Roll-up of 9 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $42.6M for Army Tactical Command & Control Hardware & Software under RDT&E program element 0604818A, down 90% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 100.9 |
| FY2026 | Enacted | 429.2 |
| FY2027 | Request | 42.6 |
| FY2028 | Outyear | 47.4 |
| FY2029 | Outyear | 48.3 |
| FY2030 | Outyear | 49.2 |
| FY2031 | Outyear | 49.7 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
9 projects roll up into PE 0604818A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -90% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.
TACTICAL NETWORK OPERATIONS AND MANAGEMENT
TACTICAL ENHANCEMENT
Unified Network Technology Trans & Integ (UNTTI)
Army Tac C2 Sys Eng
Expeditionary Army Command Post
Common Hardware Systems
Centralized Technical Support Facility (CTSF)
Predictive Logistics
Predictive Logistics (PL) gathers and ingests vehicle platform sensor data into Command and Control (C2) systems to enable commanders to make decisions based on actionable logistics information. Data gathered from vehicle platforms and other authoritative data sources will be aggregated for visualization on Common Operating Pictures (COP) at all echelons. Awareness of logistics status enhances commanders' ability to make immediate tactical decisions based on current operational logistics conditions.
FY2026 to FY2027 change Funding in FY 2027 and beyond was realigned to PE 0605331A / C2 Applications, Projects C2C and C2D, as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems.
FY2026 plans — current year Funds will support system engineering efforts to establish supply/maintenance data alert thresholds and distribute/integrate data feeds with existing/emerging mounted and command post computing environments. Modeling and simulation will inform PL requirements in support of PL Capability Needs Statements. These efforts will support integration of PL data and applications at the platform level and lower echelons to provide streamlined feedback data to forward sustainment units, and to disseminate data to higher echelons and the enterprise level.
FY2026 to FY2027 change Funding in FY 2027 and beyond was realigned to PE 0605331A / C2 Applications, Projects C2C and C2D, as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems.
FY2026 plans — current year Funding will support matrix and contractor labor to facilitate systems engineering efforts, cybersecurity compliance, and technical research. Program management efforts will include coordination with key stakeholders, funding execution, and contract action planning.
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Other / unspecified | 100% | 42.6 |
| FY2027 request | 100% | 42.6 |
Mission & acquisition strategy
Project 323, Common Hardware Systems (CHS) is a mandated Army Strategic Source, as annotated in AR 25-1 that acquires and sustains highly flexible, cost-effective, and simplified non-developmental solutions that integrate the latest and emerging commercial information technology onto the Converged Mission Command Network. Also supports network solution procurement and sustainment for U.S. Army Reserves, U.S. Army National Guard, U.S. Navy, U.S. Air Force, U.S. Marine Corps, and other Federal agencies.
The Army is modernizing its Command and Control (C2) approach to secure battlefield superiority. Using modern systems engineering design approaches and industry best practices, the Army will deliver a horizontally integrated common software services framework for Army C2. The Army's modernization involves continuous improvements and integration of all network battlefield components, from transport and infrastructure to data and soldier- used applications. This effort focuses on development, integration/delivery of critical warfighting applications (including Command and Control, Movement and Maneuver, Intelligence, Fires, Protection, Sustainment, and Network Operations) within the Army's Next Generation Command and Control (NGC2) initiative.
- Management Services
- Product Development
- Support
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604818A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksMobile/Handheld Computing Environment (M/HHCE) — one RDT&E project inside PE 0604818A. Congressional marks are recorded on the program element, not on a project.
Project EQ8 — Mobile/Handheld Computing Environment (M/HHCE) — requests $42.6M in FY2027, 100% of the $42.6M requested for program element 0604818A. Year over year it falls 1.1% against FY2026.
Project EQ8 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 8.6 |
| FY2026 | Enacted | 43.0 |
| FY2027 | Request | 42.6 |
| FY2028 | Outyear | 47.4 |
| FY2029 | Outyear | 48.3 |
| FY2030 | Outyear | 49.2 |
| FY2031 | Outyear | 49.7 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Conduct NW developmental testing and technical verification, including third-party evaluations, to assess new technologies and systems. Support NW as a baseline Next Gen C2/mobile CE system for the warfighter by performing electromagnetic interference testing, environmental testing, system of system/interoperability testing and…
Provide NW software / hardware updates to support incorporation of 3rd party software applications onto NW EUD platform and cyber security testing ahead of convergence with SBMC. Continue DARPA SHARE network server reduction infrastructure transition capability. Continue integration and certification testing of ISW Multi-Mode Body Area…
Read the FY2027 plan →Update NW Software Development Kit (SDK) with new functionality. Continue software upgrades in accordance with HQDA priority efforts to include updates to security and operational requirements. FY 2027 funding provides for integration/ automated tools and risk reduction events such as funding to initiate Artificial Intelligence/ Machine…
Read the FY2027 plan →Continue to conduct government systems / software engineering and program management support for NW program. Will collect input from Soldiers to improve NW and SBMC size, weight, power, lethality, safety and effectiveness via surveys. Will execute development, test, and integration of emerging innovative commercial technologies such as…
What project EQ8 buys
Project EQ8, Mobile/Handheld Computing Environment (M/HHCE) enables situational awareness (SA) and command and control (C2) for dismounted combat forces through the Nett Warrior (NW) system. M/HH CE utilizes Government-owned Tactical Assault Kit (TAK) as a foundation for integrating a wide array of functional software, such as UAV planning/control, casualty care and logistics. Future version of NW and TAK will form the SA/C2 baseline for dismounted forces in support of Headquarters Department of the Army priority efforts, such as Next Generation Command & Control (NGC2) and Transformation in Contact (TiC). . The NW system provides leaders electronic real-time information on friendly positions; information about enemy activity and movement; navigational data and map imagery; a collaborative mission planning tool; and other mission related graphics which effectively puts the power of the entire Army tactical network in the hands of the dismounted leader. Nett Warrior (NW) and Soldier Borne Mission Command (SBMC) are the instantiation of the M/HHCE and comply with the technical standards documented by the M/ HHCE and provide the dismounted common computational platform for other products relevant to dismounted Soldiers. Through compliance with the M/HHCE, software applications from other programs are integrated with the NW and SBMC systems, reducing the need for duplicate hardware resulting in reduced Soldier Load. M/ HHCE also supports the Army Network Modernization Strategy LOE 2 (Common Operating Environment). These efforts are aligned to the Army's Tactical Network Capability Set development and fielding plans by utilizing (1) interoperable data, message, and waveforms, (2) sensors and applications that enable operations across domains and automated tools to aid decision-making and (3) integration with Joint C4ISR and strike capabilities. NW leverages commercial smart phone devices and secure Army tactical radios to provide the dismounted leader an integrated command and control situational awareness capability for use during combat operations.
- Management Services
- Product Development
- Support
- Test and Evaluation
TACTICAL NETWORK OPERATIONS AND MANAGEMENT — one RDT&E project inside PE 0604818A. Congressional marks are recorded on the program element, not on a project.
Project EK9 — TACTICAL NETWORK OPERATIONS AND MANAGEMENT — requests — in FY2027, 0.0% of the $42.6M requested for program element 0604818A. Year over year it falls 100% against FY2026.
Project EK9 funding, FY2025–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 59.7 |
| FY2026 | Enacted | 200.4 |
7 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Funding will be used to deliver a modernized C2 Applications Layer that includes critical warfighting function (WfF) applications. Continuous competition via future Commercial Solutions Openings (CSO) will onboard new technologies through integration of innovative and iterative capabilities while maintaining momentum from the Project…
Ramp up testing processes and capabilities and execute a variety of TEVV activities, including Logistics, Limited User Assessment(s), Cyber Tabletop Exercise (CTTX), Cybersecurity Vulnerability Assessment (CVA), Adversarial Cybersecurity Developmental Test (ACDT), Cooperative Vulnerability and Penetration Test (CVPA), and After Actions.
Funds personnel labor to support program management and execution for the C2 Applications Layer, including facilitation of continuous competition via future Commercial Solutions Openings (CSO). Includes assessment of cybersecurity compliance, research, program oversight, risk management and documentation.
Product Development funds the competitive prototype development of Unified Network Operations (UNO) solutions. Prototype development of Lower-Tier Tactical (LTT) and Upper-Tier Tactical (UTT) capabilities serve as the foundational components of UNO including a Simplified User Interface (SUI), open network architectures, Application…
Training Development funds will provide for development of training materials in FY 2025 to support UNO IS-ICD requirements. Training development will support the iterative software development process and Development, Security, Operations (DevSecOps) activities, including Soldier Touch Points (STPs) and Operational User Assessments…
Test & Evaluation funds will provide for the continuous integration, test, and evaluation of UNO capabilities, acquiring the necessary certifications to operate UNO capabilities across Army networks and Department of Defense Information Networks (DODIN) operations, and will ensure UNO capabilities are integrated and interoperable across…
Management Services funds will provide for Program Management Office (PMO) support activities to the Unified Network Operations (UNO) program, to include contracts management, logistical support, program and business management functions.
What project EK9 buys
This funding line supports the NGC2 initiative to modernize C2 systems. NGC2 is one of the Army's highest modernization priorities and will enhance the ability to conduct multi-domain operations by integrating advanced technologies, improving interoperability, and increasing the speed and accuracy of decision-making processes. This funding line specifically supports the Applications Layer efforts within NGC2. The Applications Layer supports the delivery of warfighting function (WfF) applications and Unified Network Operations. WfF applications (e.g. Command and Control, Information Advantage, Movement and Maneuver, Intelligence, Fires, Protection, Sustainment and Network Operations) will be delivered to the specifications defined by the Data Layer (Project EJ6). Project EK9 also consolidates and further refines Network Operations (NetOps) tools that are key to enabling applications in a data-centric network with increased efficiency in overall network management. Warfighting function applications will operate in conjunction with the Data Layer to provide seamless mission command from the enterprise to the tactical edge, leveraging cutting edge available commercial technologies. This unified approach will dramatically improve the user experience for warfighters, enabling faster decision-making and ultimately increasing lethality.
- Management Services
- Product Development
- Support
- Test and Evaluation
TACTICAL ENHANCEMENT — one RDT&E project inside PE 0604818A. Congressional marks are recorded on the program element, not on a project.
Project EJ6 — TACTICAL ENHANCEMENT — requests — in FY2027, 0.0% of the $42.6M requested for program element 0604818A. Year over year it falls 100% against FY2026.
Project EJ6 funding, FY2026–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2026 | Enacted | 136.9 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Funding will be used to deliver the C2 Data Layer prototype. Continuous competition via future Commercial Solutions Openings (CSO) will onboard new technologies through integration of innovative and iterative capabilities while maintaining momentum from the Project Convergence Capstone 5 exercise, with a division-scaled prototype…
Funding will be used to ramp up the TEVV processes, to include Logistics, STPs, Limited User Assessment(s), Cyber Tabletop Exercise (CTTX), Cybersecurity Vulnerability Assessment (CVA), Adversarial Cybersecurity Developmental Test (ACDT), Cooperative Vulnerability and Penetration Test (CVPA), and After Actions.
Funds personnel labor in program management and execution support of the C2 Data Layer, including facilitation of continuous competition via future Commercial Solutions Openings (CSO). Includes assessment of cybersecurity compliance, research, program oversight, risk management, and required reporting and documentation.
What project EJ6 buys
This funding line supports the NGC2 initiative to modernize C2 systems. NGC2 is one of the Army's highest modernization priorities and will enhance the ability to conduct multi-domain operations by integrating advanced technologies, improving interoperability, and increasing the speed and accuracy of decision-making processes. This funding line specifically supports the Data Layer efforts within NGC2. The Data Layer delivers standardized and seamless data access across warfighting function applications (e.g. Command and Control, Information Advantage, Movement and Maneuver, Intelligence, Fires, Protection, Sustainment and Network Operations). Real-time access to common data is critical to maintaining a decisive advantage. The Data Layer leverages industry's best practices for iterative Development, Security, and Operations (DevSecOps) with an emphasis on artificial intelligence/machine learning (AI/ML) capabilities.
- Management Services
- Product Development
- Test and Evaluation
Unified Network Technology Trans & Integ (UNTTI) — one RDT&E project inside PE 0604818A. Congressional marks are recorded on the program element, not on a project.
Project DD1 — Unified Network Technology Trans & Integ (UNTTI) — requests — in FY2027, 0.0% of the $42.6M requested for program element 0604818A. Year over year it falls 100% against FY2026.
Project DD1 funding, FY2025–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 12.7 |
| FY2026 | Enacted | 14.5 |
6 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Funds matrix and contractor personnel labor and travel requirements in support of multiple planned Soldier Touch Points and other demonstration/exercise/training events. Includes program oversight, systems engineering and technical control, risk management, documentation, and fielding support for UNTTI efforts.
Funds improve the usability, security, and performance aspects of the software based on operational feedback. Funds software modification, software licenses, evaluation of hardware integration options, and supports initial demonstrations of capability to select Army Units to understand integration and performance at scale. Funds…
Funds will procure, modify and harden advanced cellular equipment that will provide cellular service to enable next generation command and control applications to keep warfighters updated and connected.
Funds will improve capabilities based on prototype feedback and soldier touchpoints, integrate at RHN to understand performance at scale, and develop the appropriate acquisition documentation necessary for soldier training and sustainment.
Funds will be used for prototype procurement and modification of an emerging technology in transport modernization, along with integration and testing of modernized baseband solutions. Funds evaluation of hardware form factor variants and supports integration and testing with various Army platforms. Funds integration, testing, and…
Funds will be used to develop System of Systems (SoS) training materials for units that have multiple integrated systems from across the PM Tactical Network portfolio.
What project DD1 buys
In FY 2027, this effort was transferred to PE 0605330A (C2 Transport) / Project C2A (Satellite and Network Modernization). Project DD1, Unified Network Technology Transition and Integration (UNTTI) supports the Army's Command Control (C2) Transport strategy. UNTTI is an RDT&E initiative enabling transport agnostic, high-capacity and resilient tactical communications for expeditionary operations. UNTTI efforts support system/subsystem development and demonstration, aimed at integration, maturation, evaluation, and testing to demonstrate systems against requirements. TEM Projects, Line of Sight Modernization, SATCOM Modernization, Transport Modernization, Secure Cellular, and System of Systems (SoS) Training. These technologies support new and improved communications capabilities with reduced Size, Weight, and Power (SWAP), while increasing throughput, providing network resiliency and Low Probability of Intercept/Low Probability of Detection (LPI/LPD) capabilities. The Program Executive Office Command, Control, Communications and Network (PEO C3N) is responsible for prioritizing, programming, managing and executing the projects detailed below and ensuring these funds are available to support the Army modernization priorities. The Command and Control Cross Functional Team (C2-CFT), Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance and Reconnaissance (C5ISR) Center, Army Capability Network (ACM) Networks and Services (N&S) support the prioritization of technology demonstrations, focused evaluations, and expert analyses to inform future requirements, mature technologies, and deliver new capabilities. These projects inform technology integration, support user assessments, and transition to programs if appropriate. UNTTI procures, modifies, integrates, and tests system prototypes to demonstrate enhanced capabilities in accordance with Army modernization priorities. UNTTI supports developing technical, logistics, training, and other acquisition documentation to assist with the transition, insertion, and integration of efforts across PM Tactical Network and enables the transition of developing and new technologies to support Next Generation Command and Control (NGC2). In addition, UNTTI resources validation and test efforts which improves the reliability, maintainability, and supportability of Tactical Network equipped units.
- Management Services
- Product Development
- Test and Evaluation
Army Tac C2 Sys Eng — one RDT&E project inside PE 0604818A. Congressional marks are recorded on the program element, not on a project.
Project C34 — Army Tac C2 Sys Eng — requests — in FY2027, 0.0% of the $42.6M requested for program element 0604818A. Year over year it falls 100% against FY2026.
Project C34 funding, FY2025–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 10.8 |
| FY2026 | Enacted | 11.2 |
6 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continue to provide the infrastructure and support to conduct integration testing and systems engineering for PEO C3N systems, products, technical insertions, and systems under evaluation, ensuring integration of capabilities across the network. Funds include sustainment of increased level of integration testing and required maintenance…
Across the Army Unified Network and Mission Command applications within and external to PEO C3N, provide integration support for testing, exercises and experimentation. Identify critical integrated test points, monitor developmental testing at integration points, develop event architectural data processes and products, and facilitate the…
Continue to implement ARCYBER, CIO, G6 and CYBERCOM guidance for execution of Cyber Security policies and procedures at the tactical level. Continue to document the current tactical network security architecture while developing recommendations to eliminate inconsistencies/duplications, increase the security posture, decrease complexity…
Continue technical implementation of cross-PEO System of Systems Engineering and Integration analysis and processes to ensure successful development and engineering of current and future systems for Unified Network. Includes SoS engineering design for Program of Record and emerging Network Modernization technologies capabilities planned…
Continue to develop System of Systems Engineering tools, standards and interfaces to support DoD-driven initiatives. Tool development and implementation improves technical integration across the Army Unified Network. Tools also support integration of technical, logistics and business data for improved trade studies in support of…
Continue the support of current force and the development of future force C5ISR across the tactical network to ensure all Assistant Secretary of the Army (Acquisition, Logistics & Technology) (ASA(ALT)) programs are synchronized and redundancies and overlapping capabilities are reduced across the network and in synchronization with Army…
What project C34 buys
Project C34: Army Tac C2 Sys Eng FY 2027 and beyond was realigned to PE 0655333A/C2 Infrastructure, Project C2H, C2 Systems Engineering as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer. Project C34, Army Tactical Command and Control Systems Engineering supports the Army's Network Modernization Strategy and coordinates technical efforts across and outside of CPE Command, Control, Communications, and Network (C3N) to ensure integration with the current and future Mission Command Network. Project C34 provides technical support to programs, informing design and solutions with specific emphasis on the ability for different program efforts to be integrated and interoperable with one another. Efforts support Army Modernization priorities including Army Unified Network Plan, Multi-Domain Operations, Joint All Domain Command and Control (JADC2), Data Modernization and emerging data-centric requirements. This project provides the CPE C3N System of Systems (SoS) engineering and integration, acquisition management, testing, fielding and sustainment support to ensure interoperability and affordability within the CPE C3N portfolio. The effort focuses on SoS Engineering and Integration for the Mission Command Network with increased emphasis on immediate Warfighter needs as well as leveraging emerging technologies.
- Product Development
- Support
Expeditionary Army Command Post — one RDT&E project inside PE 0604818A. Congressional marks are recorded on the program element, not on a project.
Project ER9 — Expeditionary Army Command Post — requests — in FY2027, 0.0% of the $42.6M requested for program element 0604818A. Year over year it falls 100% against FY2026.
Project ER9 funding, FY2026–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2026 | Enacted | 10.0 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2026 to FY2027 change Project ER9: Expeditionary Army Command Post in FY 2027 and beyond was realigned to PE 655333/C2 Infrastructure, Project C2I, Mounted C2 Infrastructure as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer.
FY2026 plans — current year Evolve design for "On The Move Command Post" to enhance capabilities through increased wireless capability, mobility, functionality, scalability, and set conditions to support the Next Generation Command and Control design.
FY2026 to FY2027 change Project ER9: Expeditionary Army Command Post in FY 2027 and beyond was realigned to PE 655333/C2 Infrastructure, Project C2I, Mounted C2 Infrastructure as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer.
FY2026 plans — current year Funding supports updates to the technical data packages and various unit engagements.
FY2026 to FY2027 change Project ER9: Expeditionary Army Command Post in FY 2027 and beyond was realigned to PE 655333/C2 Infrastructure, Project C2I, Mounted C2 Infrastructure as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer.
FY2026 plans — current year Testing for the on the move command post capabilities and experimentation with modular command posts.
FY2026 to FY2027 change Project ER9: Expeditionary Army Command Post in FY 2027 and beyond was realigned to PE 655333/C2 Infrastructure, Project C2I, Mounted C2 Infrastructure as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer.
FY2026 plans — current year Contract and Matrix personnel involved in the execution of the mission requirements to include design, testing and training.
What project ER9 buys
Project ER9: Expeditionary Army Command Post in FY 2027 and beyond was realigned to PE 655333/C2 Infrastructure, Project C2I, Mounted C2 Infrastructure as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer. Command posts provide locations from which commanders, assisted by their staffs, command operations and integrate/synchronize combat power to accomplish missions across the range of military operations. Commanders organize mission command systems into command posts based on mission requirements and the situation that will best assist them in exercising command and control of assigned and attached forces. Command post survivability is vital to mission success. Depending on the threat, command posts need to remain small and highly mobile, especially at echelons below Division. Command posts are easily acquired and targeted by our adversaries when concentrated. Command post survivability is increased via dispersion, reduced size, redundancy, mobility, as well as camouflage and concealment. Command post survivability is further enhanced via dismounted operations that can take advantage of cover or shielding by terrain features or urban structures
- Management Services
- Product Development
- Support
- Test and Evaluation
Common Hardware Systems — one RDT&E project inside PE 0604818A. Congressional marks are recorded on the program element, not on a project.
Project 323 — Common Hardware Systems — requests — in FY2027, 0.0% of the $42.6M requested for program element 0604818A. Year over year it falls 100% against FY2026.
Project 323 funding, FY2025–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 4.9 |
| FY2026 | Enacted | 5.0 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2026 to FY2027 change FY 2027 and beyond was realigned to PE 0605333A/C2 Infrastructure, Project C2G, Modular C2 Infrastructure as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer.
FY2026 plans — current year Acquisition support for CHS and customer programs. CHS rapidly procures common hardware configurations in support of Network Modernization, Network Experimentation, and Command and Control Cross Functional Team (CFT). Supports tactical/operational programs that enable the continuous modernization of a unified network requirements, the sustainment community, and DoW and Federal Government customers.
FY2025 accomplishments Acquisition support for CHS and customer programs. CHS rapidly procures common hardware configurations across all four Network Modernization Lines of Effort, Capability Sets, and Network Cross Functional Team (CFT). Supports tactical/operational programs that enable the continuous modernization of a unified network requirements, the sustainment community, and DoD and Federal Government customers.
FY2026 to FY2027 change FY 2027 and beyond was realigned to PE 0605333A/C2 Infrastructure, Project C2G, Modular C2 Infrastructure as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer.
FY2026 plans — current year CHS provides technical support, environmental and survivability testing, system engineering and design, end of life/configuration management, and strengthens cyber security/supply chain management across Army tactical/operational programs to ensure interoperability and integration of hardware throughout the computing infrastructure. CHS conducts hardware evaluations that facilitate and simplify the selection of common hardware solutions across numerous Army programs and agencies.
FY2025 accomplishments CHS provides technical support, environmental and survivability testing, system engineering and design, end of life/configuration management, and strengthens cyber security/supply chain management across Army tactical/operational programs to ensure interoperability and integration of hardware throughout the computing infrastructure. CHS conducts hardware evaluations that facilitate and simplify the selection of common hardware solutions across numerous Army programs and agencies.
FY2026 to FY2027 change FY 2027 and beyond was realigned to PE 0605333A/C2 Infrastructure, Project C2G, Modular C2 Infrastructure as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer.
FY2026 plans — current year CHS logistical services include worldwide support with a 24-hour turnaround for repairs, tailorable supply chain and cybersecurity measures, manages customizable warranty, maintenance and failure rate reporting, and technical support services to support specific Army program requirements.
FY2025 accomplishments CHS logistical services include worldwide support with a 24-hour turnaround for repairs, tailorable supply chain and cybersecurity measures, manages customizable warranty, maintenance and failure rate reporting, and technical support services to support specific Army program requirements.
FY2026 to FY2027 change FY 2027 and beyond was realigned to PE 0605333A/C2 Infrastructure, Project C2G, Modular C2 Infrastructure as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer.
FY2026 plans — current year Contract Support Services are required to provide continuing expedited acquisition support for customer procurements.
FY2025 accomplishments Contract Support Services are required to provide continuing expedited acquisition support for customer procurements.
What project 323 buys
Project 323: Common Hardware Systems in FY 2027 and beyond was realigned to PE 0605333A/C2 Infrastructure, Project C2G, Modular C2 Infrastructure as part of a new funding structure for the Next Generation Command and Control (NGC2) investment to modernize Command and Control (C2) systems for the Infrastructure Layer. Common Hardware Systems (CHS) is a mandated Army Strategic Source, as annotated in Army Regulation (AR) 25-1 Army Information Technology (IT) that acquires and sustains highly flexible, cost-effective, and simplified non-developmental solutions that integrate the latest and emerging commercial IT into the Converged Mission Command Network. Efforts are aligned to support the Program Executive Office, Command, Control and Communications Network (PEO C3N) network evaluation and experimentation goals. This funding line also supports network solution procurement and sustainment for U.S. Army Reserves, U.S. Army National Guard, U.S. Navy, U.S. Air Force, U.S. Marine Corps, and other Federal agencies. CHS provides technical support, warranty support, system engineering and design, and end-of-life and configuration management services to ensure interoperability and integration of hardware throughout the computing infrastructure. CHS continuously analyzes and tracks hardware from cradle to grave, from emerging technology until end of life. The program conducts hardware evaluations that facilitate and simplify the selection of common hardware solutions across numerous Army programs, agencies, Joint Services, and other Federal Agencies including: Mission Command; Tactical Network; Tactical Radios; Intelligence Systems and Analytics; Aviation Systems; Counter-Rocket, Artillery, Mortar (C-RAM); Communication Electronics Command; Combat Capabilities Development Command (DEVCOM); Army National Guard and Reserves; Navy; Air Force; Marines; the Federal Bureau of Investigation; among others. CHS rapidly procures common hardware configurations in support of the Next Generation Command and Control (NGC2) Infrastructure layer, the sustainment community, and tactical programs that enable transformation in contact. CHS is an enabler of the initiative of continuous transformation, empowering end users to experiment, innovate, and integrate, the most modern Commercial of the Shelf (COTS) IT.
- Product Development
- Support
Centralized Technical Support Facility (CTSF) — one RDT&E project inside PE 0604818A. Congressional marks are recorded on the program element, not on a project.
Project C29 — Centralized Technical Support Facility (CTSF) — requests — in FY2027, 0.0% of the $42.6M requested for program element 0604818A. Year over year it falls 100% against FY2026.
Project C29 funding, FY2025–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 4.2 |
| FY2026 | Enacted | 4.4 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2026 to FY2027 change Decrease reflects the end of testing requirements in FY 2026.
FY2026 plans — current year Continue SWB11-12 test planning, test case development, test environment architecture set-up, for interoperability testing, Geospatial Information Systems (GIS) interoperability assessment, cybersecurity posture adjustment and assessment activities for the systems that comprise the Army's tactical software baselines. Conduct COE v3.0 planning, test case development and architecture set-up to support the technical standards update timelines for the Army's tactical software baseline. Conduct interoperability testing for the SWB11-12 and COE v3.0 systems that comprise the LWN/MC baseline to ensure the tactical integrated computing infrastructure is interoperable in a System of Systems (SoS)…
FY2025 accomplishments Continue SWB11-12 test planning, test case development, test environment architecture set-up, for interoperability testing, Geospatial Information Systems (GIS) interoperability assessment, cybersecurity posture adjustment and assessment activities for the systems that comprise the Army's tactical software baselines. Conduct COE v3.0 planning, test case development and architecture set-up to support the technical standards update timelines for the Army's tactical software baseline. Conduct interoperability testing for the SWB11-12 and COE v3.0 systems that comprise the LWN/MC baseline to ensure the tactical integrated computing infrastructure is interoperable in a System of Systems (SoS)…
FY2026 to FY2027 change Decrease reflects the end of testing requirements in FY 2026.
FY2026 plans — current year Continue to provide Network support for integration and test floors, network support to fielded units, and systems engineering and analysis support to system of systems integration activities. Enhance the Security posture of the CTSF by ensuring the latest Information Assurance Vulnerability Alerts (IAVAs) and Security Technical Implementation Guides (STIGs) are implemented as required by Risk Management Framework (RMF). Integrate and implement Army End Point Security System (AESS) technology, assist PMs in the development of AESS policies. Plan and conduct engineering evaluations for AIC testing and data collection in the Joint Warfighter Assessment (JWA)/Capability Integration Evaluation…
FY2025 accomplishments Continue to provide Network support for integration and test floors, network support to fielded units, and systems engineering and analysis support to system of systems integration activities. Enhance the Security posture of the CTSF by ensuring the latest Information Assurance Vulnerability Alerts (IAVAs) and Security Technical Implementation Guides (STIGs) are implemented as required by Risk Management Framework (RMF). Integrate and implement Army End Point Security System (AESS) technology, assist PMs in the development of AESS policies. Plan and conduct engineering evaluations for AIC testing and data collection in the Joint Warfighter Assessment (JWA)/Capability Integration Evaluation…
FY2026 to FY2027 change Decrease reflects the end of testing requirements in FY 2026.
FY2026 plans — current year Continue to provide CM functional and physical configuration management and change management to the CTSF Army Interoperability Certification test floor environment. Provide CM functional and physical configuration management and change management to the AICFB, to include archiving the required system software, data products and documentation, while correlating the relevant data within the CMTSIII DBMS for visibility to users Army wide. Provide baseline reconciliation to the four quarterly HQDA G6 AICFB reports, identifying to commanders and their G-3/G-6 staff the Army's AIC certified, Interoperability Capability and Limitations assessed, AIC waivered, and AIC exempted system software that…
FY2025 accomplishments Continue to provide CM functional and physical configuration management and change management to the CTSF Army Interoperability Certification test floor environment. Provide CM functional and physical configuration management and change management to the AICFB, to include archiving the required system software, data products and documentation, while correlating the relevant data within the CMTSIII DBMS for visibility to users Army wide. Provide baseline reconciliation to the four quarterly HQDA G6 AICFB reports, identifying to commanders and their G-3/G-6 staff the Army's AIC certified, Interoperability Capability and Limitations assessed, AIC waivered, and AIC exempted system software that…
FY2026 to FY2027 change Decrease reflects the end of testing requirements in FY 2026.
FY2026 plans — current year Continuation of programming and execution of funding. Plan and program manpower, identify contracting requirements and develop strategy for implementation in conjunction with CECOM Acquisition Center. Track testing schedule, prepare/coordinate/ track customer funding for AIC testing activities and infrastructure support. Continue to provide field support coordination for unit training and exercises upon request. Maintain existing infrastructure; continue to enhance physical security, access control, force protection, Continuity of Operations (COOP) and Emergency Action Plan (EAP) activities and exercises. Continue inventory accountability programs and asset control.
FY2025 accomplishments Continuation of programming and execution of funding. Plan and program manpower, identify contracting requirements and develop strategy for implementation in conjunction with CECOM Acquisition Center. Track testing schedule, prepare/coordinate/track customer funding for AIC testing activities and infrastructure support. Continue to provide field support coordination for unit training and exercises upon request. Maintain existing infrastructure; continue to enhance physical security, access control, force protection, Continuity Of Operations (COOP) and Emergency Action Plan (EAP) activities and exercises. Continue inventory accountability programs and asset control.
What project C29 buys
Project C29, The Centralized Technical Support Facility (CTSF): The CTSF is the Army's premier test and certification facility for System of Systems interoperability, functioning as CIO/G6's designated independent test agent and Land/WarNet/Mission Command (LWN/MC) configuration manager. The Central Technical Support Facility's (CTSF) directed mission is to perform Army Interoperability Certification (AIC) testing and configuration management for all 23 operational through tactical level Command, Computing, Control, Communications, Cyber, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems, Mission and Space systems, Aviation systems and other individual, family, and system of systems, applications, and hardware prior to release to the field. The CTSF accomplishes this through the enforcement of a standards based architecture while supporting the development and implementation of an integrated computing infrastructure and a converged network. The CTSF provides validated test data to the Department of the Army and Joint agencies to accredit interoperability certifications. The distributed test environment of the CTSF is accomplished through the Federation of Net-centric Sites (FaNS) construct. This FaNS construct addresses distributed integration development and testing using the core infrastructure of the CTSF to harness Army and Joint expertise/resources. Through these federated resources, the CTSF executes or supports interoperability development, integration and certification testing of the systems and system of systems in the Warfighter Mission Area, to include Network Evaluation spinouts, as they become part of the Army's LandWarNet. The cited work is consistent with Strategic Planning Guidance and the Army Modernization and Strategy Plan.
- Management Services
- Support
- Test and Evaluation