RDT&E Program Element · President's Budget PB2027

Air Control

PE 0604504N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$41.6M
◆ Scaling +74%
HitchAI read

U.S. Navy funding ramps 74% to a $41.6M request in FY2027, before stepping down 47% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. NAWCAD leads the industry work.

FY2027 Request
$41.6M
▲ 74% vs FY2026
FY2026 Enacted
$23.9M
▼ 60% vs FY2025
FY2025 Actual
$60.5M
Prior year

Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $41.6M for Air Control under RDT&E program element 0604504N, up 74% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550060.5FY25ACTUAL23.9FY26ENACTED41.6FY27REQUEST37.5FY2836.6FY2929.8FY3022.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual60.5
FY2026Enacted23.9
FY2027Request41.6
FY2028Outyear37.5
FY2029Outyear36.6
FY2030Outyear29.8
FY2031Outyear22.1
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

4 projects roll up into PE 0604504N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 74% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$41.6M
House NDAA (HASC)HASC
$41.6M full · +$0
Senate NDAA (SASC)SASC
$41.6M full · +$0
House Approps (HAC-D)HAC_D
$41.6M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

NAWCAD
$22.6M · 54%
Primary HDW Develop - MATCALS
SAAB
$15.4M · 37%
Primary HDW Develop- SPN50 (V)3 · CPIF
Where FY2027 funding flowsShare$M
Industry primes98%40.9
Government labs & warfare centers1.7%0.7
FY2027 request100%41.6
See NAWCAD's full federal contract ledger members
Program detail

Mission & acquisition strategy

Shipboard Air Traffic Control systems, interfacing with versions of the AN/TPX-42A(V) Direct Altitude and Identity Readout (DAIR), allow shipboard Air Traffic Controllers to identify, marshal, and direct aircraft within a 50 Nautical Mile (NM) radius of the ship. In recent years, the top 25 percent of the AN/SPN-43C frequency band has been reallocated to the Fixed Wireless Access Community prohibiting Air Traffic Control (ATC) Air Search Radar (ASR) operation within 50NM of the coast.

Landing System Upgrade Program consists of lifecycle extension upgrades to the AN/SPN-35C Precision Approach Radar, AN/SPN-41B Instrument Control Landing Systems and AN/SPN-46 Automatic Carrier Landing Systems, all of which support Air Traffic Control (ATC) operations on board CVN, LHA, and/or LHD-class ships. This effort includes numerous commercial off-the-shelf (COTS) component refresh updates which are urgently needed to sustain the operational viability of these Naval ATC systems supporting fleet air operations until at least 2040, until the next generation ATC system is fully implemented.

Project 0993, 3372, 0718, 1657 — Carrier ATC
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0604504N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what NAWCAD has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604504N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Air Control (PE 0604504N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604504N
Machine access
Markdown twin /programs/0604504N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$25.8M
▲ 210% vs FY2026
FY2026 Enacted
$8.3M
▼ 3.3% vs FY2025
FY2025 Actual
$8.6M
Prior year

Carrier ATC — one RDT&E project inside PE 0604504N. Congressional marks are recorded on the program element, not on a project.

Project 0993 — Carrier ATC — requests $25.8M in FY2027, 62% of the $41.6M requested for program element 0604504N. Year over year it grows 210% against FY2026.

Funding trajectory

Project 0993 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2508.6FY25ACTUAL8.3FY26ENACTED25.8FY27REQUEST21.4FY2820.2FY2913.9FY306.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual8.6
FY2026Enacted8.3
FY2027Request25.8
FY2028Outyear21.4
FY2029Outyear20.2
FY2030Outyear13.9
FY2031Outyear6.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

AN/SPN-50▲ 477%
FY2025 actual$3.9M
FY2026 enacted$3.8M
FY2027 request$22.1M

Procure (V)3 EDM and begin Engineering Change Proposal (ECP) development for the AN/SPN-50(V)3 to address component obsolescence; the (V)2 is no longer procurable after FY27. The (V)3 ECP will replace obsolete parts and integrate modern software solutions that enhance performance and interoperability with other systems. ECP will also…

Read the FY2027 plan →
AN/SPN-43C▼ 54%
FY2025 actual$1.6M
FY2026 enacted$1.5M
FY2027 request$0.7M

Continue developing ECPs for AN/SPN-43C

AN/TPX-42▲ 2%
FY2025 actual$3.1M
FY2026 enacted$3.0M
FY2027 request$3.0M

Continue developing ECPs for Multi-function Console continue, as well as the implementation of Mode 5 which will require a Hardware change to SYY-1 to be able to process Mode 5. This will include the creation of a new ECP to support the efforts. The SPS-48 ECP is also another upgrade that is required to have both software and hardware…

Project 0993 — every activity in full →
Who's building it

Named performers on project 0993

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

SAAB
$15.4M · 60%
NAWCAD
$7.9M · 31%
OPTEVOR
$1.3M · 4.9%
DDG
$0.9M · 3.6%
Project detail

What project 0993 buys

Shipboard Air Traffic Control systems, interfacing with versions of the AN/TPX-42A(V) Direct Altitude and Identity Readout (DAIR), allow shipboard Air Traffic Controllers to identify, marshal, and direct aircraft within a 50 Nautical Mile (NM) radius of the ship. In recent years, the top 25 percent of the AN/SPN-43C frequency band has been reallocated to the Fixed Wireless Access Community prohibiting Air Traffic Control (ATC) Air Search Radar (ASR) operation within 50NM of the coast. Because the Navy requires an air traffic control surveillance radar, this project unit will include engineering efforts to identify requirements and develop the AN/SPN-50(V)1 as an AN/SPN-43C replacement system. In addition, bridging Engineering Change Proposals (ECP) will be required to sustain the AN/SPN-43C capability until the AN/SPN-50(V)1 is completely fielded. Finally, the AN/TPX-42A(V) DAIR continues to undergo several phased upgrades that have resulted in a number of field changes/technology refresh/insertion efforts. System improvements include replacing militarized front-end equipment in the track processor with open architecture Commercial Off the Shelf technology, converting the operational program software to more commonly used and flexible "C" language, providing the "hooks" for potential interface with Mode 5 Identification Friend or Foe, and integrating a flat panel monitor into the controller workstation. The ATC System Shipboard, AN/SYY-1(V) interfaces to emerging sensors as well as those currently in service to improve reliability to the fleet. The embedded training capability of the AN/TPX-42A(V) will carry on to the AN/SYY-1(V). This effort includes addressing broadened CyberSecurity requirements to remain compliant with software CyberSecurity directives and Information Assurance mandates.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$14.5M
▲ 1.4% vs FY2026
FY2026 Enacted
$14.3M
▼ 72% vs FY2025
FY2025 Actual
$50.6M
Prior year

ATC Systems — one RDT&E project inside PE 0604504N. Congressional marks are recorded on the program element, not on a project.

Project 3372 — ATC Systems — requests $14.5M in FY2027, 35% of the $41.6M requested for program element 0604504N. Year over year it grows 1.4% against FY2026.

Funding trajectory

Project 3372 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550050.6FY25ACTUAL14.3FY26ENACTED14.5FY27REQUEST14.7FY2815.0FY2914.4FY3014.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual50.6
FY2026Enacted14.3
FY2027Request14.5
FY2028Outyear14.7
FY2029Outyear15.0
FY2030Outyear14.4
FY2031Outyear14.6
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$0.0M
FY2026 enacted$14.3M
FY2027 request$14.5M

Complete system design of AN/SPN-41 CCA and FPGA upgrades in support of prototype material procurement and build. Development of subsystem test plans ahead of subsequent qualification, ground, and flight testing efforts. Complete preliminary design of AN/SPN-46 Unit 6 and 7 subsystem mod kit supported by component material procurements…

Read the FY2027 plan →
AN/SPN-51 Brizo Landing System
FY2025 actual$50.6M
FY2026 enacted$0.0M
FY2027 request$0.0M

Previous planned efforts (e.g. Critical Design Review (CDR), SIL updates and continued development of AN/SPN-51) are cancelled in alignment with overarching AN/SPN-51 cancellation.

Project 3372 — every activity in full →
Who's building it

Named performers on project 3372

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWCAD
$14.0M · 97%
DDG
$0.5M · 3.3%
Project detail

What project 3372 buys

The Navy's Precision Approach and Landing System Capability (PALC) and Landing System Upgrade Program (LSUP) are essential to retain the United States Navy's capability to perform safe and expeditious aircraft landings aboard CVN and LHA/D class vessels during adverse weather and night conditions. The Navy's PALC requirements, originally identified in the 2013 PALC Roadmap, necessitated Life Cycle Extension upgrades to all three legacy precision landing systems; AN/SPN-35, AN/SPN-41 and AN/SPN-46. The 2013 PALC Roadmap and subsequent LSUP block upgrades addressed obsolete technology developed and fielded over 30 years ago. In 2022, an updated PALC Roadmap was approved and planned to field system upgrades needed to provide PALC to both legacy aircraft and the Air Wing of the Future (AWOTF). These upgrades planned to modernize the AN/SPN-35 and AN/SPN-46 Radar Landing Systems (RLS), as well as insert common sub-systems that minimize future sustainment costs. These development efforts were planned to result in the fielding of a new system, AN/SPN-51, that would replace legacy systems; AN/SPN-35, AN/SPN-41, and AN/SPN-46. In Q1 FY 2025, the 2022 PALC Roadmap update and development efforts were rescinded, thus cancelling AN/SPN-51. Cancellation of the development program necessitates continued research and development of legacy system modifications to ensure sustainment consistent with the 2013 PALC Roadmap requirement. Without these efforts, the Navy estimates complete loss of Precision Approach Radar (PAR) and Automatic Carrier Landing System (ACLS) capabilities within 10 years. Successful development and fielding of all capabilities is essential to giving fleet users relevant equipment, compliant with Cyber Security directives and Information Assurance mandates, and authorized for fleet use.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$0.9M
▲ 2.9% vs FY2026
FY2026 Enacted
$0.9M
▲ 4.0% vs FY2025
FY2025 Actual
$0.9M
Prior year

MATCALS — one RDT&E project inside PE 0604504N. Congressional marks are recorded on the program element, not on a project.

Project 0718 — MATCALS — requests $0.9M in FY2027, 2.2% of the $41.6M requested for program element 0604504N. Year over year it grows 2.9% against FY2026.

Funding trajectory

Project 0718 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.9FY25ACTUAL0.9FY26ENACTED0.9FY27REQUEST1.0FY281.0FY291.0FY301.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.9
FY2026Enacted0.9
FY2027Request0.9
FY2028Outyear1.0
FY2029Outyear1.0
FY2030Outyear1.0
FY2031Outyear1.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

MATCALS Improvements▲ 3%
FY2025 actual$0.9M
FY2026 enacted$0.9M
FY2027 request$0.9M

FY2027 planned work Continue to develop ECPs to mitigate obsolescence issues within the Precision Approach Radar and develop capability to meet the multiple touchdown point capability requirement. Perform operational functionality study and analysis regarding Expeditionary ATC tower capability, and Expeditionary Precision Approach Landing Capability (EPALC) to support Force Design 2030 dated March 2020 improvements.

FY2026 to FY2027 change No significant changes.

FY2026 plans — current year Continue to develop ECPs to mitigate obsolescence issues within the Precision Approach Radar and develop capability to meet the multiple touchdown point capability requirement. Perform operational functionality study and analysis regarding Expeditionary ATC tower capability, and Expeditionary Precision Approach Landing Capability (EPALC) to support Force Design 2030 dated March 2020 improvements.

Who's building it

Named performers on project 0718

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NAWCAD
$0.7M · 75%
NIWC
$0.2M · 25%
Project detail

What project 0718 buys

The Marine Air Traffic Control and Landing Systems (MATCALS) program provides for continued development, integration, and testing of hardware and software to meet requirements for all-weather operations and improved flight safety of Air Traffic Control (ATC) and Landing Systems at Marine Corps expeditionary airfields. An Acquisition Decision Memorandum from Jan 2005 approved the use of the U.S. Army AN/TPN-31 Air Traffic Navigation, Integration, and Coordination System (ATNAVICS) to fulfill the Air Surveillance and Precision Approach Radar and Control System (ASPARCS) requirement for Jul 2006. The ATNAVICS replaced the legacy ATC Precision Approach Radar (PAR), Airport Surveillance Radar (ASR), and Command and Control Subsystem with a High Mobility Multipurpose Wheeled Vehicle based PAR, ASR and Command and Control Subsystem. The Marine Resource Oversight Committee Decision Memorandum 11-2005 of Dec 2004 outlines the evolutionary improvements required by Headquarters Marine Corps. This program works with the Marine ATC Working Group identifying the requirements to implement the preplanned program improvement (P3I) and evolutionary product improvements as required for Ground/Air Task Oriented Radar System (G/ATOR), ATNAVICS, Expeditionary Precision Approach Landing Capability (EPALC), Expeditionary ATC Towers, Common Aviation Command and Control Station (CAC2S), and Navigational Aids that support Marine Air Traffic Control Detachments.

R-3 lines of work
  • Product Development
  • Support
  • Management Services
FY2027 Request
$0.4M
▼ 3.6% vs FY2026
FY2026 Enacted
$0.4M
▼ 2.6% vs FY2025
FY2025 Actual
$0.5M
Prior year

ATC Improvement — one RDT&E project inside PE 0604504N. Congressional marks are recorded on the program element, not on a project.

Project 1657 — ATC Improvement — requests $0.4M in FY2027, 1.0% of the $41.6M requested for program element 0604504N. Year over year it falls 3.6% against FY2026.

Funding trajectory

Project 1657 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.5FY25ACTUAL0.4FY26ENACTED0.4FY27REQUEST0.4FY280.4FY290.5FY300.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.5
FY2026Enacted0.4
FY2027Request0.4
FY2028Outyear0.4
FY2029Outyear0.4
FY2030Outyear0.5
FY2031Outyear0.5
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

NAS MOD VIDS▼ 5%
FY2025 actual$0.2M
FY2026 enacted$0.2M
FY2027 request$0.1M

FY2027 planned work Continue engineering development of Pre-Planned Product Improvement for VIDS to incorporate multiple weather source inputs. Continue STARS and VIDS engineering development for technology insertion. To include VIDs cyber integration efforts and continue engineering efforts to maintain interoperability with the FAA's next generation air traffic control system.

FY2026 to FY2027 change Decrease due to program efficiencies.

FY2026 plans — current year Continue engineering development of Pre-Planned Product Improvement for VIDS to incorporate multiple weather source inputs. Continue STARS and VIDS engineering development for technology insertion. To include VIDs cyber integration efforts and continue engineering efforts to maintain interoperability with the FAA's next generation air traffic control system.

Fleet ATC Systems▼ 3%
FY2025 actual$0.3M
FY2026 enacted$0.3M
FY2027 request$0.3M

FY2027 planned work Continue engineering efforts to maintain interoperability with the FAA's next generation air traffic control system. Continue evaluation of future processor/display, sensor and communication systems.

FY2026 to FY2027 change Decrease due to program efficiencies.

FY2026 plans — current year Continue engineering efforts to maintain interoperability with the FAA's next generation air traffic control system. Continue evaluation of future processor/display, sensor and communication systems.

Project detail

What project 1657 buys

This program provides for engineering development, integration, adaptation, and testing of new and/or modernized Air Traffic Control (ATC) systems, air navigational aids, landing systems, and ATC communication systems for Naval and Marine Corps Air Stations (NAS/MCAS), Fleet ATC Systems, and remote tower improvements. These systems are critical to Naval Aviation and provide for safe, efficient air operations. Additionally, the Federal Aviation Administration (FAA) is affecting major modernization of the National Airspace System (NAS). The Navy must maintain compatibility with FAA-developed ATC systems in order to ensure seamless interoperability within the NAS. NAS modernization initiatives in Project 1657 include the Visual Information Display System (VIDS) and follow-on Pre-Planned Product Improvements, with additional RDT&E efforts required for modified commercial-off-the-shelf ATC systems and equipment for modernization and recapitalization of these systems at our NAS, MCAS & Fleet Area Control & Surveillance Facilities (FACSFACs) worldwide.

R-3 lines of work
  • Product Development
  • Support