Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $88.9M for Multi-Mission Helicopter Upgrade Dev under RDT&E program element 0604216N, down 22% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 63.9 |
| FY2026 | Enacted | 114.1 |
| FY2027 | Request | 88.9 |
| FY2028 | Outyear | 215.5 |
| FY2029 | Outyear | 179.8 |
| FY2030 | Outyear | 195.9 |
| FY2031 | Outyear | 151.2 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
3 projects roll up into PE 0604216N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -22% overall, which can hide much larger swings below.
MH-60 Service Life Modernization
Congressional Adds
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 38% | 33.6 |
| Government labs & warfare centers | 0.1% | 0.1 |
| Other / unspecified | 62% | 55.1 |
| FY2027 request | 100% | 88.9 |
Mission & acquisition strategy
The MH-60R/S program pursues upgrades and enhancements that pace the rapidly evolving threat and improve safety-of-flight for its pilots and aircrew. These efforts include improvements to existing sensors, network capabilities, weapon systems, avionics, communications, and navigation systems as well as integration of modern precision guided air-to-ground and air-to-air missiles, fixed-forward and crew-served weapons, the Sensor Operator Console, data-fusion capability, and cUAS.
MH-60 SLM will begin with two phased Middle Tier of Acquisition (MTA) rapid prototyping development efforts to create the TALON prototype: 1) the Flight Critical Avionics Segment (FCAS) and Digital Backbone (DBB) prototype and 2) development and integration of the Mission Systems and Weapons Segment (MSWS). The competitive award of OTAs for both MTA development efforts will be a phased approach. Due to the competitive nature of the effort, specific details are withheld at this time to protect the integrity of the acquisition process. FY 2027 funds lay the groundwork for multiple contract awards (including OTAs) in FY 2028.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what Lockheed Martin has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604216N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksMH-60 Development — one RDT&E project inside PE 0604216N. Congressional marks are recorded on the program element, not on a project.
Project 1707 — MH-60 Development — requests $56.4M in FY2027, 63% of the $88.9M requested for program element 0604216N. Year over year it falls 13% against FY2026.
Project 1707 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 59.1 |
| FY2026 | Enacted | 64.8 |
| FY2027 | Request | 56.4 |
| FY2028 | Outyear | 43.3 |
| FY2029 | Outyear | 39.1 |
| FY2030 | Outyear | 33.3 |
| FY2031 | Outyear | 34.2 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continue activities for System Configuration development. Continue integration and testing of the interim EGI solution for M-code. Continue development efforts for MH-60 Air Vehicle, Avionics and Mission Systems DMSMS solutions to include AFCC, Radar, Acoustic Processor (AP) and Software Defined Sonobuoy Receiver (SDSR), and CDL…
Read the FY2027 plan →Continue to provide MH-60 engineering support, integrated logistics support, government furnished equipment, support equipment, program management, contract support services, and travel to support Radar Tech Refresh, System Configuration activities, CDL, AFCC, Acoustics, CMPC, and Tactical Data Links, to include data review, deficiency…
Continue System Configuration testing (SC28 and SC30), Avionics Obsolescence, MIDS JTRS Advanced Capabilities, and Radar Tech Refresh in support of Minotaur test and evaluation activities. Obsolescence Solution test and evaluation planning. Continue federated system testing. Identify and develop test infrastructure and support building…
Named performers on project 1707
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 1707 buys
The MH-60R/S program pursues upgrades and enhancements that pace the rapidly evolving threat and improve safety-of-flight for its pilots and aircrew. These efforts include improvements to existing sensors, network capabilities, weapon systems, avionics, communications, and navigation systems as well as integration of modern precision guided air-to-ground and air-to-air missiles, fixed-forward and crew-served weapons, the Sensor Operator Console, data-fusion capability, and cUAS. The program is continuously evaluating Diminishing Manufacturing Sources and Material Shortages (DMSMS) and making incremental improvements to various airframe, flight safety, mission systems, training systems and mission-planning systems. The program will continue development of architecture to support integration of secure, over-the-horizon communications in addition to modern en route navigation and terminal approach systems. MH-60R/S research and development initiatives include targeted improvements of the platform's cybersecurity posture, continued development of federated systems to rapidly field new capabilities, and development of Air Launched Effects (ALE). FY 2027 budget request funds the following: 1. System Configuration (SC) capability increases, Modernized Tactical Networks (to include Enhanced Throughput (ET) and Tactical Targeting Network Technology (i.e. mesh networks)), Radar Hardware and Software enhancements in support of Minotaur Family of Systems (MFoS), DMSMS solutions for the Air Vehicle, Mission Systems and Avionics, to include MH-60 Displays, Embedded Global Positioning System(GPS)/Inertial Navigation System (INS), Beyond Line of Sight (BLOS) data transfer, Radar technical refresh, Airborne Low Frequency Sonar (ALFS), Common Datalink (CDL), Interface Unit Automatic Data Processing (IUADP) and Advanced Flight Control Computer obsolescence redesign. Obsolescence issues are expected to impact MH-60 readiness/availability beginning in FY27 and may require interim solutions until the MH-60 SLM development and fielding is completed. 2. Integration of the updated Link 16 Advanced Capabilities software and Tactical Networking (i.e. mesh network) to enable over-the-horizon targeting, enhance target sorting, and serve as a force multiplier in network enabled and long-range maritime targeting weapon engagements. 3.
- Product Development
- Support
- Test and Evaluation
- Management Services
MH-60 Service Life Modernization — one RDT&E project inside PE 0604216N. Congressional marks are recorded on the program element, not on a project.
Project 1709 — MH-60 Service Life Modernization — requests $32.5M in FY2027, 37% of the $88.9M requested for program element 0604216N. It is a new start — no prior-year or current-year money.
Project 1709 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 32.5 |
| FY2028 | Outyear | 172.2 |
| FY2029 | Outyear | 140.7 |
| FY2030 | Outyear | 162.5 |
| FY2031 | Outyear | 117.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Develop the preliminary design of the TALON FCAS and DBB segments through award of initial contract. Establish government support for SLM requirements. Initiate development of acquisition documentation for TALON MTA efforts. Identify and develop test infrastructure and support building initial test development requirements for SLM…
Named performers on project 1709
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 1709 buys
Under SLM, the MH-60 program will develop an open agile architecture that resolves multiple obsolescence issues within the flight critical avionics, and mission systems that can rapidly respond to emerging threats and fleet requirements ensuring the MH-60 continues to be a relevant, supportable, and cost-effective platform. FY 2027 budget request funds the following: 1. Initiate development of acquisition documentation for TALON Middle-Tier-of-Acquisition prototypes 2. Refine the TALON System Model for both the Flight Critical Avionics Segment (FCAS) and the Mission Systems and Weapon Segment (MSWS) 3. Award initial contract for the preliminary design of the FCAS and Digital Backbone (DBB) 4. Identify and develop test infrastructure and support building initial test development requirements for SLM efforts 5. FY 2027 funds lay the groundwork for multiple contract awards (including OTAs) in FY 2028
- Product Development
- Support
- Test and Evaluation
- Management Services
Congressional Adds — one RDT&E project inside PE 0604216N. Congressional marks are recorded on the program element, not on a project.
Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $88.9M requested for program element 0604216N. Year over year it falls 100% against FY2026.
Project 9999 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 4.8 |
| FY2026 | Enacted | 49.2 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
What project 9999 buys
FY 2025 Congressional Capability Upgrade funding of $4.827 million will fund the development, integration and testing of the proliferated Low Earth Orbit (pLEO) Skyhook System and the Kraken 18 Communication Pod as federated systems onto the MH-60. The FY 2026 Beyond Line of Sight (BLOS) Congressional upgrade funding of $9.653M will fund pursuing upgrades and enhancements to pace the rapidly evolving threat landscape and improve flight safety. Key efforts include the development, integration, and testing of a resilient, multi-waveform communication architecture for aviation platforms. The primary objective is to ensure robust, high-throughput connectivity across Line-of-Sight (LOS) and BLOS environments to support modern warfighting concepts. These initiatives are critical for enhancing battlespace awareness, enabling network-enabled weapon engagements, and providing secure data transport for Command and Control (C2) across distributed forces. The FY 2026 Capability Congressional upgrade funding of $9.654M will fund critical modernization and supportability efforts for the MH-60R/S to enhance system reliability, improve cybersecurity, and expand mission planning capabilities. Funds will support improvements to system maintainability, acquiring essential data rights for Link-16, implementing a cyber bus monitoring solution, developing a common mission planning tool for Anti-Submarine Warfare (ASW), and providing test and evaluation support for the Minotaur family of systems. These efforts are essential for maintaining the operational effectiveness of the MH-60 fleet and ensuring it can meet current and future mission demands. The FY 2026 Mission Systems Modernization Congressional upgrade funding of $29.926M will fund Digital Engineering Environment development including Living Laboratory and DevSecOps Pipeline development. Additionally, funds will be provided for Modular Architecture for Survivability and Targeting (MAST) prototype development that will enhance MH-60 passive sensing and targeting capabilities. Funds will also address Airborne Mine Countermeasures (AMCM) obsolescence re-design efforts for the MH-60.
- Product Development
- Support
- Test and Evaluation