R-2A Activity · President's Budget PB2027

Electro-Magnetic Battlespace Shaping and Protection (EM-BSP)

Activity a14·Project AX3 — Technology Maturation Initiatives·PE 0604115A·U.S. Army
FY2027 Request
$10.8M
▼ 42% vs FY2026
HitchAI read

This activity requests $10.8M in FY2027, 3.4% of project AX3, down 42% on FY2026. The R-2A exhibit describes it across FY2025–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$10.8M
▼ 42% vs FY2026
FY2026 Enacted
$18.6M
▲ 76% vs FY2025
FY2025 Actual
$10.6M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project AX3 of PE 0604115A. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Design and development of the prototype RF Smoke solution to disrupt the electromagnetic spectrum, effectively masking, concealing, and preserving combat lethality overmatch in contested environments. This will involve refining system architecture, integrating key components, and ensuring the solution meets operational requirements. Live-fire testing will be conducted to evaluate and demonstrate the RF Smoke's operational performance, including its effectiveness in real-world scenarios and its ability to achieve mission objectives. Upon successful testing and validation, the prototype will transition to the Program Executive Office (PEO) for further refinement, production planning, and eventual fielding to operational units.

FY2026 to FY2027 change

The funding reduction aligns with the efforts plan, reflecting the completion of the prototype system's design and development phase in preparation for live testing and experimentation.

Before the request year

FY2025–FY2026: what came before

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Complete RF Smoke prototype fabrication. Complete integration into EWPMT and AFATDS Command and Control Functions. Complete evaluation and assessment of prototype RF Smoke solution capabilities to disrupt the EM spectrum to mask, conceal, and preserve combat lethality overmatch.

FY2025 accomplishments

Begin prototyping activities across multiple Program Executive Offices (PEOs) to support an end-state integrated SoS demonstration. Virtually prototype the SoS architecture.?Refine system and subsystem requirements and interfaces. Prototype RF Smoke technology candidates across EM spectrums of interest and initiate design-of-experiment analysis for optimal material payload mix against target sets. Virtually prototype dispense mechanism to aid in RF Smoke material candidate analysis for a Cargo Rocket/Missile application. Define application interfaces, virtually prototype RF Smoke effects model software for battle management of the smoke across Electronic Warfare and artillery fire control systems.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

010.6FY25ACTUAL18.6FY26ENACTED10.8FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual10.6
FY2026Enacted18.6
FY2027Request10.8

This activity is 3.4% of project AX3's FY2027 request and 3.4% of PE 0604115A's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

28 activities in project AX3

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Electronic Warfare (EW) / Counter-Unmanned Aircraft Systems (C-UAS)$61.1M ▲ 178%Weapons and Fires$46.7M ▲ 18%Intelligence and Sensing$32.1M ▲ 192%Iron Sense$31.7M ▲ 1%Soldier System and Expeditionary Support$28.7M ▲ 70%Corps and Division Prototyping$28.1M NEWArmy Service Component Command (ASCC) Prototyping$25.1M NEWAir and Ground Platforms$20.0M ▲ 181%Networks, Command, Control, Communications, and Position Navigation and Timing$15.2M ▲ 63%Critical Common Electronics for Scalable Unmanned Aircraft Systems$12.0M ▲ 20%
Electro-Magnetic Battlespace Shaping and Protection (EM-BSP) — this activity$10.8M ▼ 42%
Expeditionary Field Artillery Sensor (ExFAS)$3.1M ▼ 77%
Autonomous Operations for Unmanned Aerial Systems (UAS)
Air Launched Effects (ALE) Off-board Survivability
Tactical Analytics Architecture (TA2)
Tactical Navigation Warfare (NAVWAR) Plexus
Assured Navigation for Future Tactical Unmanned Aerial Systems (FTUAS)
Reconfigurable Aperture Precision Targeting Radar (RAPTR) for Vehicle and Dismount Exploitation Radar (VADER) (RADER)
Lightweight Polymers for Modern Small Caliber Apps - Ammo Casing Only
Optical Threat Detection
Solid State High Power Microwave System (SS-HPM)
Collaborative Links for Integrated Fires (CLIF)
Multi-Network, Multi-Waveform Software Defined Radio▼ 100%
Consolidated prototype platform for Joint Common Artificial Intelligence / Autonomous Operations, Data architectures, and Power systems▼ 100%
Next Generation Command and Control (NGC2) Prototyping
Aviation Lightweight Armor▼ 100%
Combination Soldier and Logistics Aerial Insertion (Combodrop)▼ 100%
Containerized Weapon System - Counter UAS▼ 100%
Source
FY2027 Department of the Army RDT&E Budget Justification · Exhibit R-2A · PE 0604115A, project AX3 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0604115A/AX3/a14.md · MCP mcp.hitchintel.combudget_get_activity