RDT&E Program Element · President's Budget PB2027

Chemical and Biological Defense (Operational Systems Development)

PE 0607384BP·Defense-Wide·Approp. 0400 — RDT&E·BA7 — Operational System Development
FY2027 Request
$82.7M
Defense-Wide · RDT&E
HitchAI read

Defense-Wide requests $82.7M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators added 8.5% (to $89.7M). DCS Corps leads the industry work.

FY2027 Request
$82.7M
▲ 6.9% vs FY2026
FY2026 Enacted
$77.3M
▲ 5.2% vs FY2025
FY2025 Actual
$73.5M
Prior year

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, Defense-Wide agencies are requesting $82.7M for Chemical and Biological Defense (Operational Systems Development) under RDT&E program element 0607384BP, up 6.9% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255075073.5FY25ACTUAL77.3FY26ENACTED82.7FY27REQUEST74.0FY2864.1FY2970.5FY3094.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual73.5
FY2026Enacted77.3
FY2027Request82.7
FY2028Outyear74.0
FY2029Outyear64.1
FY2030Outyear70.5
FY2031Outyear94.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 0607384BP

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 7% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$82.7M
House NDAA (HASC)HASC
$82.7M full · +$0
Senate NDAA (SASC)SASC
$82.7M full · +$0
House Approps (HAC-D)HAC_D
$89.7M +$7.0M · +8.5%
▲ $7.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

DCS Corps
$7.0M · 8.5%
CSC2 - SW S - NEXGEN WRAHP - Continuous Engineering · CPFF
Parsons - Defense & Intelligence Sector
$3.5M · 4.2%
CSC2 - SW S - Cloud Development and Delivery Platform · CPFF
Where FY2027 funding flowsShare$M
Industry primes19%16.1
Government labs & warfare centers4.4%3.6
Other / unspecified76%63.0
FY2027 request100%82.7
See DCS Corps's full federal contract ledger members
Program detail

Mission & acquisition strategy

This program element (PE) resources Operational System Development across the Understand, Protect, and Mitigate portfolios. Chemical and Biological Defense Program (CBDP) investments provide an integrated, layered capability to enable Department of War (DoW) missions in a chemical and biological environment, ranging from combat operations to domestic incident prevention and response. The Projects in this PE support the upgrade of systems that have been fielded or have received approval for full-rate production in order to maintain Joint Force readiness. Individual Projects include: - Understand (UN7): Modernization and ongoing engineering of software and information systems.

Chemical Biological Radiological Nuclear Support to Command and Control (CSC2) The acquisition strategy uses a capability portfolio management approach to drive development, engineering, and modernization of Integrated Early Warning (IEW). CSC2 employs a System of Systems methodology to iteratively enhance capabilities while maintaining existing MOD CBRN IS systems for cybersecurity and bug fixes until replaced. New modular and interoperable CSC2 products will enhance CBRN situational awareness and integrate into a Continuous Integration/Continuous Delivery (CI/CD) pipeline, ensuring operational relevance and adaptability to mission needs.

Project UN7, PT7, MT7 — Understand (Op Sys Dev)
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0607384BP is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what DCS Corps has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0607384BP (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Chemical and Biological Defense (Operational Systems Development) (PE 0607384BP)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0607384BP
Machine access
Markdown twin /programs/0607384BP.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$69.9M
▲ 26% vs FY2026
FY2026 Enacted
$55.3M
▲ 9.3% vs FY2025
FY2025 Actual
$50.6M
Prior year

Understand (Op Sys Dev) — one RDT&E project inside PE 0607384BP. Congressional marks are recorded on the program element, not on a project.

Project UN7 — Understand (Op Sys Dev) — requests $69.9M in FY2027, 85% of the $82.7M requested for program element 0607384BP. Year over year it grows 26% against FY2026.

Funding trajectory

Project UN7 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075050.6FY25ACTUAL55.3FY26ENACTED69.9FY27REQUEST59.3FY2852.9FY2959.9FY3084.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual50.6
FY2026Enacted55.3
FY2027Request69.9
FY2028Outyear59.3
FY2029Outyear52.9
FY2030Outyear59.9
FY2031Outyear84.5
Inside the project

5 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$22.0M
FY2026 enacted$26.7M
FY2027 request$35.1M

Continue engineering, integration, and delivery of the CSC2 capability set in support of new features and follow-on capability releases (CRs). Initiate the transition and removal of the Legacy CBRN Information Systems, with CSC2 capabilities to be completed in FY 2028. Transition functions and features from the Mobile Field Kit (MFK)…

Read the FY2027 plan →
FY2025 actual$10.2M
FY2026 enacted$7.2M
FY2027 request$12.7M

Continue technical refreshment of CBRN DRS, Common Analytical Laboratory System (CALS), Analytical Laboratory System (ALS) Modification (MOD), M8, Enhanced Maritime Biological Detection (EMBD) and Joint Chemical Agent Detection (JCAD) - M4A1 Obsolescence. Plans include continue sensor modernization, support equipment obsolescence…

Read the FY2027 plan →
FY2025 actual$15.0M
FY2026 enacted$18.2M
FY2027 request$16.0M

MOD MED will continue annual cyber security updates, management of hardware and software configurations, and develop additional pre-emergency use authorization (EUA) assays for diagnostic systems post MS C; complete Log Demo, complete Critical Design Review (CDR) and Operational Testing (OT) for the NGDS 1 Tech Refresh, continue…

Read the FY2027 plan →
4) Special Purpose Unit Rapid Capability Development and Deployment (SPU RCDD) - System Modernization▲ 118%
FY2025 actual$1.8M
FY2026 enacted$1.8M
FY2027 request$4.0M

Continue developing, prototyping, and maturing SO-P CB technologies to rapidly equip users with capabilities in response to new and emerging threats and opportunities. SPU RCDD develops multiple SO-P CB products that close rapid response gaps and reduce risk across the Enterprise through high risk / high reward advanced development. SPU…

5) Weapons of Mass Destruction Civil Support Teams (WMD CST)▲ 39%
FY2025 actual$1.7M
FY2026 enacted$1.5M
FY2027 request$2.0M

Initiate Unmanned Aircraft System Tether Testing. Finalize Rebreather and respiratory protection down select efforts. Begin the market research on next generation chemical detection capability to replace the MultiRAE. Continue program management and administration processes to include but not limited to program oversight, resource…

Project UN7 — every activity in full →
Who's building it

Named performers on project UN7

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

DCS Corps
$7.0M · 10%
Parsons - Defense & Intelligence Sector
$3.5M · 5.0%
BioFire Defense
$2.8M · 4.0%
Cepheid
$2.0M · 2.8%
Project detail

What project UN7 buys

The Understand Operational System Development Project provides the Joint Force continued readiness of fielded sensor, information technology and medical diagnostic capabilities and provides size, weight and power improvements to reduce logistical burden on the warfighter and services. Efforts included in this Project are: (1) Chemical Biological Radiological Nuclear Support to Command and Control (CSC2) (2) Modernization Sensors (MOD SEN) (3) Modernization Medical (MOD MED) - Fielded System Improvements and Post-Fielding Requirements (4) Special Purpose Unit Rapid Capability Development and Deployment (SPU RCDD) - System Modernization (5) Weapons of Mass Destruction Civil Support Teams (WMD CST)

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$11.8M
▼ 16% vs FY2026
FY2026 Enacted
$14.0M
▼ 36% vs FY2025
FY2025 Actual
$21.8M
Prior year

Protect (Op Sys Dev) — one RDT&E project inside PE 0607384BP. Congressional marks are recorded on the program element, not on a project.

Project PT7 — Protect (Op Sys Dev) — requests $11.8M in FY2027, 14% of the $82.7M requested for program element 0607384BP. Year over year it falls 16% against FY2026.

Funding trajectory

Project PT7 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

021.8FY25ACTUAL14.0FY26ENACTED11.8FY27REQUEST13.7FY2810.2FY299.6FY309.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual21.8
FY2026Enacted14.0
FY2027Request11.8
FY2028Outyear13.7
FY2029Outyear10.2
FY2030Outyear9.6
FY2031Outyear9.0
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

1) Modernization Protection Collective Protection (MODPROT CP)▼ 24%
FY2025 actual$9.0M
FY2026 enacted$4.3M
FY2027 request$3.3M

Continue Mobile Platform Filter Modernization testing; the mobile platform filter modernization effort consolidates 2 legacy filtration items systems (using 4 filters) on armored vehicles to 1 advanced filtration system (using 1 filter). Continue CP Modernization for Ships to reduce lifecycle costs by completing the Technical Data…

2) Modernization Protection Individual Protection (MODPROT IP)▼ 12%
FY2025 actual$12.7M
FY2026 enacted$9.6M
FY2027 request$8.5M

Continue the development and validation of concepts of operations for Fixed Wing Aircraft/Aircrew Personal Protective Ensemble (PPE) to inform pilots and aircrew on the earliest they can reduce their mission oriented protective posture (MOPP) level in a chemical and biological (CB) contested environment across multiple airframes…

Project PT7 — every activity in full →
Project detail

What project PT7 buys

The Protect Operational System Development Project provides the Joint Force the continued readiness of fielded collective and individual protective capabilities and provides size, weight and power improvements to reduce logistical burden on the warfighter and services. Efforts included in this Project are: (1) Modernization Protection Collective Protection (MODPROT CP) (2) Modernization Protection Individual Protection (MODPROT IP)

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$1.0M
▼ 87% vs FY2026
FY2026 Enacted
$8.0M
▲ 637% vs FY2025
FY2025 Actual
$1.1M
Prior year

Mitigate (Op Sys Dev) — one RDT&E project inside PE 0607384BP. Congressional marks are recorded on the program element, not on a project.

Project MT7 — Mitigate (Op Sys Dev) — requests $1.0M in FY2027, 1.3% of the $82.7M requested for program element 0607384BP. Year over year it falls 87% against FY2026.

Funding trajectory

Project MT7 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

01.1FY25ACTUAL8.0FY26ENACTED1.0FY27REQUEST1.0FY281.0FY291.0FY301.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.1
FY2026Enacted8.0
FY2027Request1.0
FY2028Outyear1.0
FY2029Outyear1.0
FY2030Outyear1.0
FY2031Outyear1.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

1) Modernization Hazard Mitigation (MOD HM)▲ 1%
FY2025 actual$1.1M
FY2026 enacted$1.0M
FY2027 request$1.0M

FY2027 planned work Continue M26 JSTDS-SS modernization by updating Government Technical Data Package. Continue M333 GPD Real Time Shelf Life (RTSL) testing that assesses the effect that storage has on decontamination chemistry and performance. Continue M339/M342 CIDAS Shelf Life Extension Testing to assess the effect of storage on the DFoS CIDAS chemistry and performance.

FY2026 to FY2027 change Minor change due to routine program adjustments.

FY2026 plans — current year Complete Advanced Threat Decontamination Kits Characterization testing. Continue M26 JSTDS-SS modernization by updating Government Technical Data Package. Initiate M333 GPD Real Time Shelf Life (RTSL) testing that assesses the effect that storage has on decontamination chemistry and performance. Initiate M339/M342 CIDAS Shelf Life Extension Testing to assess the effect of storage on the DFoS CIDAS chemistry and performance.

FY2025 accomplishments Completed M26 JSTDS-SS Equipment Assessment. Continued M26 JSTDS-SS modernization tasks by designing and testing Control Panel prototypes, developed additive manufacturing processes for spare parts through 3D printing, and analyzed condition of readiness of fielded systems for future improvements. Continued Advanced Threat Decontamination Kits Characterization Project, which seeks to expand the proven capabilities of the M295 Decontamination Kits and M100 Sorbent Decontamination Systems (SDS). Threats were prioritized by Services and tests conducted against highest priority threats. Data collected to update Technical Manuals.

Project detail

What project MT7 buys

The Mitigate Operational System Development Project provides the Joint Force continued readiness of fielded personnel and materiel contamination mitigation and chemical agent therapeutic capabilities and provides size, weight and power improvements to reduce logistical burden on the warfighter. Efforts included in this Project are: (1) Modernization Hazard Mitigation (MOD HM) (2) Congressional Nerve Agent Injection Medical Countermeasures (CONG NAI MCM)

R-3 lines of work
  • Product Development
  • Support
  • Management Services