aircraft as necessary to obtain Materiel Release (MR). Complete the next iteration of Digital Automatic Flight Control System (DAFCS) software handling qualities testing, standalone electronic warfare assessment, and preparations for fielding.

FY2026 to FY2027 change The FY2027 decrease reflects completion of system level qualification, MWO testing and installations in FY2026 leading to the Operational Demonstration in 2QFY2027.

FY2026 plans — current year Finalize all system level qualification testing for the production aircraft. Use engineering support and mitigations for technical challenges discovered during qualification testing and Modification Work Order (MWO) installations. Incorporate mitigation and improvements onto the production aircraft. Finish system level validation and verification of production aircraft configuration. Complete testing of MWOs: Aircraft Survivability Equipment (ASE), Multi-Anti Jamming GPS Antenna (MAGNA), Eagle M Embedded Global Initial (EGI) navigation system, E3 testing, CAAS and DAFCS software testing, and improved system handling qualities and fielding.

FY2025 accomplishments Enter into Safety of Flight (SOF) testing for Aviation Survivability Equipment (ASE) and Aviation Mission Systems and Architecture (AMSA) equipment. Conduct Electromagnetic Environmental Effects (E3) testing on the production representative aircraft followed by handling qualities testing. Provide continued engineering support for any issues or challenges encountered during system level testing.

System Support▼ 100%
FY2025 actual$0.8M
FY2026 enacted$2.0M
FY2027 request

FY2026 to FY2027 change The decrease in costs from FY2026 to FY2027 is due to the completion of additional requirements for Contract Data Requirement List (CDRL).

FY2026 plans — current year Completion of additional requirements for Contract Data Requirement List (CDRL) document resubmittals and revisions necessary for airworthiness approval of the production aircraft.

FY2025 accomplishments Continued development of the mission planning software to support SIL testing. Qualification of the GFE items for performance improvements to the CH-47 Block II for Lot 3. Provide development and engineering support of Cargo Engineering Analysis Cockpit (CH-EAC) for evaluation of software and avionics impacts affecting pilot workload.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$7.3M
House NDAA (HASC)HASC
$7.3M full · +$0
Senate NDAA (SASC)SASC
$7.3M full · +$0
House Approps (HAC-D)HAC_D
$13.3M +$6.0M · +82%
▲ $6.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Boeing
$7.3M · 100%
Testing and Evaluation
Where FY2027 funding flowsShare$M
Industry primes100%7.3
FY2027 request100%7.3
See Boeing's full federal contract ledger members
Program detail

Mission & acquisition strategy

This project is critical to achieving heavy lift capability in support of Transformation in Contact (TiC) and Continuous Transformation objectives. The CH-47F Block II helicopter, with an increased payload and operational reach, is the only platform that can lift the Light Medium Tactical Vehicle (LMTV), M777 and medium girder bridge to enable the TiC Forces to Compete, Penetrate, Disintegrate, and Exploit at operationally relevant distances. The CH-47 Block II Middle Tier Acquisition Rapid Fielding (MTA RF) effort inserts critical and affordable technologies into the Chinook fleet to maintain platform operational capabilities, while continuing to meet the Warfighter requirements.

On 12 September 2025, the CH-47F Block II program entered the Rapid Fielding (RF) pathway. This pathway facilitates the rapid fielding of CH-47F Block II aircraft to units supporting missions in contested Area of Responsibilities (AORs) such as Indo-Pacific Command (INDOPACOM). Under this pathway, the Army will accelerate fielding of up to 24 aircraft to two Combat Aviation Brigades starting in FY28. The next production decision for CH-47F Block II will be in 2027.

Project ES4 — Chinook Product Improvement Program
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what Boeing has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0607137A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Chinook Product Improvement Program (PE 0607137A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0607137A