RDT&E Program Element · President's Budget PB2027

Nuc Detonation Det Sys (sensors)

PE 1203913SF·U.S. Space Force·Approp. 3620F — RDT&E·BA7 — Operational System Development
FY2027 Request
$114.0M
◆ Development crest → decline
HitchAI read

U.S. Space Force funding ramps 18% to a $114.0M request in FY2027 — the program's peak, before stepping down 91% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. TASC leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$114.0M
▲ 18% vs FY2026
FY2026 Enacted
$96.8M
▲ 16% vs FY2025
FY2025 Actual
$83.4M
Prior year

For fiscal year 2027, the U.S. Space Force is requesting $114.0M for Nuc Detonation Det Sys (sensors) under RDT&E program element 1203913SF, up 18% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

255075100083.4FY25ACTUAL96.8FY26ENACTED114.0FY27REQUEST99.9FY2871.9FY299.3FY309.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual83.4
FY2026Enacted96.8
FY2027Request114.0
FY2028Outyear99.9
FY2029Outyear71.9
FY2030Outyear9.3
FY2031Outyear9.8
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 1203913SF

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 18% overall, which can hide much larger swings below.

Project 672808

Nuc Detonation Det Sys (sensors)

$114.0MFY2027 request ▲ 18%
FY2025 actual$83.4M
FY2026 enacted$96.8M
FY2027 request$114.0M
Product DevelopmentTest and EvaluationManagement Services

The Program Office is developing the Universal Ground NUDET Detection System (NDS) Terminal (UGNT) 7 modernization effort (Project 672808) for Guardians across Missile Warning and Missile Tracking (MW/MT) mission area. As a result, the Service will improve readiness and operational reach of existing force structure. The UGNT 7 modernization effort is the Survivable/Endurable (S/E) system capable of processing United States Nuclear Detonation (NUDET) data from the next-gen NDS payloads on Global Positioning System (GPS) IIIF. The receiver development portion is included as part of the Integrated Correlation and Display Systems (ICADS) 7 strategy. Portions of hardware and software will be replaced within the UGNT trailers. ICADS 7 software baseline will require updates and to be installed in UGNTs, enabling them to be Fully Mission Capable. These updates are required to download nuclear detonation data from GPS IIIF satellites enabling Department of War (DoW) and Combatant Command decision makers to have near-real time decision quality data for nuclear force management in support of the Nuclear Command, Control and Communication (NC3) mission set. The United States NUDET Detection System (USNDS) provides a near real-time worldwide, highly survivable/endurable capability to detect, locate, and report any nuclear detonation in the earth's atmosphere or in near space. USNDS supports NUDET detection requirements across five mission areas: Integrated Tactical Warning and Attack Assessment (ITW/AA), Nuclear Force Management (NFM), Space Control, Treaty Monitoring, and a classified mission. The USNDS program is jointly sponsored and funded by the DoW, through the Space Force, and the Department of Energy (DOE), through the National Nuclear Security Administration (NNSA) and its Nuclear Detonation Detection office (NA-22), respectively. NNSA/NA-22 supplies USNDS space sensors as Government Furnished Equipment to the Space Force's USNDS Program Office, which is responsible for all acquisition and Systems Engineering, Integration and Test activities on Space Vehicles (SVs), to include GPS and additional hosts, and their supporting ground control segments. The USSF directly funds the development of the USNDS ground segment (described below).

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$0.7M
FY2026 enacted$23.0M
FY2027 request$29.5M

Continue UGNT 7 receiver work to support satellite mission downlink that will support both fixed sites and mobile assets. Key updates address obsolescence issues of the existing receiver component, to process USNDS mission payload data. Perform initial design for hardware and software development upgrades for the UGNT.

Read the FY2027 plan →
ICADS 7▲ 14%
FY2025 actual$82.8M
FY2026 enacted$73.8M
FY2027 request$84.5M

Continue software development work for ICADS 7, finalize test planning, and start formal test campaign. The development activities are a continuation of planned contractor iteration reviews and deliveries of hardware and software. Additional system integration and checkout is also planned during this time in order to support testing and…

Read the FY2027 plan →
Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$114.0M
House NDAA (HASC)HASC
$114.0M full · +$0
Senate NDAA (SASC)SASC
$114.0M full · +$0
House Approps (HAC-D)HAC_D
$114.0M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

TASC
$3.3M · 2.9%
USNDS Enterprise SE&I
Where FY2027 funding flowsShare$M
Industry primes2.9%3.3
Government labs & warfare centers89%101.2
Other / unspecified8.3%9.5
FY2027 request100%114.0
See TASC's full federal contract ledger members
Program detail

Mission & acquisition strategy

The Program Office is developing the Universal Ground NUDET Detection System (NDS) Terminal (UGNT) 7 modernization effort (Project 672808) for Guardians across Missile Warning and Missile Tracking (MW/MT) mission area. As a result, the Service will improve readiness and operational reach of existing force structure. The UGNT 7 modernization effort is the Survivable/Endurable (S/E) system capable of processing United States Nuclear Detonation (NUDET) data from the next-gen NDS payloads on Global Positioning System (GPS) IIIF. The receiver development portion is included as part of the Integrated Correlation and Display Systems (ICADS) 7 strategy.

The USNDS Acquisition Strategy is to develop, integrate, field and sustain USNDS satellite sensors and USNDS ground data processing and distribution hardware and software as well as mission operational and technical program support to sustain the USNDS capability on GPS, DSP, Alternate Host, and SBIRS; funding is sent by Military Interdepartmental Purchase Request (MIPR) from DoW and DOE to Sandia, Los Alamos National Laboratories and other agencies on existing DOE/NNSA contracts. The ICADS 7 Acquisition Strategy was approved in September 2021 and the sole source prime contract awarded in June 2022. USNDS ICS funding for Ground Technology Program System of Systems will continue until UGNT is ready for delivery in Q3 FY 2025.

Project 672808 — Nuc Detonation Det Sys (sensors)
  • Product Development
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what TASC has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 1203913SF (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Nuc Detonation Det Sys (sensors) (PE 1203913SF)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/1203913SF
Machine access
Markdown twin /programs/1203913SF.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks