RDT&E Program Element · President's Budget PB2027

Long Range Precision Fires Advanced Technology

PE 0603464A·U.S. Army·Approp. 2040 — RDT&E·BA3 — Advanced Technology Development
FY2027 Request
$422.6M
⚑ Contested — House adds 1.8%
HitchAI read

U.S. Army funding ramps 129% to a $422.6M request in FY2027 — the program's peak, before stepping down 65% across the five-year plan. In the FY2027 defense authorization, the House added 1.8% (to $430.1M); the Senate added 1.8% (to $430.1M); House appropriators added 12% (to $474.1M).

FY2027 Request
$422.6M
▲ 129% vs FY2026
House mark
$430.1M
▼ $7.5M vs request
FY2026 Enacted
$184.2M
In law

Roll-up of 6 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $422.6M for Long Range Precision Fires Advanced Technology under RDT&E program element 0603464A, up 129% over FY2026. In the FY2027 defense authorization, House moved to raise it to $430.1M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

1002003004000174.2FY25ACTUAL184.2FY26ENACTED422.6FY27REQUEST173.9FY28159.1FY29152.8FY30149.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual174.2
FY2026Enacted184.2
FY2027Request422.6
FY2028Outyear173.9
FY2029Outyear159.1
FY2030Outyear152.8
FY2031Outyear149.8
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 3 — Advanced Technology Development.

Complete
Research
BA 1–2
Current
Advanced Technology
BA 3
Later
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

6 projects roll up into PE 0603464A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 129% overall, which can hide much larger swings below.

The whole program

PRSM is funded on 5 lines across 2 appropriations

This page shows $224.8M of PRSM, 13% of the program's $1.74B FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
PRECISION STRIKE MISSILE (PRSM)ProcurementArmy1,226.5
PrSM Increment 2RDT&EArmy204.4
Precision Strike Missile (PrSM)RDT&EArmy45.3
PrSM Increment 4RDT&EArmy38.6
PRSM totalArmy1,739.6

Lines whose title names the program. 17 further lines only mention PRSM in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$422.6M
House NDAA (HASC)HASC
$430.1M +$7.5M · +1.8%
Senate NDAA (SASC)SASC
$430.1M +$7.5M · +1.8%
House Approps (HAC-D)HAC_D
$474.1M +$51.5M · +12%
▲ $44.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

This Program Element (PE) matures and demonstrates Long Range Precision Fires (LRPF) technologies to destroy, neutralize, or suppress the enemy by cannon artillery and missile fire and enable integration of fire support assets into combined arms operations. Major Focus Areas for LRPF Science and Technology include: Missiles, Cannon Artillery, and Supporting LRPF Technologies covering Strategic, Operational and Tactical Lines of Effort. LRPF Missiles Advanced Development matures and demonstrates a broad range of Missile technologies to enhance Army integrated LRPF capabilities at extended range.

Project CZ8, DM5, AF2, BY2, CE9, BO8 — PrSM Modular Payload Advanced Development
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House do to this request, and what is still unresolved?Which project inside PE 0603464A is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603464A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Long Range Precision Fires Advanced Technology (PE 0603464A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603464A
Machine access
Markdown twin /programs/0603464A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$224.8M
▲ 204% vs FY2026
FY2026 Enacted
$74.1M
▲ 95% vs FY2025
FY2025 Actual
$38.0M
Prior year

PrSM Modular Payload Advanced Development — one RDT&E project inside PE 0603464A. Congressional marks are recorded on the program element, not on a project.

Project CZ8 — PrSM Modular Payload Advanced Development — requests $224.8M in FY2027, 53% of the $422.6M requested for program element 0603464A. Year over year it grows 204% against FY2026.

Funding trajectory

Project CZ8 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150200038.0FY25ACTUAL74.1FY26ENACTED224.8FY27REQUEST80.4FY2882.0FY2950.2FY3049.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual38.0
FY2026Enacted74.1
FY2027Request224.8
FY2028Outyear80.4
FY2029Outyear82.0
FY2030Outyear50.2
FY2031Outyear49.7
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$2.8M
FY2026 enacted$10.0M
FY2027 request$41.6M

Will mature submunition guidance, targeting, and collaboration algorithms through Hardware-in-the-loop testing, validate submunition dispense mechanism from PrSM with two dynamic dispense demonstrations, refine the high-fidelity six-degree of freedom model, and conduct design reviews. Mature Tactical Overmatch Missile Technology (TOMT)…

Read the FY2027 plan →
FY2025 actual$35.2M
FY2026 enacted$64.1M
FY2027 request$98.3M

Will continue to optimize GMLRS dispense mechanism, submunition design, simulations, sensors, and warhead technologies by performing multiple component and system-level demonstrations to include three separation demonstrations delivered by a GMLRS, one flight demonstration with integration of full seeker package and datalinks, and…

Read the FY2027 plan →
Direct Support Fires Tech (DSFT)NEW
FY2025 actual
FY2026 enacted
FY2027 request$84.9M

Will perform initial demonstrations of low-cost rocket design integrated into an expendable rocket canister with a reloadable pod; mature electrical design of reloadable pod interfaces with the launcher; conduct first guided flight demonstration; collaborate with industry partners to mature, fabricate, and demonstrate DSFT rockets…

Project CZ8 — every activity in full →
Project detail

What project CZ8 buys

This project directly supports Precision Fires capabilities by maturing and demonstrating critical technologies for autonomous, Cluster Munition policy compliant, enhanced lethality payloads deployed from Precision Strike Missile to autonomously and cooperatively find and engage the full spectrum of deep moved, moving, dispersed, and poorly located targets in areas with contested access at extended ranges. Direct Support Fires Technology effort matures and demonstrates cost-effective rocket technology to increase the ability to mass fires to achieve lethal effects against artillery targets with initial volley fires to minimize logistics tail and maximize organizational structure, while achieving reduced cost per kill. Tactical Overmatch Missile Technology effort will provide technology maturation to support a ground launched extended range anti-armor maneuverable missile capable of defeating current and future advanced armor threats, active protection systems, and field fortification from both line of sight and beyond line-of-sight (BLOS) cooperative and simultaneous engagements. Work in this project complements Program Element (PE) 0602147A (Long Range Precision Fires Technology). Work in this project is performed by the Aviation & Missile Center (AvMC).

FY2027 Request
$94.2M
▲ 18707% vs FY2026
FY2026 Enacted
$0.5M
In law

Affordable High Speed Strike — one RDT&E project inside PE 0603464A. Congressional marks are recorded on the program element, not on a project.

Project DM5 — Affordable High Speed Strike — requests $94.2M in FY2027, 22% of the $422.6M requested for program element 0603464A. Year over year it grows 18707% against FY2026.

Funding trajectory

Project DM5 funding, FY2026–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25507500.5FY26ENACTED94.2FY27REQUEST23.1FY2823.8FY2952.2FY3052.5FY31
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted0.5
FY2027Request94.2
FY2028Outyear23.1
FY2029Outyear23.8
FY2030Outyear52.2
FY2031Outyear52.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual
FY2026 enacted$0.5M
FY2027 request$94.2M

Will continue to define and document operational objectives based on mission analysis; continue to perform modeling and simulation to refine desired system performance characteristics; select multiple industry partner missile system concepts for further technology maturation; conduct an initial design review for each missile concept…

Read the FY2027 plan →
Project DM5 — every activity in full →
Project detail

What project DM5 buys

This project directly supports Precision Fires capabilities by developing, maturing, and demonstrating affordable high speed strike missile technologies for responsive, mobile, deployable, survivable, and sustainable Army conventional theater strike weapons unconstrained by previous treaties. Provide hardware and software technologies demonstrated, including affordable advanced propulsion, complementary warhead, guidance, navigation and control technologies, and integration onto Army mobile launch platforms. The Army needs affordable, responsive high speed strike capability to attack theater level targets, provide offensive counter-air capability, and be launched from Army mobile, deployable, and survivable platforms. Work in this project complements Program Element (PE) 0603464A (Long Range Precision Fires Advanced Technology) / Project BY2 (Advanced Hypersonics Technology), PE 0602147A (Long Range Precision Fires Technology) / Project AF8 (Affordable Extended Range Precision Tech and Program) and Project AF3 (Extended Range Propulsion Tech) Work in this project is performed by the Aviation & Missile Center (AvMC).

FY2027 Request
$62.5M
▼ 9.5% vs FY2026
FY2026 Enacted
$69.0M
▼ 23% vs FY2025
FY2025 Actual
$89.2M
Prior year

Long Range Maneuverable Fires (LRMF) Advanced Tech — one RDT&E project inside PE 0603464A. Congressional marks are recorded on the program element, not on a project.

Project AF2 — Long Range Maneuverable Fires (LRMF) Advanced Tech — requests $62.5M in FY2027, 15% of the $422.6M requested for program element 0603464A. Year over year it falls 9.5% against FY2026.

Funding trajectory

Project AF2 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075089.2FY25ACTUAL69.0FY26ENACTED62.5FY27REQUEST20.5FY2816.4FY2921.2FY3020.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual89.2
FY2026Enacted69.0
FY2027Request62.5
FY2028Outyear20.5
FY2029Outyear16.4
FY2030Outyear21.2
FY2031Outyear20.8
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Long Range Maneuverable Fires (LRMF) Advanced Tech▼ 100%
FY2025 actual$89.2M
FY2026 enacted$69.0M
FY2027 request

Conduct a series of integrated booster and ramjet demonstrations of propulsion engine concepts to validate performance of the air-breathing propulsion for long range fires; optimizes and matures models to simulate integrated objective system performance; matures seeker/sensor integration for optimal performance and precision; improves…

FY2025 actual
FY2026 enacted
FY2027 request$24.6M

Will conduct a comprehensive baseline computational analysis to quantify the lethality of existing warhead designs and to refine and compare with a warhead using a CL-20 based energetic formulation; mature design and begin development of novel warhead technologies and components.

Read the FY2027 plan →
Low Cost Cruise Missile (LCCM) EnhancementsNEW
FY2025 actual
FY2026 enacted
FY2027 request$37.9M

Will mature and conduct demonstrations of LCCM technologies, to include payload options to increase operational capability, a common booster for ground launch of air launched munitions, and integration concepts for currently fielded Army launchers; conduct design integration reviews with LCCM vendors.

Project AF2 — every activity in full →
Project detail

What project AF2 buys

This project directly supports Precision Fires capabilities by developing, maturing and demonstrating next generation Multi-Domain Operations extended range weapon system technology for Precision Strike Missile to increase survivability, penetration, and range in complex Anti Access/Area Denial (A2/AD) and denied environments. This project also includes both the maturation and demonstration of advanced extended range missile technology and autonomous, unmanned launcher technology. The combination of these technologies offers the potential to dramatically increase force projection through increases in range, firepower, and magazine depth. Work in this project complements Program Element (PE) 0602147A (Long Range Precision Fires Technology) / Project AF8 (Affordable Extended Range Precision) and Project AF3 (Extended Range Propulsion Tech). Work in this project is performed by the Aviation & Missile Center (AvMC).

FY2027 Request
$26.7M
▲ 170% vs FY2026
FY2026 Enacted
$9.9M
▼ 76% vs FY2025
FY2025 Actual
$41.7M
Prior year

Advanced Hypersonic Technology — one RDT&E project inside PE 0603464A. Congressional marks are recorded on the program element, not on a project.

Project BY2 — Advanced Hypersonic Technology — requests $26.7M in FY2027, 6.3% of the $422.6M requested for program element 0603464A. Year over year it grows 170% against FY2026.

Funding trajectory

Project BY2 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25041.7FY25ACTUAL9.9FY26ENACTED26.7FY27REQUEST29.7FY2816.3FY2914.2FY3011.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual41.7
FY2026Enacted9.9
FY2027Request26.7
FY2028Outyear29.7
FY2029Outyear16.3
FY2030Outyear14.2
FY2031Outyear11.7
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$41.7M
FY2026 enacted$9.9M
FY2027 request$26.7M

Will mature biological synthesis and biomanufacturing to produce multi-kilogram quantities of energetic materials for formulation assessments; design and develop AI models for additional bio-reachable precursors for advanced energetics applications; begin conducting experiments for scale-up of next precursor molecule; designs and…

Read the FY2027 plan →
Project BY2 — every activity in full →
Project detail

What project BY2 buys

This project directly supports Precision Fires capabilities by developing and maturing critical technologies for strategic missiles. Technology development includes critical technologies to improve strategic missile components such as advanced structures and materials, thermal protection systems, navigation systems, data links, and seekers/terminal sensors. Work in this project complements Program Element (PE) 0603464A (Long Range Precision Fires Advanced Technology) / Project AF2 (Long Range Maneuverable Fires (LRMF) Advanced Tech); PE 0603464A (Long Range Precision Fires Advanced Technology) / Project DM5 (Affordable High Speed Strike), and PE 0602147A (Long Range Precision Fires Technology) / Project AF8 (Affordable Extended Range Precision Technology). Work in this project is performed by the Aviation & Missile Center (AvMC) and Army Research Laboratory (ARL).

FY2027 Request
$14.4M
▲ 153% vs FY2026
FY2026 Enacted
$5.7M
▲ 7.7% vs FY2025
FY2025 Actual
$5.3M
Prior year

Armaments Advanced Technology — one RDT&E project inside PE 0603464A. Congressional marks are recorded on the program element, not on a project.

Project CE9 — Armaments Advanced Technology — requests $14.4M in FY2027, 3.4% of the $422.6M requested for program element 0603464A. Year over year it grows 153% against FY2026.

Funding trajectory

Project CE9 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

05.3FY25ACTUAL5.7FY26ENACTED14.4FY27REQUEST20.2FY2820.6FY2915.0FY3015.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual5.3
FY2026Enacted5.7
FY2027Request14.4
FY2028Outyear20.2
FY2029Outyear20.6
FY2030Outyear15.0
FY2031Outyear15.1
Inside the project

5 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Strategic Armaments Advanced Tech▲ 9%
FY2025 actual$5.3M
FY2026 enacted$3.9M
FY2027 request$4.3M

Will mature multi-modal seeker technologies to support electro-optical/infrared and radio frequency (RF) synthetic aperture radar imaging sensors; exploit hardware in the loop to mature precision technologies for in-flight and terminal engagement; mature advanced RF effects to improve in-flight munition survivability.

Zonable Artillery Propulsion System▼ 100%
FY2025 actual
FY2026 enacted$0.9M
FY2027 request

Will mature ignition system performance for artillery charge systems by leveraging advanced propellent initiation mechanisms.

Multidomain Artillery Munition Adv Tech▲ 556%
FY2025 actual
FY2026 enacted$0.8M
FY2027 request$5.4M

Will demonstrate payloads at sub-scale level; validate structural configurations and form/fit/function of component technology in an integrated payload configuration; mature payload designs for integration into munition and begin validation of functionality.

Accurate Affordable Indirect Massed Fires (AAIM)NEW
FY2025 actual
FY2026 enacted
FY2027 request$2.5M

Will mature a suite of targeting technologies to achieve reduced dispersion; begin validating technologies via modeling of incremental improvements to dispersion.

Armament Based BOP MitigationNEW
FY2025 actual
FY2026 enacted
FY2027 request$2.2M

Will provide upgrade kits to upgrade M777; demonstrate manned firing via soldier touch points and user engagements in support of a Transformation in Contact (TiC) event.

Project CE9 — every activity in full →
Project detail

What project CE9 buys

Improve defeat of imprecisely located and relocated/moving targets by leveraging and advancing component technologies in armament technologies (multi-mode g-hardened seekers for cross spectrum targeting, advanced guidance, navigation, and control (GNC) and in-flight update technologies). Work in this project complements PE 0602141A (Lethality Technology) / Project AH9 (Advanced Warheads Technology) and PE 0602147A (Long Range Precision Fires Technology) / Project AG4 (Extended Range Artillery Munition Suite Technology) and Project BN5 (Fuze and Power for Munitions). Work in this project is performed by the Armaments Center (AC).

FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$25.0M
In law

Long Range Precision Fires Advanced Tech (CA) — one RDT&E project inside PE 0603464A. Congressional marks are recorded on the program element, not on a project.

Project BO8 — Long Range Precision Fires Advanced Tech (CA) — requests in FY2027, 0.0% of the $422.6M requested for program element 0603464A. Year over year it falls 100% against FY2026.

Funding trajectory

Project BO8 funding, FY2026–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25025.0FY26ENACTED
Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted25.0
Project detail

What project BO8 buys

Congressional Interest Item funding provided for Long Range Precision Advanced Technology. The cited work is consistent with the Under Secretary of War for Research and Engineering priority focus areas and the Army Modernization Strategy.