RDT&E Program Element · President's Budget PB2027

Artillery Systems - EMD

PE 0604854A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$709.2M
⚑ Contested — House approps cuts 16%
HitchAI read

U.S. Army funding ramps 824% to a $709.2M request in FY2027 — the program's peak, before stepping down 84% across the five-year plan. In the FY2027 defense authorization, the House cut 8.1% (to $651.7M); the Senate funded it in full; House appropriators cut 16% (to $593.8M).

FY2027 Request
$709.2M
▲ 824% vs FY2026
House approps mark
$593.8M
▼ $115.4M vs request
FY2026 Enacted
$76.8M
In law

Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $709.2M for Artillery Systems - EMD under RDT&E program element 0604854A, up 824% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $593.8M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

200400600040.9FY25ACTUAL76.8FY26ENACTED709.2FY27REQUEST161.9FY2882.6FY29110.5FY30111.7FY31HOUSE APPROPS
Actual Enacted Request Outyear (FYDP) House approps mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual40.9
FY2026Enacted76.8
FY2027Request709.2
FY2028Outyear161.9
FY2029Outyear82.6
FY2030Outyear110.5
FY2031Outyear111.7
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

4 projects roll up into PE 0604854A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 824% overall, which can hide much larger swings below.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$709.2M
House NDAA (HASC)HASC
$651.7M −$57.5M · −8.1%
Senate NDAA (SASC)SASC
$709.2M full · +$0
House Approps (HAC-D)HAC_D
$593.8M −$115.4M · −16%
▲ $115.4M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Other / unspecified100%709.2
FY2027 request100%709.2
Program detail

Mission & acquisition strategy

This program element encompasses engineering and manufacturing development for artillery weapons systems. Project 516 is to modernize the field artillery to address obsolesce, improve performance and address emerging threats. The Self-Propelled Howitzer is an indirect fire weapon system with the ability of delivering accurate, long range, lethal and non-lethal cannon fires in support of both Combined Arms Maneuver (CAM) and Wide Area Security (WAS) operations.

The MTC program will enter a Middle Tier Acquisition - Rapid Prototyping (MTA-RP) acquisition pathway using mature and available, self-propelled artillery system to characterize and refine MTC requirements. Integration and development activities will include U.S. fires network integration, U.S. ammunition and autoloader compatibility assessments, and the development of an RSV. A competitive Other Transaction Authority (OTA) will be used for the MTC effort, with planned follow-on production activities. The RSV effort will use a Commercial Solution Offering (CSO) for developmental and prototyping activities, with a planned production follow-on.

Project DP3, 516, DH7, HB6 — Mobile Tactical Cannon (MTC)
  • Management Services
  • Product Development
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House approps do to this request, and what is still unresolved?Which project inside PE 0604854A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604854A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Artillery Systems - EMD (PE 0604854A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604854A
Machine access
Markdown twin /programs/0604854A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$696.6M
President's Budget

Mobile Tactical Cannon (MTC) — one RDT&E project inside PE 0604854A. Congressional marks are recorded on the program element, not on a project.

Project DP3 — Mobile Tactical Cannon (MTC) — requests $696.6M in FY2027, 98% of the $709.2M requested for program element 0604854A. It is a new start — no prior-year or current-year money.

Funding trajectory

Project DP3 funding, FY2027–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2004006000696.6FY27REQUEST161.9FY2882.6FY29110.5FY30111.7FY31
Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2027Request696.6
FY2028Outyear161.9
FY2029Outyear82.6
FY2030Outyear110.5
FY2031Outyear111.7
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Program ManagementNEW
FY2025 actual
FY2026 enacted
FY2027 request$15.3M

Obtain MTC & RSV prototype systems. Oversee network integration, prototype evaluation and future planning.

Product DevelopmentNEW
FY2025 actual
FY2026 enacted
FY2027 request$646.4M

Funds support obtaining MTC & RSV prototype systems for incorporation into an operational environment, as well as continued developmental engineering, integration efforts, U.S. ammunition compatibility testing, and interoperability with the U.S. fires network.

FY2025 actual
FY2026 enacted
FY2027 request$34.9M

FY27 funding will execute the required testing to enable Soldier experimentation events in FY28. Key events include formally characterizing system performance, developmental and live fire testing, verifying U.S. ammunition compatibility, validating fire control and network interoperability, and initiating the system safety certification…

Read the FY2027 plan →
Project DP3 — every activity in full →
Project detail

What project DP3 buys

The mission of the Mobile Tactical Cannon (MTC) program is to acquire an improved, mature, and available self-propelled artillery system and associated Resupply Vehicle (RSV) to replace legacy artillery systems. These systems will enable artillery formations to shape the deep fight and dominate the close fight during Multi-Domain Operations. Collectively, the MTC and RSV will provide a decisive advantage by delivering massed lethal effects at extended ranges with increased rates of fire, enhanced mobility, reduced mission cycle and resupply times, and provide a high level of survivability on the modern battlefield. To respond to current and emerging threats, these systems will have margin for growth and be able to integrate current and future technologies, such as, but not limited to counter-small unmanned arial system capabilities, armament and mobility enhancements, human-machine and human-factors modifications, partial-to-fully automated ammunition handling, and partial-to-full autonomy for the MTC and RSV.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation
FY2027 Request
$12.6M
▼ 24% vs FY2026
FY2026 Enacted
$16.5M
▼ 60% vs FY2025
FY2025 Actual
$40.9M
Prior year

Paladin/FAASV — one RDT&E project inside PE 0604854A. Congressional marks are recorded on the program element, not on a project.

Project 516 — Paladin/FAASV — requests $12.6M in FY2027, 1.8% of the $709.2M requested for program element 0604854A. Year over year it falls 24% against FY2026.

Funding trajectory

Project 516 funding, FY2025–FY2027

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25040.9FY25ACTUAL16.5FY26ENACTED12.6FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual40.9
FY2026Enacted16.5
FY2027Request12.6
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Program ManagementRESTART
FY2025 actual$1.5M
FY2026 enacted
FY2027 request$1.1M

Develop and manage detailed schedules for modernization activities, establish and execute contracts, and coordinate all programmatic documentation.

Product Development▼ 8%
FY2025 actual$39.5M
FY2026 enacted$12.5M
FY2027 request$11.4M

Continue engineering development activities.

Project 516 — every activity in full →
Project detail

What project 516 buys

Project 516 is to modernize the field artillery to address obsolescence, improve performance and address emerging threats. The Self-Propelled Howitzer is an indirect fire weapon system with the ability of delivering accurate, long range, lethal and non-lethal cannon fires in support of both Combined Arms Maneuver (CAM) and Wide Area Security (WAS) operations. The Self-Propelled Howitzer and Ammunition Resupply Vehicle can be employed within any Brigade Combat Team formation to neutralize, suppress, or destroy enemy forces, while providing protected transport of a field artillery howitzer section on the modern battlefield. This effort will include system usage and optimization studies, simulations, development engineering, Line Replacement Unit (LRU) prototype development and procurement and validation for incremental upgrades of field artillery.

R-3 lines of work
  • Management Services
  • Product Development
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$51.3M
In law

Next Generation Howitzer — one RDT&E project inside PE 0604854A. Congressional marks are recorded on the program element, not on a project.

Project DH7 — Next Generation Howitzer — requests in FY2027, 0.0% of the $709.2M requested for program element 0604854A. Year over year it falls 100% against FY2026.

Funding trajectory

Project DH7 funding, FY2026–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550051.3FY26ENACTED
Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted51.3
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Howitzer Modernization▼ 100%
FY2025 actual
FY2026 enacted$51.3M
FY2027 request

Funding supports the enhancements, integration, and testing of system of systems to include, but not limited to, artillery weapon system, ammunition, and fire control systems to achieve desired firing range and lethal fires effects on targets, as necessary for Artillery unit operations.

Project DH7 — every activity in full →
Project detail

What project DH7 buys

This project supports howitzer efforts required to achieve highly mobile, survivable, versatile, transportable, long range, lethal fires in support of the Army's Field Artillery modernization objectives. These critical development efforts provide an enhanced capability reducing emplacement and displacement times, increasing crew survivability and protection, providing greater mobility, and affords improved fire support capability for Field Artillery formations well beyond the capability of the current howitzer systems.

R-3 lines of work
  • Product Development
  • Test and Evaluation
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$9.0M
In law

Mobile 155MM Howitzer — one RDT&E project inside PE 0604854A. Congressional marks are recorded on the program element, not on a project.

Project HB6 — Mobile 155MM Howitzer — requests in FY2027, 0.0% of the $709.2M requested for program element 0604854A. Year over year it falls 100% against FY2026.

Funding trajectory

Project HB6 funding, FY2026–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

09.0FY26ENACTED
Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted9.0
Project detail

What project HB6 buys

Project HB6 supports the mobile howitzer program. The Mobile Howitzer is a Self-Propelled, Wheeled Howitzer that provides lethal, proactive counter-fire essential for the survivability of the maneuver formations and other close support fires as required. The Mobile Howitzer improves the Field Artillery Battalion's ability to maintain pace with its supporting maneuver formations and survive against responsive, counter-fire from near-peer threats with rapid displacement and emplacement times. The mobile howitzer will improve tactical mobility and system survivability compared to existing towed howitzer systems. Development efforts, prototyping, system evaluations, and technology evaluations will focus on attributes such as improved emplacement and displacement times, driving speed, and crew protection capabilities, all without sacrificing lethality versus existing and future towed howitzer systems. Technology evaluations will leverage both 105mm and 155mm howitzers to understand benefits and limitations of potential enabling technologies.

R-3 lines of work
  • Product Development