Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $271.4M for F/A-18 Squadrons under RDT&E program element 0204136N, down 31% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 328.7 |
| FY2026 | Enacted | 395.9 |
| FY2027 | Request | 271.4 |
| FY2028 | Outyear | 277.6 |
| FY2029 | Outyear | 263.4 |
| FY2030 | Outyear | 241.1 |
| FY2031 | Outyear | 245.2 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
4 projects roll up into PE 0204136N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -31% overall, which can hide much larger swings below.
F/A-18 Radar Upgrade
Physiological Episodes
Congressional Adds
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 95% | 257.9 |
| Government labs & warfare centers | 1.1% | 2.9 |
| Other / unspecified | 3.9% | 10.7 |
| FY2027 request | 100% | 271.4 |
Mission & acquisition strategy
Advanced Electronic Warfare (ADVEW) provides increased survivability and enhanced SA throughout the EM spectrum against current, expanded and complex RF threats/environment. Incremental approach to collaborative detection/jamming initiatives and Common Tactical Picture, Tactical data fusion concepts. Network Cyber Defense provides for the development of a hardware and software-based solution into the Distributed Target Processor - Network (DTP-N) in order for the network cyber defense to provide the F/A-18 E/F and EA-18G with a capability to detect an intrusion and prevent avionics terminals on the data from being corrupted by malicious software and identify when the software is not…
The F/A-18 Improvement program consists of extensive spiral development efforts mapped out in the capability-based approach F/A-18 E/F "Flight Plan". These efforts are critical to the baseline of the Super Hornet next generation mission system capability and maintaining tactical relevance in support of the Naval Aviation Plan 2030. The major programs within the F/A-18 Improvement project are based on multiple Weapon System Capabilities including: Net Centric Operations/Battle Space Management, Sensor Integration, Air to Ground and Maritime Attack, and Air to Air Attack.
- Product Development
- Support
- Test and Evaluation
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what NAWCWD has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0204136N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksF/A-18 Improvement — one RDT&E project inside PE 0204136N. Congressional marks are recorded on the program element, not on a project.
Project 1662 — F/A-18 Improvement — requests $258.5M in FY2027, 95% of the $271.4M requested for program element 0204136N. Year over year it falls 28% against FY2026.
Project 1662 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 321.7 |
| FY2026 | Enacted | 358.0 |
| FY2027 | Request | 258.5 |
| FY2028 | Outyear | 265.9 |
| FY2029 | Outyear | 252.2 |
| FY2030 | Outyear | 229.7 |
| FY2031 | Outyear | 233.7 |
12 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Funding will support final Rapid Prototyping development under the Middle Tier Acquisition effort. Funding will also support Government flight and environmental testing and final system evaluation. Funding will continue to support the Agile Software Continuous Integration, Delivery & Deployment (CID&D) for improvement and integration…
Read the FY2027 plan →Develop, test, and evaluate software changes required for the development of AGCAS for F/A-18E/F and EA-18G variants. Research changes needed to the Mission Computer (MC), Flight Control Computer (FCC), and Digital Video Map Computer (DVMC) for all blocks of F/A-18 E/F and EA-18G aircraft.
Read the FY2027 plan →Continue the development and hardware integration of GL on the F/A-18E/F and software integration on the F/A-18E/F and EA-18G. Provide aircraft integration to support two-way data and voice BLOS capability. Continue integration of two-way data and voice communication and an aperture for use over satellite constellations. Development of a…
Read the FY2027 plan →Brizo Development will continue through FY2027. The Agile software developments will also continue along with flight tests.
Continue conducting flight test, engineering development and integration of DVMC-U Minimum Viable Product (MVP) on Advanced Cockpit System (ACS) equipped F/A-18E/F and EA-18G. ACS and DVMC-U, coupled with other F/A-18E/F and EA-18G weapon system capability improvements, enable incremental upgrades providing for continued tactical…
Read the FY2027 plan →Continue Flight Plan Engineering efforts to include F/A-18E/F and EA-18G improvements necessary for relevance and tactical supremacy, and sustainment of the advantage in advanced electronic attack in the Electromagnet Spectrum. Support efforts to advance capability identification, implementation study, and integration requirements in…
Continue development, integration and qualification of the LITENING Artemis Targeting Pod Type 179 Laser. Planned activities include execution of a Critical Design Review (CDR) and updates to software, firmware and system design resulting from that review. Funding will also support procurement of mass mock-up hardware to support laser…
Read the FY2027 plan →Complete development, integration and test of the NCD software solution for inclusion in CID&D 28.
Continued development efforts to remove the dependency on the JMPS Framework, while still running on a client Windows laptop with the ability to pull the UPCs out of the JMPS runtime, pull collaboration data (where available) from the web server, and reduce the friction in going to-and-from the brick. Specifically working the AEA UPC…
Read the FY2027 plan →FY27 funding supports the continued procurement for Flight Control Computer (FCC) Shop-Replaceable Assembly (SRA) hardware redesign, software development and test planning. The F/A-18E, F/A-18F and EA-18G FCC receives inputs from the aircraft sensors and provides full authority fly-by-wire aircraft control, true airspeed, true…
Continue F/A-18 C/D pilot proficiency testing in support of Agile software capability releases. Begin developmental and operational test for the Hornet Integrated Test Team (ITT) capability upgrades as AUTOGCAS efforts complete.
Named performers on project 1662
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 1662 buys
Advanced Electronic Warfare (ADVEW) provides increased survivability and enhanced SA throughout the EM spectrum against current, expanded and complex RF threats/environment. Incremental approach to collaborative detection/jamming initiatives and Common Tactical Picture, Tactical data fusion concepts. Network Cyber Defense provides for the development of a hardware and software-based solution into the Distributed Target Processor - Network (DTP-N) in order for the network cyber defense to provide the F/A-18 E/F and EA-18G with a capability to detect an intrusion and prevent avionics terminals on the data from being corrupted by malicious software and identify when the software is not operating normally. This project funds equipping F/A-18E/F and EA-18G aircraft with an Automatic Ground Collision Avoidance System (AGCAS) to prevent Controlled Flight Into Terrain (CFIT). AGCAS continuously monitors terrain elevation data stored in the Digital Video Map Computer (DVMC) / Digital Video Map Computer Upgrade (DVMC-U), aircraft altitude (INS/GPS), and predicted flight path, to proactively identify and predict potential CFIT incidents. The system generates warnings and advisories, culminating in automatic flight control inputs to recover the aircraft and prevent collisions. F-18 modernization Global Lightning (GL) development is an integrated F/A-18E/F and EA-18G Beyond Line of Sight (BLOS) communications solution. This effort includes the development of a software defined radio, Global Lightning aperture, and resilient communication enablers. Additionally, this will encompass an aircraft integration effort to support two-way data and voice BLOS capability. This capability provides joint, multi-domain connectivity for the distributed battlespace Beyond Line of Sight (BLOS) tactical communication and puts a common tactical picture into the hands of the pilot. The capability also provides a resilient, real-time gateway between the 4th and 5th generation tactical aircraft with datalinks at the tactical edge with assured C2 and targeting from national and other off board sensors. The data is provided through multiple data paths and supports Long Range Fires in critical environments. Beyond Line of Site (BLOS) also provides tactical communications for joint, multi-domain connectivity in support of distributed battlespace.
- Product Development
- Support
- Test and Evaluation
- Management Services
F/A-18 Radar Upgrade — one RDT&E project inside PE 0204136N. Congressional marks are recorded on the program element, not on a project.
Project 2065 — F/A-18 Radar Upgrade — requests $12.2M in FY2027, 4.5% of the $271.4M requested for program element 0204136N. Year over year it grows 9.1% against FY2026.
Project 2065 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 5.8 |
| FY2026 | Enacted | 11.2 |
| FY2027 | Request | 12.2 |
| FY2028 | Outyear | 11.0 |
| FY2029 | Outyear | 10.4 |
| FY2030 | Outyear | 10.6 |
| FY2031 | Outyear | 10.8 |
2 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Continuation of AN/APG-79 software development, upgrades and interoperability with System Configuration Set (SCS). This budget provides incorporation of correction of deficiencies for: Anti-Surface Warfare (ASuW) software improvements, and Strike Accelerator/Kill Chain capabilities, Wideband Receiver and Advanced EW. Funding also…
Read the FY2027 plan →Named performers on project 2065
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2065 buys
F/A-18 Radio Detection and Ranging (RADAR) Upgrade: The F/A-18 RADAR Upgrade, Active Electronically Scanned Array (AESA) development program, which began in FY 1999, is the last of three pre-planned upgrades to the F/A-18 EF/EA-18G RADAR. The AESA system corrects operational test deficiencies noted in the AN/APG-73. It provides multi-target tracking, Synthetic Aperture RADAR (SAR) imagery, SAR Target Location Error (TLE), and improved spotlight map resolution. In addition, it provides greater lethality than previous F/A-18 RADARs by allowing full tactical support of existing and planned air-to-air (A/A) and air-to-ground (A/G) weapons and it significantly increases detection and tracking ranges. The AESA system provides greater survivability through self-protection and standoff jamming capabilities, while its greater range allows for reduced detection by enemy RADAR. The AN/APG-73 will be upgraded to AN/APG-79. This combat-proven AESA radar system substantially increases the power of the F/A-18E/F EA-18G from the front-end array to the back-end processor and operational software. This budget continues spiral capability development of AESA with increased efforts to address Phase II Operational Requirements Document requirements such as Counter-Electronic Attack (CEA) against multiple Radio Frequency Emitters, AESA Multi-Jammer Electronic Protection, Precision TLE Improvement, Monopulse and 5th/6th Channel development, and Air Combat Maneuvering/Short Range Search and Track development. This budget supports AN/APG-79 integration in Wideband Receiver and Advanced EW suite as a contributing wideband sensor. It also includes upgrades to RADAR Instrumentation, test and evaluation assets, threat assets, and upgraded modeling and simulation of both clean and Electronic Attack threat environments. This budget includes the overarching Anti-Surface Warfare (ASuW) software improvements, which includes Aided Target Recognition (AiTR), and Strike Accelerator/Kill Chain capabilities. This budget request supports development and testing of multiple module design modifications to address obsolescence issues with APG-65, APG-73 and APG-79 RADAR systems. USMC upgrades to the platform are being developed to include capability expansion of AESA Radar for F/A-18 C/D.
- Product Development
- Support
- Test and Evaluation
- Management Services
Physiological Episodes — one RDT&E project inside PE 0204136N. Congressional marks are recorded on the program element, not on a project.
Project 9099 — Physiological Episodes — requests $0.7M in FY2027, 0.3% of the $271.4M requested for program element 0204136N. Year over year it falls 1.8% against FY2026.
Project 9099 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 1.2 |
| FY2026 | Enacted | 0.7 |
| FY2027 | Request | 0.7 |
| FY2028 | Outyear | 0.7 |
| FY2029 | Outyear | 0.7 |
| FY2030 | Outyear | 0.7 |
| FY2031 | Outyear | 0.8 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Create models that are capable of detecting subsystem health anomalies using the on-board smart aircraft data. Research and explore advanced data science and machine learning to improve the individual aircraft health diagnosis and collective prognosis. Integrate anomaly detection reports into the Hornet health Assessment and Readiness Tool HhART dashboard, alongside actionable recommendations. Begin with fuels subsystem and expand model coverage to additional subsystems, such as hydraulics and avionics.
FY2026 to FY2027 change FY2026 to FY2027 decrease of ($0.013M) due to ramp down of PE program Hornet health assessment and readiness tool (Hhart).
FY2026 plans — current year Continued support of the Hornet health Assessment and Readiness Tool (HhART), and development efforts for platform improvements in the F/A-18A-F and EA-18G Weapon Systems to include flight test. Continue required logistics and engineering support.
Named performers on project 9099
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 9099 buys
Funding provides for design, development, integration, and test of platform improvements for F/A-18A-F and EA-18G Weapon Systems, as determined through a Root Cause and Corrective Action (RCCA) process, to mitigate and reduce the occurrences of Physiological Episode (PE) in Naval Aviation.
- Product Development
- Support
- Test and Evaluation
- Management Services
Congressional Adds — one RDT&E project inside PE 0204136N. Congressional marks are recorded on the program element, not on a project.
Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $271.4M requested for program element 0204136N. Year over year it falls 100% against FY2026.
Project 9999 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 0.0 |
| FY2026 | Enacted | 26.1 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
What project 9999 buys
Funding provided to support equipping F/A-18E/F and EA-18G aircraft with an Automatic Ground Collision Avoidance System (AGCAS) to prevent Controlled Flight Into Terrain (CFIT). AGCAS continuously monitors terrain elevation data stored in the Digital Map Computer (DMC)/ Digital Video Map Computer (DVMC), aircraft altitude (INS/GPS), and predicted flight path, to proactively identify and predict potential CFIT incidents. The system generates warnings and advisories, culminating in automatic flight control inputs to recover the aircraft and prevent collisions. AUTOGCAS will provide the F/A-18 with an auto recovery capability that maneuvers the aircraft away from the ground through automatic flight control surface commands until the aircraft is no longer at risk of impending CFIT. Solid State Light Off Detector: Research Development Test & Evaluation (RDT&E) funding to explore design concepts to implement a solid state light-off detector in an F414 application. The program will identify concepts to explore in addition to a qualification and implementation plan to field the design into F414 Fleet assets.
- Product Development
- Support