RDT&E Program Element · President's Budget PB2027

Tomahawk Mssn Planning Ctr

PE 0204229N·U.S. Navy·Approp. 1319 — RDT&E·BA7 — Operational System Development
FY2027 Request
$76.7M
Navy · RDT&E
HitchAI read

U.S. Navy funding falls 43% to a $76.7M request in FY2027, before stepping down 49% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. RTX / Raytheon leads the industry work.

FY2027 Request
$76.7M
▼ 43% vs FY2026
FY2026 Enacted
$134.2M
▼ 18% vs FY2025
FY2025 Actual
$163.0M
Prior year

Roll-up of 6 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $76.7M for Tomahawk Mssn Planning Ctr under RDT&E program element 0204229N, down 43% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

501001500163.0FY25ACTUAL134.2FY26ENACTED76.7FY27REQUEST47.7FY2847.4FY2946.7FY3039.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual163.0
FY2026Enacted134.2
FY2027Request76.7
FY2028Outyear47.7
FY2029Outyear47.4
FY2030Outyear46.7
FY2031Outyear39.3
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

6 projects roll up into PE 0204229N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -43% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$76.7M
House NDAA (HASC)HASC
$76.7M full · +$0
Senate NDAA (SASC)SASC
$76.7M full · +$0
House Approps (HAC-D)HAC_D
$76.7M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

RTX / Raytheon
$28.6M · 37%
NAV/COMMs Improvements · CPFF
NAWC-WD
$10.4M · 14%
M-Code Development Support
Where FY2027 funding flowsShare$M
Industry primes78%59.7
Government labs & warfare centers20%15.3
Other / unspecified2.1%1.6
FY2027 request100%76.7
See RTX / Raytheon's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Theater Mission Planning Center (TMPC) consists of Commercial and Government Off-The-Shelf (COTS/GOTS) software and COTS hardware. TMPC is the mission planning segment of the Tomahawk Weapon System (TWS) that provides subsystems for the precision targeting, route planning, mission distribution, and strike management of Tomahawk cruise missile missions from sites located ashore and afloat. TMPC optimizes all aspects of the Tomahawk missile mission to successfully engage a target. TMPC provides mission planning at the theater and operational levels and is designed for high-rate mission planning production responsive to national strategic, operational, and tactical requirements.

Maritime Strike Tomahawk (MST) will enable surface warfare engagement capability from U.S. Navy Guided Missile Cruiser (CG), Guided Missile Destroyer (DDG), and Nuclear Powered Fast Attack Submarine (SSN) platforms. The MST program includes upgrades to the All-Up Round (AUR) missile, the Tactical Tomahawk Weapons Control System (TTWCS) and also required upgrades to the Theater Mission Planning Center (TMPC) programs (under PU 4036). To facilitate rapid fleet fielding, hardware design was phased to the beginning of the program. Technical Data package for seeker production units completed in 3Q FY 2020 which supported procurement in FY 2021. Seeker software development will continue with initial Engineering Design Models.

Project 4036, 4034, 4035, 4033, 4032, 0545 — TTWCS TMPC PPPI
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0204229N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what RTX / Raytheon has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0204229N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Tomahawk Mssn Planning Ctr (PE 0204229N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0204229N
Machine access
Markdown twin /programs/0204229N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$24.0M
▲ 11% vs FY2026
FY2026 Enacted
$21.7M
▼ 13% vs FY2025
FY2025 Actual
$24.8M
Prior year

TTWCS TMPC PPPI — one RDT&E project inside PE 0204229N. Congressional marks are recorded on the program element, not on a project.

Project 4036 — TTWCS TMPC PPPI — requests $24.0M in FY2027, 31% of the $76.7M requested for program element 0204229N. Year over year it grows 11% against FY2026.

Funding trajectory

Project 4036 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25024.8FY25ACTUAL21.7FY26ENACTED24.0FY27REQUEST27.5FY2828.6FY2927.6FY3020.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual24.8
FY2026Enacted21.7
FY2027Request24.0
FY2028Outyear27.5
FY2029Outyear28.6
FY2030Outyear27.6
FY2031Outyear20.0
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$11.3M
FY2026 enacted$15.9M
FY2027 request$14.9M

Continuation of design/development, validation of new advanced features, security measures, kill chain improvements, and software architecture of TMPC 8.X that increases performance for fielded systems and is aligned with future capabilities.

Read the FY2027 plan →
Tactical Tomahawk Weapons Control System (TTWCS)▲ 60%
FY2025 actual$13.5M
FY2026 enacted$5.7M
FY2027 request$9.1M

FY 2027 plans include the planning, design/development, and validation of new advanced computing hardware components with increased capacity/throughput, security measures, integrated combat systems prototypes, and software architecture that increases performance for fielded systems and is aligned/interoperable with future networking…

Project 4036 — every activity in full →
Who's building it

Named performers on project 4036

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Leidos
$4.7M · 20%
NAWCAD
$2.6M · 11%
Perspecta
$2.5M · 11%
BAE Systems
$2.5M · 10%
Project detail

What project 4036 buys

The Theater Mission Planning Center (TMPC) consists of Commercial and Government Off-The-Shelf (COTS/GOTS) software and COTS hardware. TMPC is the mission planning segment of the Tomahawk Weapon System (TWS) that provides subsystems for the precision targeting, route planning, mission distribution, and strike management of Tomahawk cruise missile missions from sites located ashore and afloat. TMPC optimizes all aspects of the Tomahawk missile mission to successfully engage a target. TMPC provides mission planning at the theater and operational levels and is designed for high-rate mission planning production responsive to national strategic, operational, and tactical requirements. TMPC develops and distributes missions; provides command information services for all variants of the Tomahawk missile; provides strike planning, execution, coordination, control and reporting, and provides Maritime Component Commanders (MCC) the capability to plan or modify conventional TWS missions. TMPC is employed in major joint combat operations and Overseas Contingency Operations. TMPC is employed in major joint combat operations and Overseas Contingency Operations. TMPC has evolved into four scalable configurations deployed at 181 sites: Cruise Missile Support Activities (CMSAs) (3), Tomahawk Strike Mission Planning Cells (TSMPCs) (3), Carrier Strike Groups (CSGs) (21 Total: 11 CVNs and 10 Shore Sites), and Firing Units (FRUs) (135- 85 Surface / 50 Subsurface). Additionally, TMPC is installed in Labs (6) and Training Classrooms (13) that contain various combinations of the four configurations. TMPC software development activities support new capabilities for the Tomahawk Weapon System, decrease mission planning time, increase the quality and accuracy of each mission, and reduce complexity. The software development activities will also include networking equipment to integrate with the naval data exchange for unified strike planning and execution system to provide all source multi-intelligence data at multiple levels of security to strike mission planners. The TMPC will incorporate cross domain solution capabilities to include data exchange with the Next Generation Mission Planning System. TMPC was previously referred to as Tomahawk Command and Control System (TC2S).

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$16.7M
▼ 70% vs FY2026
FY2026 Enacted
$56.3M
▼ 13% vs FY2025
FY2025 Actual
$64.5M
Prior year

Maritime Strike — one RDT&E project inside PE 0204229N. Congressional marks are recorded on the program element, not on a project.

Project 4034 — Maritime Strike — requests $16.7M in FY2027, 22% of the $76.7M requested for program element 0204229N. Year over year it falls 70% against FY2026.

Funding trajectory

Project 4034 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550064.5FY25ACTUAL56.3FY26ENACTED16.7FY27REQUEST17.3FY2817.6FY2917.9FY3018.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual64.5
FY2026Enacted56.3
FY2027Request16.7
FY2028Outyear17.3
FY2029Outyear17.6
FY2030Outyear17.9
FY2031Outyear18.2
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$64.5M
FY2026 enacted$56.3M
FY2027 request$16.7M

Continuation of activities in support of Maritime Strike Tomahawk (MST) in FY 2027 will focus on qualification activities for Initial Operational Capability (IOC) hardware, including Ultra 1.1+ (formerly known as ULTRA 1.2) seeker processor upgrades. Integration efforts will ensure full compatibility and performance between IOC software…

Read the FY2027 plan →
Project 4034 — every activity in full →
Who's building it

Named performers on project 4034

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$11.0M · 66%
NAWC-WD
$1.7M · 10%
NAWC-AD
$0.7M · 4.1%
NAWCWD
$0.6M · 3.4%
Project detail

What project 4034 buys

Maritime Strike Tomahawk (MST) modernization effort provides the capability to hit moving maritime targets through mid-course guidance via a third party or seeker mode, to a terminal seeker engagement. MST was designated an ACAT 1 subprogram in FY 2023. Early Operational Capability (EOC) planned in FY 2026. Program of Record will consist of a Quick Reaction Assessment (QRA) to support EOC fielding with continued EOC and IOC testing in FY 2026. This testing will validate seeker software algorithm updates, commensurate Weapons Control System (WCS) and Theater Mission Planning Center (TMPC) software updates.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$15.2M
▼ 4.8% vs FY2026
FY2026 Enacted
$16.0M
▼ 50% vs FY2025
FY2025 Actual
$32.1M
Prior year

JMEWS — one RDT&E project inside PE 0204229N. Congressional marks are recorded on the program element, not on a project.

Project 4035 — JMEWS — requests $15.2M in FY2027, 20% of the $76.7M requested for program element 0204229N. Year over year it falls 4.8% against FY2026.

Funding trajectory

Project 4035 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25032.1FY25ACTUAL16.0FY26ENACTED15.2FY27REQUEST1.4FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual32.1
FY2026Enacted16.0
FY2027Request15.2
FY2028Outyear1.4
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

JMEWS▼ 5%
FY2025 actual$32.1M
FY2026 enacted$16.0M
FY2027 request$15.2M

JMEWS planned activities include Transition to Production (TTP) activities to complete EMD phase, Ground Launch Flight Tests (GLFT), System Verification Review, and Production Readiness Review (PRR) which includes delivery of the manufacturing plan of hardware to support Low Rate Initial Production (LRIP).

Read the FY2027 plan →
Project 4035 — every activity in full →
Who's building it

Named performers on project 4035

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWC-WD
$8.6M · 56%
RTX / Raytheon
$3.9M · 26%
OPTEVFOR
$0.7M · 4.8%
NAWC-AD
$0.5M · 3.3%
Project detail

What project 4035 buys

The Joint Multiple-Effects Warhead System (JMEWS) ACAT III program enables the Tactical Tomahawk to utilize multiple lethal effects to address Hard and Deeply Buried Targets (HDBT) while increasing the Tomahawk Weapon System (TWS) capabilities against Integrated Air Defense Systems (IADS) and Weapons of Mass Destruction (WMD).

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$13.3M
▼ 13% vs FY2026
FY2026 Enacted
$15.3M
▼ 25% vs FY2025
FY2025 Actual
$20.4M
Prior year

M-Code — one RDT&E project inside PE 0204229N. Congressional marks are recorded on the program element, not on a project.

Project 4033 — M-Code — requests $13.3M in FY2027, 17% of the $76.7M requested for program element 0204229N. Year over year it falls 13% against FY2026.

Funding trajectory

Project 4033 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

020.4FY25ACTUAL15.3FY26ENACTED13.3FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual20.4
FY2026Enacted15.3
FY2027Request13.3
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

M-Code▼ 13%
FY2025 actual$20.4M
FY2026 enacted$15.3M
FY2027 request$13.3M

FY 2027 M-Code planned activities include completion of EMD. EMD efforts include Proof of Manufacturing hardware and final software qualification, and achieve Security Approval of an M-Code capable Tactical Tomahawk (TACTOM) AGR5.

Read the FY2027 plan →
Project 4033 — every activity in full →
Who's building it

Named performers on project 4033

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$10.3M · 77%
NAWC-AD
$1.2M · 9.3%
NAWC-WD
$0.1M · 0.7%
Project detail

What project 4033 buys

The M-Code (ACAT IVT) Increment I program upgrades the Tactical Tomahawk to the next generation Global Positioning System (GPS) satellite constellation required to maintain GPS-provided position, navigation, and timing (PNT) for the missiles utilizing M-Code capable Anti-Jam GPS Receiver (AGR5) and is planned for Milestone C production decision in FY 2028 and Initial Operating Capability (IOC) in FY 2030. AGR software and hardware development delays resulted in a schedule breach to the TACTOM M-Code APB Milestone C threshold of February 2026. This resulted in realignment of FY 2026 funds for Pre-Production/Proof of Design and Proof of Manufacturing units. The M-Code mandate and Public Law restricts the purchase of only M-Code-capable GPS User Equipment (MGUE) after FY 2017 unless a waiver is granted by the Secretary of Defense.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$7.5M
▼ 70% vs FY2026
FY2026 Enacted
$24.9M
▲ 45% vs FY2025
FY2025 Actual
$17.1M
Prior year

NAV/COMMS — one RDT&E project inside PE 0204229N. Congressional marks are recorded on the program element, not on a project.

Project 4032 — NAV/COMMS — requests $7.5M in FY2027, 9.7% of the $76.7M requested for program element 0204229N. Year over year it falls 70% against FY2026.

Funding trajectory

Project 4032 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25017.1FY25ACTUAL24.9FY26ENACTED7.5FY27REQUEST1.5FY281.2FY291.1FY301.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual17.1
FY2026Enacted24.9
FY2027Request7.5
FY2028Outyear1.5
FY2029Outyear1.2
FY2030Outyear1.1
FY2031Outyear1.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

NAV/COMMs▼ 70%
FY2025 actual$17.1M
FY2026 enacted$24.9M
FY2027 request$7.5M

Continue radio redesign development, complete Preliminary Design Review, prepare for the Critical Design Review and begin building engineering units to be delivered in FY 2028.

Project 4032 — every activity in full →
Who's building it

Named performers on project 4032

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$3.4M · 46%
NAWC-AD
$0.9M · 12%
NAWCAD
$0.3M · 3.4%
Project detail

What project 4032 buys

TACTOM missile Navigation and Communications (NAV/COMMs) capability consists of a government furnished TACTOM radio, a government furnished crypto unit, and NAV/COMM specific test equipment. This capability enables the Tomahawk Weapon System (TWS) to utilize an Advanced Communications Architecture (ACA) network for secure tactical communications. The Tomahawk Weapons System (TWS) provides a deep strike land attack capability (Tomahawk Land Attack Missile (TLAM)) and can be launched from both surface ships and submarines via the Tactical Tomahawk Weapons Control System (TTWCS). The ACA Phase II will provide additional capability. Details available at a higher classification. The TACTOM Block V Integrated Single Box Solution (ISBS) radio redesign provides improved Communication (Comms) through the use of an improved software that will expand the platform's capabilities and avoids component obsolescence. The ISBS radio is utilized to send in-flight retargeting commands, employ "loiter" tactic, and transmit health and status.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$0.0M
▼ 99% vs FY2025
FY2025 Actual
$3.9M
Prior year

TOMAHAWK — one RDT&E project inside PE 0204229N. Congressional marks are recorded on the program element, not on a project.

Project 0545 — TOMAHAWK — requests $0.0M in FY2027, 0.0% of the $76.7M requested for program element 0204229N. Year over year it falls 100% against FY2026.

Funding trajectory

Project 0545 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

03.9FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual3.9
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Guidance Electronics Unit - Redesign (GEU-R)▼ 100%
FY2025 actual$3.9M
FY2026 enacted$0.0M
FY2027 request$0.0M

FY2026 to FY2027 change Decrease in program funding due to completion of effort fully funded in FY 2026.

FY2026 plans — current year FY 2026 Mandatory funding in the amount of $20.175M will support GEU-R Hardware Redesign efforts for obsolescence in critical components and development of solutions to ensure reliability and interoperability.

Project detail

What project 0545 buys

The Tomahawk Weapons System (TWS) provides an all-weather, long-range, deep strike offensive capability against fixed, mobile, and maritime targets, and can be launched from surface ships and ground platforms and submarines via the Tactical Tomahawk Weapons Control System (TTWCS). The Guidance Electronics Unit - Redesign (GEU-R) will improve capability and increase missions supported by increasing the GEU-R's computer power and speed. The redesign will centralize the housing of the electronic cards for navigation, guidance, flight control, pyro & power control, mission control (MC), and secondary power. The GEU-R manages all missile monitoring and control functions (navigation, communications, guidance, speed, attitude, health, component power application timing/activation of discrete events).

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services