R-2A Activity · President's Budget PB2027

Logistics

FY2027 Request
$10.3M
▲ 5050% vs FY2026
HitchAI read

This activity requests $10.3M in FY2027, 8.9% of project 2223, up 5050% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$10.3M
▲ 5050% vs FY2026
FY2026 Enacted
$0.2M
▼ 98% vs FY2025
FY2025 Actual
$10.3M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 2223 of PE 0603640M. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continue: - Development of adaptive morphing materials that allow for tire overall stiffness control in less than three minutes. - Testing and demonstration of mission planning tactical logistics predictive and analytic tools at fleet exercises. Complete: - Research to advance the broad range of technologies to demonstrate the military utility of enhancing combat capability by increasing energy production, storage, distribution, and curbing energy consumption of the individual Marine and other tactical assets with a particular emphasis on supporting distributed operations. Initiate: - Advanced research development for distributes acoustic sensing efforts tailored to unique expeditionary threat detection applications. - Next-generation fuel cell technology to enable record unmanned aerial system flight persistence and increased payload capacity.

FY2026 to FY2027 change

The increase in funding from FY 2026 to FY 2027 is due to the initiation of (1) advanced research development to distribute acoustic sensing efforts tailored to expeditionary threats and (2) next-generation fuel cell technology to enable record unmanned aerial system flight persistence and payload capacity.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Continue to advance the broad range of technologies to demonstrate the military utility of enhancing combat capability by increasing energy production, storage, distribution, and curbing energy consumption of the individual Marine and other tactical assets with a particular emphasis on supporting distributed operations. - Continue development of adaptive morphing materials that allow for tire overall stiffness control in less than three minutes. - Complete a research effort to research and develop solutions for safe and effective integration of Lithium-ion 6T batteries into soon-to-field energy storage platforms. - Complete to design and deliver a full-scale autonomy-ready system consisting of an Unmanned Surface Vessel (USV) capable of towing logistics. The effort will also demonstrate integrated system at-sea in required sea-state conditions. - Complete Navy and US Marine Corps development of class of supply III (fuel) and V (munitions) dynamic calculators into a common data framework. - Initiate testing and demonstration of mission planning tactical logistics predictive and analytic tools at fleet exercises.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

010.3FY25ACTUAL0.2FY26ENACTED10.3FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual10.3
FY2026Enacted0.2
FY2027Request10.3

This activity is 8.9% of project 2223's FY2027 request and 3.6% of PE 0603640M's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

8 activities in project 2223

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0603640M, project 2223 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0603640M/2223/a6.md · MCP mcp.hitchintel.combudget_get_activity